Search NASA⌕ Search

SEARCH · Search NASA

Results for “O&M costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Networks consolidation program: Maintenance and Operations (M&O) staffing estimates

The Mark IV-A consolidate deep space and high elliptical Earth orbiter (HEEO) missions tracking and implements centralized control and monitoring at the deep space communications complexes (DSCC). One of the objectives of the network design is to reduce maintenance and operations (M&O) costs. To determine if the system design meets this objective an M&O staffing model for Goldstone was developed which was used to estimate the staffing levels required to support the Mark IV-A configuration. The study was performed for the Goldstone complex and the program office translated these estimates for the overseas complexes to derive the network estimates.

Goodwin, J. P.↗

Prioritization of engineering support requests and advanced technology projects using decision support and industrial engineering models

The evaluation and prioritization of Engineering Support Requests (ESR's) is a particularly difficult task at the Kennedy Space Center (KSC) -- Shuttle Project Engineering Office. This difficulty is due to the complexities inherent in the evaluation process and the lack of structured information. The evaluation process must consider a multitude of relevant pieces of information concerning Safety, Supportability, O&M Cost Savings, Process Enhancement, Reliability, and Implementation. Various analytical and normative models developed over the past have helped decision makers at KSC utilize large volumes of information in the evaluation of ESR's. The purpose of this project is to build on the existing methodologies and develop a multiple criteria decision support system that captures the decision maker's beliefs through a series of sequential, rational, and analytical processes. The model utilizes the Analytic Hierarchy Process (AHP), subjective probabilities, the entropy concept, and Maximize Agreement Heuristic (MAH) to enhance the decision maker's intuition in evaluating a set of ESR's.

Tavana, Madjid↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Life cycle costing with a discount rate

This article studies life cycle costing for a capability needed for the indefinite future, and specifically investigates the dependence of optimal policies on the discount rate chosen. The two costs considered are reprocurement cost and maintenance and operations (M and O) cost. The procurement price is assumed known, and the M and O costs are assumed to be a known function, in fact, a non-decreasing function, of the time since last reprocurement. The problem is to choose the optimum reprocurement time so as to minimize the quotient of the total cost over a reprocurement period divided by the period. Or one could assume a discount rate and try to minimize the total discounted costs into the indefinite future. It is shown that the optimum policy in the presence of a small discount rate hardly depends on the discount rate at all, and leads to essentially the same policy as in the case in which discounting is not considered.

Posner, E. C.↗

O/S analysis of conceptual space vehicles

The application of recently developed computer models in determining operational capabilities and support requirements during the conceptual design of proposed space systems is discussed. The models used are the reliability and maintainability (R&M) model, the maintenance simulation model, and the operations and support (O&S) cost model. In the process of applying these models, the R&M and O&S cost models were updated. The more significant enhancements include (1) improved R&M equations for the tank subsystems, (2) the ability to allocate schedule maintenance by subsystem, (3) redefined spares calculations, (4) computing a weighted average of the working days and mission days per month, (5) the use of a position manning factor, and (6) the incorporation into the O&S model of new formulas for computing depot and organizational recurring and nonrecurring training costs and documentation costs, and depot support equipment costs. The case study used is based upon a winged, single-stage, vertical-takeoff vehicle (SSV) designed to deliver to the Space Station Freedom (SSF) a 25,000 lb payload including passengers without a crew.

Ebeling, Charles E.↗

Use of Business Intelligence Tools in the DSN

JPL has operated the Deep Space Network (DSN) on behalf of NASA since the 1960's. Over the last two decades, the DSN budget has generally declined in real-year dollars while the aging assets required more attention, and the missions became more complex. As a result, the DSN budget has been increasingly consumed by Operations and Maintenance (O&M), significantly reducing the funding wedge available for technology investment and for enhancing the DSN capability and capacity. Responding to this budget squeeze, the DSN launched an effort to improve the cost-efficiency of the O&M. In this paper we: elaborate on the methodology adopted to understand "where the time and money are used"-surprisingly, most of the data required for metrics development was readily available in existing databases-we have used commercial Business Intelligence (BI) tools to mine the databases and automatically extract the metrics (including trends) and distribute them weekly to interested parties; describe the DSN-specific effort to convert the intuitive understanding of "where the time is spent" into meaningful and actionable metrics that quantify use of resources, highlight candidate areas of improvement, and establish trends; and discuss the use of the BI-derived metrics-one of the most fascinating processes was the dramatic improvement in some areas of operations when the metrics were shared with the operators-the visibility of the metrics, and a self-induced competition, caused almost immediate improvement in some areas. While the near-term use of the metrics is to quantify the processes and track the improvement, these techniques will be just as useful in monitoring the process, e.g. as an input to a lean-six-sigma process.

