Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear Plant Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Understanding the nature of nuclear power plant risk

This paper describes the evolution of understanding of severe accident consequences from the non-mechanistic assumptions of WASH-740 to WASH-1400, NUREG-1150, SOARCA and today in the interpretation of the consequences of the accident at Fukushima. As opposed to the general perception, the radiological human health consequences to members of the Japanese public from the Fukushima accident will be small despite meltdowns at three reactors and loss of containment integrity. In contrast, the radiation-related societal impacts present a substantial additional economic burden on top of the monumental task of economic recovery from the nonnuclear aspects of the earthquake and tsunami damage. The Fukushima accident provides additional evidence that we have mis-characterized the risk of nuclear power plant accidents to ourselves and to the public. The human health risks are extremely small even to people living next door to a nuclear power plant. The principal risk associated with a nuclear power plant accident involves societal impacts: relocation of people, loss of land use, loss of contaminated products, decontamination costs and the need for replacement power. Although two of the three probabilistic safety goals of the NRC address societal risk, the associated quantitative health objectives in reality only address individual human health risk. This paper describes the types of analysis that would address compliance with the societal goals. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development and validation of instantaneous risk model in nuclear power plant's risk monitor

The instantaneous risk model is the fundament of calculation and analysis in a risk monitor. This study focused on the development and validation of an instantaneous risk model. Therefore the principles converting from the baseline risk model to the instantaneous risk model were studied and separated trains' failure modes modeling method was developed. The development and validation process in an operating nuclear power plant's risk monitor were also introduced. Correctness of instantaneous risk model and rationality of converting method were demonstrated by comparison with the result of baseline risk model. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Architecture and design of third Qinshan nuclear power plant risk monitor

Risk monitor is a real-time analysis tool to determine the point-in-time risk based on actual plant configuration, which is an important application of PSA (Probabilistic Safety Assessment). In this study the status and development trend of risk monitor were investigated and a risk monitor named TQRM (Third Qinshan nuclear power plant Risk Monitor) was developed. The B/S architecture and the two key computing methods pre-solved and resolving PSA model method adopted in TQRM were introduced. The functions and technical features were also presented. Now TQRM has been on-line for more than one year and used in the operation and maintenance of TQNPP. The experience demonstrates that TQRM's results are accurate and real-time, the architecture is stable, and it could be extended and maintained conveniently for any other Risk-Informed Application. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Metal fire implications for advanced reactors. Part 1, literature review.

Public safety and acceptance is extremely important for the nuclear power renaissance to get started. The Advanced Burner Reactor and other potential designs utilize liquid sodium as a primary coolant which provides distinct challenges to the nuclear power industry. Fire is a dominant contributor to total nuclear plant risk events for current generation nuclear power plants. Utilizing past experience to develop suitable safety systems and procedures will minimize the chance of sodium leaks and the associated consequences in the next generation. An advanced understanding of metal fire behavior in regards to the new designs will benefit both science and industry. This report presents an extensive literature review that captures past experiences, new advanced reactor designs, and the current state-of-knowledge related to liquid sodium combustion behavior.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Nuclear power plant risk-informed surveillance frequency control program implementation at the Duke Catawba nuclear plant with a focus on instrumentation and control systems - 333

This paper summarizes an updated process for risk-informed surveillance frequency control program (SFCP) implementation at the Catawba Nuclear Power Plant in the past year. This program includes selection and prioritization of specific target surveillance test interval extensions; and development, review, and implementation of surveillance test risk informed documented evaluation (STRIDE) packages designed to support extension of conventional surveillance requirement test intervals, in accordance with 'Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies, Industry Guideline,' NEI 04-10, Revision 1 . The scope of work associated with STRIDE development includes probabilistic risk assessment (PRA) case studies, deterministic assessment (DA) evaluations, and, where required, instrument drift evaluation (IDE). The STRIDE implementation efforts have also included support of independent decision-making panel (IDP) meetings at the implementing power stations and IDP member training. The purpose of this paper is to provide a presentation of a refined process for STRIDE development with a focus on instrumentation and control systems based on author experience, which includes support for the development of multiple STRIDE packages for the Catawba Nuclear Plant. This paper outlines a framework for practical implementation of an SFCP within the context of an integrated risk-informed performance-based regulation application program with emphasis on instrumentation and control systems. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations

