Search NASA⌕ Search

SEARCH · Search NASA

Results for “NiC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

NICS (NASA Instrument Capabilities Study) Instrument Schedule and Cost Study

This paper summarizes work performed on the Flight Projects Directorate Planetary Science Projects Division (PSPD, Code 430) NICS (NASA Instrument Capabilities study) instrument schedule and cost study. Included are a short summary of the original NICS (NASA, 2008), and the design and approach, data collection, analysis, preliminary findings and recommendations from select areas of the current study. The NICS (2008) was chartered by then NASA Chief Engineer Michael Ryschkewitsch and chaired by Goddard Space Flight Center (GSFC) engineer, John Leon. The focus was to identify problem areas in instrument development and, if possible, to offer solutions. In the area of instrument developments, the NICS (2008) identified a lack of resources and authority to successfully manage to instrument cost and schedule requirements; and a lack of critical skills, expertise, and leadership to successfully implement unique (one-of-a-kind) high technology developments (NASA, 2008, pp. 51, 52). Additionally, the NICS (2008) found problems in requirements formulation, reviews and management; unrealistic caps and overly optimistic estimates; and externally directed changes which increased the likelihood of overrunning cost and schedule (NASA, 2008, pp.53, 54). It is noteworthy that NICS findings are consistent with previous studies at the mission level (Robbins, Schmidt & White, 2020). Five years later in 2013, the Instrument Projects Division (IPD) was established to implement and manage instrument projects greater than $20M. The IPD was known as Code 490. Its structure incorporated several of the NICS (2008) recommendations. To see if these incorporated recommendations made a difference, and to identify other potential challenges in instrument developments, two parallel studies were initiated. Originally led by the IPD, now led by the PSPD, and the Instrument and Payload Systems Engineering Branch (IPSE, Code 592), respectively, the instrument schedule and cost study and the instrument technical complexity study began in 2017. Data collection was initiated in 2020 and is on-going. This paper is limited to the IPD/PSPD study. Among other findings, preliminary data indicate IPD/PSPD project management support positively influenced instrument development as related to providing a dedicated level of support staff, including a deputy Instrument Project Manager (dIPM), reducing IPM leadership changes, and providing other project support. Next steps include continued data collection and analysis, and mapping to technical complexity data.

NICS implementation↗

Characterization of NiC Multilayer Coating Stress for X-Ray Optic Applications

NiC multilayers have been identified as a promising coating design for hard X-ray astrophysical imaging applications enabling bandpass extension beyond the Pt K-edge of approximately 78 keV. However, these coatings are difficult to deposit with low interfacial roughness below a bilayer thickness of about 35 ˚A. Utilizing a DC magnetron sputtering system, NiC multilayer of varying d-spacings are deposited on flat Si wafers and characterized using 8.048 keV X-ray reflectometry measurements. The residual coating stress is also measured using interferometry. We investigate how deposition parameters affect both the coating quality (i.e. surface/interfacial roughness, density, etc.) and the residual coating stress. From these experimental results conducted on flat substrates, we employ FEM and ray trace simulations to determine how NiC multilayer stress could impact the figure, and therefore performance, of full shell X-ray optics.

mulitlayer↗

CommBench: Micro-Benchmarking Hierarchical Networks with Multi-GPU, Multi-NIC Nodes

Modern high-performance computing systems have multiple GPUs and network interface cards (NICs) per node. The resulting network architectures have multilevel hierarchies of subnetworks with different interconnect and software technologies. These systems offer multiple vendor-provided communication capabilities and library implementations (IPC, MPI, NCCL, RCCL, OneCCL) with APIs providing varying levels of performance across the different levels. Understanding this performance is currently difficult because of the wide range of architectures and programming models (CUDA, HIP, OneAPI). We present CommBench, a library with cross-system portability and a high-level API that enables developers to easily build microbenchmarks relevant to their use cases and gain insight into the performance (bandwidth & latency) of multiple implementation libraries on different networks. We demonstrate CommBench with three sets of microbenchmarks that profile the performance of six systems. Our experimental results reveal the effect of multiple NICs on optimizing the bandwidth across nodes and also present the performance characteristics of four available communication libraries within and across nodes of NVIDIA, AMD, and Intel GPU networks.

Hidayetoglu, Mert↗

Stuttgart Interconnection Network Project from PIX to NICS

The PIX follow-up project NICS is described. The purpose of PIX was access to X.25, the DATEX-P network of the Federal German Post Office. The development and implementation of higher protocols for levels 4-7 in the ISOSINN was the actual problem here. Results of the PIX project are given. NICS (Stuttgart Interconnection Network Project) is presented. International Protocols are reviewed. PAD service is described, which allows terminal access to DATEX-P network of the Federal German Post Office.