Metrics↗

Integrating O/S models during conceptual design, part 1

The University of Dayton is pleased to submit this report to the National Aeronautics and Space Administration (NASA), Langley Research Center, which integrates a set of models for determining operational capabilities and support requirements during the conceptual design of proposed space systems. This research provides for the integration of the reliability and maintainability (R&M) model, both new and existing simulation models, and existing operations and support (O&S) costing equations in arriving at a complete analysis methodology. Details concerning the R&M model and the O&S costing model may be found in previous reports accomplished under this grant (NASA Research Grant NAG1-1327). In the process of developing this comprehensive analysis approach, significant enhancements were made to the R&M model, updates to the O&S costing model were accomplished, and a new simulation model developed. This is the 1st part of a 3 part technical report.

Ebeling, Charles E.↗

Improved Supportability Analysis

The University of Dayton is pleased to submit this report to the National Aeronautics and Space Administration (NASA), Langley Research Center, which updates recently developed computer models and data bases used in determining operational capabilities and support requirements during the conceptual design of proposed space systems. This research has resulted in some revisions of the reliability and maintainability (R&M) model, the development of several electronic data bases which capture the original data used in the R&M model, the collection of more recent R&M aircraft data and the integration of new shuttle data into the electronic data base and the R&M model. Descriptions of the model updates and of the electronic data bases are the subject of this report. Other details concerning the R&M model and the O&S costing model may be found in previous reports accomplished under this grant (NASA Research Grant NAG- 1-1327) which are referenced in paragraph 1.3.

Ebeling, Charles E.↗

Concept for a radioisotope powered dual mode lunar rover

Over three decades ago, the Apollo missions manifestly demonstrated the value of a lunar rover to expand the exploration activities of lunar astronauts. The stated plan of the new Vision for Space Exploration to establish a permanent presence on the moon in the next decades gives new impetus to providing long range roving and exploration capability in support of the siting, construction, and maintenance of future human bases. The incorporation of radioisotope power systems and telerobotic capability in the design has the potential to significantly expand the capability of such a rover, allowing continuous operation during the full lunar day/night cycle, as well as enabling exploration in permanently shadowed regions that may be of interest to humans for the resources they may hold. This paper describes a concept that builds on earlier studies originated in the Apollo program for a Dual Mode (crewed and telerobotic) Lunar Roving Vehicle (DMLRV). The goal of this vehicle would be to provide a multipurpose infrastructure element and remote science platform for the exploration of the moon. The DMLRV would be essential for extending the productivity of human exploration crews, and would provide a unique capability for diverse long-range, long-duration science exploration between human visits. With minimal reconfiguration this vehicle could also provide the basic platform to support a range of site survey and preparation activities in anticipation of the establishment of a permanent human presence on the moon. A conceptual design is presented for the DMLRV, including discussion of mission architecture, vehicle performance, representative science payload accommodation, and equipment and crew radiation considerations.

radioisotope power system↗

Increasing the Cost-efficiency of the DSN

JPL has operated the Deep Space Network (DSN) on behalf of NASA since the 1960's. Over the last two decades, the DSN budget has generally declined in real-year dollars while the aging assets required more attention, and the missions became more complex. As a result, the budget has been increasingly consumed by Operations and Maintenance (O and M), significantly reducing the funding wedge available for technology investment and for enhancing the DSN capability and capacity. Responding to this budget squeeze, the DSN launched an effort to improve the cost-efficiency of the O and M. In this paper we: Analyze the components of O&M. We note for example that, for the DSN, less than 20% of the staff engage in the traditional human-in-front-a-console role, so any effort to increase the cost efficiency must go beyond reducing the number of "Real-time operators." Explain the underlying organizational and cultural structures. Any cost-efficiency activities changes either accept, or carefully modify these structures. For example, the DSN O&M is based on the concept that there are three nearly identical antenna complexes separated by approximately 1200 in latitude and that each antenna complex is operated by a different contractor (driven by international agreements). Explore planned changes in the customer interface, e.g. web-based automated scheduling, and the processes required for a transition. Changes have to be evaluated in the larger end-to-end context, e.g. do the changes provide a net cost-efficiency for the DSN and the missions, or do they merely shift cost from the DSN to the missions. Consider possible significant changes in real-time pass management, e.g. full-remoting of operations, and lights-dim operations, while maintaining (or improving) the performance metrics of the DSN. Investigate how procedural and administrative changes could increase cost-efficiency, in conjunction with changes in the customer interfaces and real-time pass management. Examples would be handling of inter-governmental agreements, improved sharing of resources with other agencies, and better use of commercial (rather than government) resources

Deep Space Network (DSN)↗

A study of the relative effectiveness and cost of computerized information retrieval in the interactive mode

Results of a number of experiments to illuminate the relative effectiveness and costs of computerized information retrieval in the interactive mode are reported. It was found that for equal time spent in preparing the search strategy, the batch and interactive modes gave approximately equal recall and relevance. The interactive mode however encourages the searcher to devote more time to the task and therefore usually yields improved output. Engineering costs as a result are higher in this mode. Estimates of associated hardware costs also indicate that operation in this mode is more expensive. Skilled RECON users like the rapid feedback and additional features offered by this mode if they are not constrained by considerations of cost.