The commercial nuclear sector faces unprecedented financial challenges driven by low natural gas prices and subsidized renewables in a marketplace that does not reward carbon-free baseload capacity. These circumstances, along with increasingly antiquated labor-centric operating models and analog technology, have forced the premature closure of multiple nuclear facilities and placed a much larger population of nuclear power stations at risk. Nuclear plant economic survival in current and forecasted market conditions requires an efficient and technology-centric operating model that harvests the native efficiencies of advanced technology. This is analogous to transformations in nearly every other industry. In light of previous industry experience in modernizing safety Instrumentation and Controls (I&C) systems, nuclear utilities are reluctant to pursue these upgrades due to uncertainty in licensing and cost.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Digital Infrastructure Industry Engagement

The commercial nuclear sector faces unprecedented financial challenges driven by low natural gas prices and subsidized renewables in a market that does not reward carbon-free baseload capacity. These circumstances, along with increasingly antiquated labor-centric operating models and analog technology, have forced the early closure of multiple nuclear facilities and placed a much larger population of nuclear stations at risk. Nuclear plant economic survival in current and forecasted market conditions requires an efficient and technology-centric operating model that harvests the native efficiencies of advanced technology. This is analogous to transformations that have occurred in other industries.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

I&C Modeling in SPAR Models

The Standardized Plant Analysis Risk (SPAR) models for the U.S. commercial nuclear power plants currently have very limited instrumentation and control (I&C) modeling [1]. Most of the I&C components in the operating plant SPAR models are related to the reactor protection system. This was identified as a finding during the industry peer review of SPAR models. While the Emergency Safeguard Features (ESF) actuation and control system was incorporated into the Peach Bottom Unit 2 SPAR model in a recent effort [2], various approaches to expend resources for detailed I&C modeling in other SPAR models are investigated.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NGNP Risk Management Database: A Model for Managing Risk

The Next Generation Nuclear Plant (NGNP) Risk Management System (RMS) is a database used to maintain the project risk register. The RMS also maps risk reduction activities to specific identified risks. Further functionality of the RMS includes mapping reactor suppliers Design Data Needs (DDNs) to risk reduction tasks and mapping Phenomena Identification Ranking Table (PIRTs) to associated risks. This document outlines the basic instructions on how to use the RMS. This document constitutes Revision 1 of the NGNP Risk Management Database: A Model for Managing Risk. It incorporates the latest enhancements to the RMS. The enhancements include six new custom views of risk data - Impact/Consequence, Tasks by Project Phase, Tasks by Status, Tasks by Project Phase/Status, Tasks by Impact/WBS, and Tasks by Phase/Impact/WBS.

42 ENGINEERING↗

Dynamic probabilistic risk assessment and game theory for cyber security risk analysis in nuclear power plants

Nuclear Power Plants and energy systems have become more prone to cyber-attacks with their digitalization and the increased use of smart equipment. Hence, it is important to quantify the risk associated with cyber-attacks in such systems. Dynamic Probabilistic Risk Assessment which involves studying the evolution of a system due to random events and operator and attacker actions during a cyber-attack by employing a physics-based model of the system is a suitable framework to quantify cybersecurity risk in nuclear power plants. In addition to the plant dynamics, it is also important to model the strategies of the attackers and plant operators for an effective cybersecurity risk assessment. Game theory provides a set of necessary tools to model such strategic interactions. In this research, a framework that integrates dynamic probabilistic risk assessment with game theory for cybersecurity risk analysis in nuclear power plants is presented. The mathematical formulation is derived based on the theory of continuous event trees. We propose a game theory based action model, that utilizes physics-based rewards to define the strategies of attackers and operators at every decision epoch. As a case study, the risk associated with cyber-attacks on the digital components in the secondary side of a pressurized water reactor is studied using a reduced order model. A set of attacker actions and a set of operator actions are defined for the system. The operator and attacker interactions were modelled using simultaneous game, their action policies were computed using the concept of mixed strategy Nash equilibrium and the evolution of the system was studied.