Source record↗

An Offload NIC for NASA, NLR, and Grid Computing

This work addresses distributed data management and access dynamically configurable high-speed access to data distributed and shared over wide-area high-speed network environments. An offload engine NIC (network interface card) is proposed that scales at nX10-Gbps increments through 100-Gbps full duplex. The Globus de facto standard was used in projects requiring secure, robust, high-speed bulk data transport. Novel extension mechanisms were derived that will combine these technologies for use by GridFTP, bandwidth management resources, and host CPU (central processing unit) acceleration. The result will be wire-rate encrypted Globus grid data transactions through offload for splintering, encryption, and compression. As the need for greater network bandwidth increases, there is an inherent need for faster CPUs. The best way to accelerate CPUs is through a network acceleration engine. Grid computing data transfers for the Globus tool set did not have wire-rate encryption or compression. Existing technology cannot keep pace with the greater bandwidths of backplane and network connections. Present offload engines with ports to Ethernet are 32 to 40 Gbps f-d at best. The best of ultra-high-speed offload engines use expensive ASICs (application specific integrated circuits) or NPUs (network processing units). The present state of the art also includes bonding and the use of multiple NICs that are also in the planning stages for future portability to ASICs and software to accommodate data rates at 100 Gbps. The remaining industry solutions are for carrier-grade equipment manufacturers, with costly line cards having multiples of 10-Gbps ports, or 100-Gbps ports such as CFP modules that interface to costly ASICs and related circuitry. All of the existing solutions vary in configuration based on requirements of the host, motherboard, or carriergrade equipment. The purpose of the innovation is to eliminate data bottlenecks within cluster, grid, and cloud computing systems, and to add several more capabilities while reducing space consumption and cost. Provisions were designed for interoperability with systems used in the NASA HEC (High-End Computing) program. The new acceleration engine consists of state-ofthe- art FPGA (field-programmable gate array) core IP, C, and Verilog code; novel communication protocol; and extensions to the Globus structure. The engine provides the functions of network acceleration, encryption, compression, packet-ordering, and security added to Globus grid or for cloud data transfer. This system is scalable in nX10-Gbps increments through 100-Gbps f-d. It can be interfaced to industry-standard system-side or network-side devices or core IP in increments of 10 GigE, scaling to provide IEEE 40/100 GigE compliance.

Awrach, James↗

Materials Data on NiC by Materials Project

NiC is Halite, Rock Salt structured and crystallizes in the cubic Fm-3m space group. The structure is three-dimensional. Ni2+ is bonded to six equivalent C2- atoms to form a mixture of edge and corner-sharing NiC6 octahedra. The corner-sharing octahedral tilt angles are 0°. All Ni–C bond lengths are 2.03 Å. C2- is bonded to six equivalent Ni2+ atoms to form a mixture of edge and corner-sharing CNi6 octahedra. The corner-sharing octahedral tilt angles are 0°.

36 MATERIALS SCIENCE↗

Computational Offload with BlueField Smart NICs

The recent introduction of a new generation of "smart NICs" have provided new accelerator platforms that include CPU cores or reconfigurable fabric in addition to traditional networking hardware and packet offloading capabilities. While there are currently several proposals for using these smartNICs for low-latency, in-line packet processing operations, there remains a gap in knowledge as to how they might be used as computational accelerators for traditional high-performance applications. This work aims to look at benchmarks and mini-applications to evaluate possible benefits of using a smartNIC as a compute accelerator for HPC applications. We investigate NVIDIA's current-generation BlueField-2 card, which includes eight Arm CPUs along with a small amount of storage, and we test the networking and data movement performance of these cards compared to a standard Intel server host. We then detail how two different applications, YASK and miniMD can be modified to make more efficient use of the BlueField-2 device with a focus on overlapping computation and communication for operations like neighbor building and halo exchanges. Our results show that while the overall compute performance of these devices is limited, using them with a modified miniMD algorithm allows for potential speedups of 5 to 20% over the host CPU baseline with no loss in simulation accuracy.

97 MATHEMATICS AND COMPUTING↗

“Smarter” NICs for faster algorithms [Slides]

The basic building block of a distributed-memory cluster or supercomputer is a node. Each node includes a host, which is a processor (xPU) + memory hierarchy. The host can communicate with other hosts via its NIC (network interface controller). A network connects the nodes. The nodes may be arranged in some topology, which determines the network’s carrying capacity and cost.

97 MATHEMATICS AND COMPUTING↗

US NIC MFC Tour Posters

The United States Nuclear Industry Council will be visiting MFC.

99 GENERAL AND MISCELLANEOUS↗

10-100 Gbps Offload NIC for WAN, NLR, and Grid Computing

An extremely fast offload engine system has been developed that operates at 60 Gigabits per second (Gbps), and has scalability to 100 Gbps full-duplex (f-d). This system is based on unique coding and architecture derived from splintered UDP (User Datagram Protocol) offload technology, resulting in unique FPGA (field programmable gate array) intellectual property core and firmware. This innovation improves the networking speed of supercomputer clusters by providing an ultra-fast network protocol processing offload from a CPU (central processing unit) by inserting an offload engine into a host backplane and network connections. This runs on protocol firmware.