Smetana, F. O.↗

Surface Systems and Interface Standardization

Space exploration on planetary surfaces will require the use of various surface systems which will likely need to interface with one another. These systems must communicate and share data, as well as distribute power and transfer fluids for sustainable surface operations. Such systems can range from landers, surface habitats, mobility systems, cargo, and In-Situ Resource Utilizations (ISRUs). Previous and current programs have developed space interoperability standards that help aid in reducing potential risks of interface integration. One example of this is the International Deep Space Interoperability Standards (IDSIS) which focuses on deep space exploration. A goal of the Artemis program is to develop a sustained human presence on the lunar surface that would be a training ground for future Mars exploration. Therefore, it will be beneficial to identify interface standards between the surface assets which will help mitigate risk and reduce complexity in the harsh environments of space exploration. A key contribution to sustainability is commonality between hardware and software interfaces. Generic interfaces for data, power, and fluids will reduce risk, promote interoperability, and define standard interfaces across surface exploration projects and programs. Standardized interfaces would be advantageous for improving efficiency and reducing overall complexity, which are critical considerations for future space exploration. Furthermore, it will provide cost reductions to the Artemis programs over their life cycle (in Operations & Maintenance (O&M) and Logistics). Unique proprietary interfaces if considered or allowed would not only increase complexity but also add cost to the programs. Of course, understanding what will work and not work effectively in these unique environments such as the lunar surface is important. These unique environments require much needed intelligent design, prototyping, comprehensive testing, and field experience, utilizing consensus on common interface solutions.

Jaime Gomez↗

Surface Systems and Interface Standardization

A key contribution to surface systems sustainability on Lunar and planetary surfaces is commonality between hardware and software interfaces. Generic interfaces for data, power, and fluids will reduce risk, promote interoperability, and define standard interfaces across surface exploration projects and programs. Standardized interfaces would be advantageous for improving efficiency and reducing overall complexity, which are critical considerations for future space exploration. Furthermore, it will provide cost reductions to NASA’s Artemis program over its life cycle (in Operations & Maintenance (O&M) and Logistics). Unique proprietary interfaces if considered or allowed would not only increase complexity but also add cost to the programs. Of course, understanding what will work and not work effectively in these unique environments such as the lunar surface is important. These unique environments require much needed intelligent design, prototyping, comprehensive testing, and field experience, utilizing consensus on common interface solutions.

Lunar↗

Geostrophic current investigations with Seasat

The measurement of sea surface topology by SEASAT satellite allows for the detection of baroclinic or barotropic geostrophic flows, as well as the tracking of cyclonic cold core rings generated by currents. It is stipulated that SEASAT is the only system capable of measuring pressure and motion fields of a sea surface reliably, synoptically, and at an affordable cost.

Byrne, H. M.↗

Technology requirements for affordable single-stage rocket launch vehicles

A number of manned Earth-to-orbit (ETO) vehicle options for replacing or complementing the current Space Transportation System are being examined under the Advanced Manned Launch System (AMLS) study. The introduction of a reusable single-stage vehicle (SSV) into the U.S. launch vehicle fleet early in the next century could greatly reduce ETO launch costs. As a part of the AMLS study, the conceptual design of an SSV using a wide variety of enhancing technologies has recently been completed and is described in this paper. This paper also identifies the major enabling and enhancing technologies for a reusable rocket-powered SSV and provides examples of the mission payoff potential of a variety of important technologies. This paper also discusses the impact of technology advancements on vehicle margins, complexity, and risk, all of which influence the total system cost.

Stanley, Douglas O.↗

Technology Requirements for Affordable Single-Stage Rocket Launch Vehicles

A number of manned Earth-to-orbit (ETO) vehicle options for replacing or complementing the current Space Transportation System are being examined under the Advanced Manned Launch System (AMLS) study. The introduction of a reusable single-stage vehicle (SSV) into the U.S. launch vehicle fleet early in the next century could greatly reduce ETO launch costs. As a part of the AMLS study, the conceptual design of an SSV using a wide variety of enhancing technologies has recently been completed and is described in this paper. This paper also identifies the major enabling and enhancing technologies for a reusable rocket-powered SSV and provides examples of the mission payoff potential of a variety of important technologies. This paper also discusses the impact of technology advancements on vehicle margins, complexity, and risk, all of which influence the total system cost.

Stanley, Douglas O.↗

The requirements for a new full scale subsonic wind tunnel

Justification and requirements are presented for a large subsonic wind tunnel capable of testing full scale aircraft, rotor systems, and advanced V/STOL propulsion systems. The design considerations and constraints for such a facility are reviewed, and the trades between facility test capability and costs are discussed.

Kelly, M. W.↗

A Low Cost GPS System for Real-Time Tracking of Sounding Rockets

In an effort to minimize the need for costly, complex, tracking radars, the German Space Operations Center has set up a research project for GPS based tracking of sounding rockets. As part of this project, a GPS receiver based on commercial technology for terrestrial applications has been modified to allow its use under the highly dynamical conditions of a sounding rocket flight. In addition, new antenna concepts are studied as an alternative to proven but costly wrap-around antennas.

Markgraf, M.↗