97 MATHEMATICS AND COMPUTING↗

Rich-Text based PSA Model Transformation and Verification in RiskA

Nuclear Energy is one of the most possible alternative to fossil energy in large-scale. Nuclear safety is the lifeline of nuclear energy development, and has been an important part of national security, especially after the accident of Fukushima. On the basis of computer codes, reliability engineering and Probabilistic Risk Assessment (PSA) is effective methods to improve the safety of nuclear power plants. After many years of development, the methodologies, applications and relevant soft programs have been quite sufficient in the area of nuclear safety. However, it is still difficult for the current PSA technologies and software to meet the needs of dealing with the problems of quantitatively public risk assessment in the digital society. Especially, there are so many software that adopted different modeling and analyzing methods, which brings difficulties to the comparison, evaluation or verification for different software and models. By using its own academic advantages, the advanced nuclear energy research team, i.e., FDS Team has invested a few hundreds person-years of independent research and development of a reliability and probabilistic safety assessment software system RiskA. The system consists of three main functions: device reliability optimization management, probabilistic safety assessment and instantaneous risk monitoring, and the comprehensive public risk assessment in digital society. RiskA establishes an integrated risk evaluation system for the device reliability, nuclear power plant (NPP) risk monitoring and public risk assessment. Currently, RiskA has successfully been applied in more than 600 organizations and institutes from a variety of fields in 39 countries, involving nuclear, aerospace, defense and so on. For example, RiskA has been used in the safety analysis of International Thermonuclear Experimental Reactor (ITER), FDS series fusion reactor, and the Strategic Priority Research Program of Chinese Academy of Sciences 'the Future Advanced Nuclear Fission Energy - Accelerator Driven Sub-critical (ADS) transmutation system'. Also, RiskA has been used in public risk communication and risk assessment. Among them, Third Qinshan nuclear power plant Risk Monitor (TQRM), which is the China's first domestic nuclear safety analysis software used in the actual online operation, has been highly apprised by renowned experts in the field. Meanwhile, it has been identified as the first domestic nuclear power plant risk monitoring system with completely independent intellectual property rights, and has reached the international advanced level. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Security Evaluation of Smart Cards and Secure Tokens: Benefits and Drawbacks for Reducing Supply Chain Risks of Nuclear Power Plants

The supply chain attack pathway is being increasingly used by adversaries to bypass security controls and gain unauthorized access to sensitive networks and equipment (e.g., Critical Digital Assets). Cyber-attacks targeting supply chain generally aim to compromise the environments, products, or services of vendors and suppliers to inject, add, or substitute authentic software and hardware with malicious elements. These malicious elements are deemed to be authentic as they arise from the vendor or supplier (i.e., the supply chain). This research aims to leverage findings and assumptions made from the previous report to determine the security benefits and drawbacks of a smart card- based hardware root of trust. Smart cards can provide devices inside Nuclear Power Plants (NPP) with a secure environment to store keys in and perform sensitive operations such as digital signature generation. These abilities can be leveraged to increase supply chain cybersecurity by autonomously providing NPP Licensees with reports on device integrity, authenticity and measurements of executable and non-executable data.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Procedure design of F and B operation and its impact on the risk of a nuclear power plant - 168

A feed and bleed (F and B) operation is an operator's emergency task to remove core heat from a reactor coolant system by bleeding coolant from the pressurizer, and feeding makeup water through safety injection systems under the loss of all feedwater condition. Even though the F and B operation is an important task having a significant impact on the risk of a nuclear power plant, there is a high uncertainty regarding its modeling and analysis in a PSA. This paper introduces a study on the design of an operational strategy for an F and B operation and its impact on the risk of a nuclear power plant in Korea. An intensive support analysis was conducted to understand the plant behavior and revise the success criteria for the HRA of the F and B operation. A human performance analysis on the emergency tasks was also conducted using a training simulator to generate the operator's performance time for the F and B operation. We revised the PSA model and updated the risk of the reference plant, which shows that the risk of the revised model is much higher than that of the existing model. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Peer Review of NRC Standardized Plant Analysis Risk Models