Awrach, James↗

National Ice Center Visiting Scientist Program

The objectives of the work done by Dr. Kim Partington were to manage NASA's polar research program, including its strategic direction, research funding and interagency and international collaborations. The objectives of the UCAR Visiting Scientist Program at the National Ice Center (NIC) are to: (1) Manage a visiting scientist program for the NIC Science Center in support of the mission of the NIC; (2) Provide a pool of researchers who will share expertise with the NIC and the science community; (3) Facilitate communications between the research and operational communities for the purpose of identifying work ready for validation and transition to an operational environment; and (4) Act as a focus for interagency cooperation. The NIC mission is to provide worldwide operational sea ice analyses and forecasts for the armed forces of the US and allied nations, the Departments of Commerce and Transportation, and other US Government and international agencies, and the civil sector. The NIC produces these analyses and forecasts of Arctic, Antarctic, Great Lakes, and Chesapeake Bay ice conditions to support customers with global, regional, and tactical scale interests. The NIC regularly deploys Naval Ice Center NAVICECEN Ice Reconnaissance personnel to the Arctic and Antarctica in order to perform aerial ice observation and analysis in support of NIC customers. NIC ice data are a key part of the US contribution to international global climate and ocean observing systems.

Austin, Meg↗

Neural Image Compression: Generalization, Robustness, and Spectral Biases

Recent advances in neural image compression (NIC) have resulted in models which are starting to outperform traditional codecs. While this has led to growing excitement about using these methods in real-world applications, the successful adoption of any machine learning system (including NIC) in the wild requires it to generalize (and be robust) to unseen distribution shifts at deployment time. Unfortunately, current research lacks comprehensive datasets and informative tools to evaluate and understand compression performance in real-world settings. To bridge this crucial gap, first, this paper presents a comprehensive benchmark suite to evaluate the out-of-distribution (OOD) performance of image compression methods. Specifically, we design CLIC-C and Kodak-C by introducing 15 common corruptions to popular CLIC and Kodak benchmarks. Next, we propose spectrally inspired introspection tools to gain a deeper understanding of errors introduced by image compression methods as well as their OOD performance. To this end, we carry out a detailed performance comparison of the classical codec with various variants of NIC (e.g., original, variable rate, pruned), revealing intriguing findings that challenge our current understanding of the strengths and limitations of NIC. Finally, we corroborate our empirical findings with theoretical analysis, providing an in-depth view of the OOD performance of NIC. Our benchmarks, spectral introspection tools, and findings provide a crucial bridge to the real-world adoption of NIC. We hope that our work will propel future efforts in designing more robust and generalizable NIC methods.

neural networks, Variational Autoencoder, robustne↗

History and Logic Model NASA Goddard Space Flight Center Instrument and Payload Systems Engineering Technical Performance Study

Historically, some NASA missions have exceeded schedule and cost commitments. Studies suggest technical performance is a contributor. The 1980 NASA Project Management Study concluded, "one of the most significant contributors to cost and schedule growth is inadequate definition of technical and management aspects of a program..." (as cited in GAO/NSIAD-93-97, p. 11). The 1991 NASA Roles and Missions Report identified a "need for increased emphasis on technological readiness and requirements on the front end of a program" (as cited in GAO/NSIAD-93-97, p. 11). The 1992 NASA Program Costs Report stated that NASA officials identified, among other things, "insufficient definition studies... [and] program redesigns and technical complexities" as reasons for cost and schedule overruns (GAO/NSAID-93-97, p. 11). The 2002 Task Force on Acquisition of National Security Space Programs found "requirements definition and control issues, unhealthy cost bias in proposal evaluation, widespread lack of budget reserves required to implement high risk programs on schedule, and an overall underappreciation of the importance of appropriately staffed and trained system engineering staff to manage the technologically demanding and unique aspects of space programs" (DoD, 2003, p.i.) In 2007, The NASA Office of the Chief Engineer chartered the NASA Instrument Capability Study (NICS) “to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The... team was also chartered to determine if occurrences [are]... isolated cases or if there are generic issues... If the issues [are] found to be generic, the team [is] to offer solutions to recover such capability" (NICS Report, 2008, p. vi). The 2008 NICS Report, led by Goddard Space Flight Center (GSFC), identified challenges to instrument technical performance consistent with findings from previous reports. In 2017, the Instrument Project Division (IPD) Implementation Study was initiated to determine if there was a change in meeting schedule and cost commitments after implementing certain NICS recommendations. In 2018, the Instrument Technical Performance Study was initiated to determine the current state of Instrument Technical Performance in the GSFC Payload & Instrument Systems Engineering Branch. The purpose of the combined studies is to answer the question, "Is there a relationship between meeting NASA scientific instrument technical success and meeting schedule and cost commitments? If yes, what is the relationship?" References Department of Defense Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. (2003). The report of the defense science board/ air force scientific advisory board joint task force on acquisition of national security space programs. Washington DC. Government Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated. GAO/NSIAD-93-97. Washington DC. National Aeronautics and Space Administration, National Oceanic and Atmospheric Agency, Department of Defense. (2008). The NASA instrument capability study final report. NP-2008-11-058-GSFC. Washington DC.

Robbins, Geraldine↗