The Nuclear Regulatory Commission (NRC) Standardized Plant Analysis Risk (SPAR) Models underwent a Peer Review using ASME PRA standard (Addendum C) as endorsed by NRC in Regulatory Guide (RG) 1.200. The review was performed by a mix of industry probabilistic risk analysis (PRA) experts and NRC PRA experts. Representative SPAR models, one PWR and one BWR, were reviewed against Capability Category I of the ASME PRA standard. Capability Category I was selected as the basis for review due to the specific uses/applications of the SPAR models. The BWR SPAR model was reviewed against 331 ASME PRA Standard Supporting Requirements; however, based on the Capability Category I level of review and the absence of internal flooding and containment performance (LERF) logic only 216 requirements were determined to be applicable. Based on the review, the BWR SPAR model met 139 of the 216 supporting requirements. The review also generated 200 findings or suggestions. Of these 200 findings and suggestions 142 were findings and 58 were suggestions. The PWR SPAR model was also evaluated against the same 331 ASME PRA Standard Supporting Requirements. Of these requirements only 215 were deemed appropriate for the review (for the same reason as noted for the BWR). The PWR review determined that 125 of the 215 supporting requirements met Capability Category I or greater. The review identified 101 findings or suggestions (76 findings and 25 suggestions). These findings or suggestions were developed to identify areas where SPAR models could be enhanced. A process to prioritize and incorporate the findings/suggestions supporting requirements into the SPAR models is being developed. The prioritization process focuses on those findings that will enhance the accuracy, completeness and usability of the SPAR models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Seismic risk management solution for nuclear power plants

Nuclear power plants should safely operate during normal operations and maintain core-cooling capabilities during off-normal events, including external hazards (such as flooding and earthquakes). Management of external hazards to expectable levels of risk is critical to maintaining nuclear facility and nuclear power plant safety. Seismic risk is determined by convolving the seismic hazard with seismic fragilities (capacity of systems, structures, and components). Seismic isolation (SI) is one protective measure showing promise to minimize seismic risk. Current SI designs (used in commercial industry) reduce horizontal earthquake loads and protect critical infrastructure from the potentially destructive effects of large earthquakes. The benefit of SI application in the nuclear industry is being recognized and SI systems have been proposed in American Society of Civil Engineer Standard 4, ASCE-4, to be released in the winter of 2014, for light water reactors facilities using commercially available technology. The intent of ASCE-4 is to provide criteria for seismic analysis of safety related nuclear structures such that the responses to design basis seismic events, computed in accordance with this standard, will have a small likelihood of being exceeded. The U.S. nuclear industry has not implemented SI to date; a seismic isolation gap analysis meeting was convened on August 19, 2014, to determine progress on implementing SI in the U.S. nuclear industry. The meeting focused on the systems and components that could benefit from SI. As a result, this article highlights the gaps identified at this meeting.

99 GENERAL AND MISCELLANEOUS↗

Overview and Recommendations for Cyber Risk Assessment in Nuclear Power Plants

Digital instrumentation and control (I&C) systems are being deployed in nuclear power plants (NPPs) for both existing and advanced reactor designs. As I&C systems become more digitized to allow features like near autonomous control and remote operation, they introduce greater cyber risk to NPPs. Cyberattacks targeting industrial control systems (ICSs) are growing in both qualities and capabilities, which indicates that cybersecurity needs to be an integral part of risk assessment in the industry. Although there are some risk assessment methods in traditional information technology (IT) cybersecurity, the differences between IT and ICS cybersecurity make it infeasible to apply these risk assessment methods directly to ICSs. Some research has focused on risk assessment methods for ICSs, but few studies focus on applications to NPPs. Ideal risk frameworks for the nuclear industry are dynamic and account for system dependencies; this survey review focuses on such risk assessment methods both in and outside the nuclear field. In this article, the major challenges in cybersecurity risk assessment research are pointed out, and further research suggestions and considerations for cyber risk assessment in I&C systems are identified.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