Search NASA⌕ Search

SEARCH · Search NASA

Results for “OPERATIONAL PROBLEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Prevalence of typical operational problems and energy savings opportunities in U.S. commercial buildings

In the United States, as much as 30% of the 19 EJ that commercial buildings consume is considered excess. Much of the excess energy is due to the inability to manage building operations efficiently. Because almost 20% of the total primary energy consumption is associated with commercial buildings, significant energy reductions in this sector are needed to mitigate climate change. Therefore, many cities and states are mandating periodic “tune-ups” of these buildings to eliminate excess energy consumption. Although the benefits of tune-ups and retro-commissioning are clear, focusing these mandates to look for specific opportunities has been a challenge because of the lack of studies that document the prevalence of opportunities. Therefore, we analyzed building automation system data from 151 buildings across the United States to document common operational problems and opportunities to improve building operations. This analysis showed that opportunities to improve building operations exist in almost every building. These opportunities were not strongly correlated with building vintage or size, but were reflective of how the buildings are operated. The prevalence of the top 20 opportunities ranged between 74% and 23%, with 40% of these associated with air-handling units. The rest of the opportunities are associated with schedules, chilled and hot-water distribution, and zone controls. Of the 151 buildings, 69 of them implemented corrective actions of some or all opportunities that were identified. Implementation varied across the Re-tuning categories, with 60% for schedule opportunities, 50% for zone opportunities, over 40% for the air-handling unit and hot-water opportunities, and 35% of the chilled-water opportunities. There was wide variation in whole building energy savings, ranging from 0 to 50% and 0 to 18 $/m2 with median percent annual whole building savings of 12% and median normalized annual cost savings of $1.75/m2. In addition to documenting these key findings, the paper provides a list of opportunities that can be automatically and continuously identified and corrected and offers a list of those opportunities that should be the focus of the mandates.

Katipamula, Srinivas↗

Multifidelity deep operator networks for data-driven and physics-informed problems

Operator learning for complex nonlinear systems is increasingly common in modeling multi-physics and multi-scale systems. However, training such high-dimensional operators requires a large amount of expensive, high-fidelity data, either from experiments or simulations. In this work, we present a composite Deep Operator Network (DeepONet) for learning using two datasets with different levels of fidelity to accurately learn complex operators when sufficient high-fidelity data is not available. Additionally, we demonstrate that the presence of low-fidelity data can improve the predictions of physics-informed learning with DeepONets. We demonstrate the new multi-fidelity training in diverse examples, including modeling of the ice-sheet dynamics of the Humboldt glacier, Greenland, using two different fidelity models and also using the same physical model at two different resolutions.

97 MATHEMATICS AND COMPUTING↗

Evaluation of Arctic Broadband Surface Radiation Measurements

The Arctic is a challenging environment for making in-situ radiation measurements. A standard suite of radiation sensors is typically designed to measure the total, direct and diffuse components of incoming and outgoing broadband shortwave (SW) and broadband thermal infrared, or longwave (LW) radiation. Enhancements can include various sensors for measuring irradiance in various narrower bandwidths. Many solar radiation/thermal infrared flux sensors utilize protective glass domes and some are mounted on complex mechanical platforms (solar trackers) that rotate sensors and shading devices that track the sun. High quality measurements require striking a balance between locating sensors in a pristine undisturbed location free of artificial blockage (such as buildings and towers) and providing accessibility to allow operators to clean and maintain the instruments. Three significant sources of erroneous data include solar tracker malfunctions, rime/frost/snow deposition on the instruments and operational problems due to limited operator access in extreme weather conditions. In this study, a comparison is made between the global and component sum (direct [vertical component] + diffuse) shortwave measurements. The difference between these two quantities (that theoretically should be zero) is used to illustrate the magnitude and seasonality of radiation flux measurement problems. The problem of rime/frost/snow deposition is investigated in more detail for one case study utilizing both shortwave and longwave measurements. Solutions to these operational problems are proposed that utilize measurement redundancy, more sophisticated heating and ventilation strategies and a more systematic program of operational support and subsequent data quality protocols.

54 ENVIRONMENTAL SCIENCES↗

Response to “Comment on ‘Rethinking first-principles electron transport theories with projection operators: The problems caused by partitioning the basis set’” [J. Chem. Phys. 140, 177103 (2014)]

The thesis of Brandbyge's comment [J. Chem. Phys. 140, 177103 (2014)] is that our operator decoupling condition is immaterial to transport theories, and it appeals to discussions of nonorthogonal basis sets in transport calculations in its arguments. We maintain that the operator condition is to be preferred over the usual matrix conditions and subsequently detail problems in the existing approaches. From this operator perspective, we conclude that nonorthogonal projectors cannot be used and that the projectors must be selected to satisfy the operator decoupling condition. Because these conclusions pertain to operators, the choice of basis set is not germane.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Systems Safety Evaluation Based on System Thinking

Every engineer knows well and always considers about 'The local optimization makes the entire worst', and therefore well balanced design is required. Even the total safety has been assured by the safety design based on defense in depth concept, operational problem would occur by the chain of the fallacy of the defense in depth, then safety culture degradation, and finely organizational accident eventually happened. Probabilistic approach is required to the problem. We should answer to the question 'Safety Goal: How safe is safe enough?' for public acceptance. To respond to the operational problem and safety goal question, PRA, Probabilistic Risk Analysis is required. Further, Risk Communication should include comparison and selection among technical systems by risk and benefit analysis. Therefore, systems safety consideration is important based on systems thinking with considering following characteristics: - Goal-oriented- Optimization, Alternative proposals; - Global perspective- Bird's Eye; - Hierarchy- Isomorphism; - Life Cycle: Plan-Design-Construction-Use-Disposal; - Learning and Evolution. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Model-Based Integrated High Penetration Renewables Planning and Control Analysis

Increasing adoption of Solar Photovoltaic (PV) generation at the distribution level poses several changes for the reliable operation of electrical power distribution systems. The addition of a significant amount of PV to a distribution network can introduce a variety of operational problems, including steady-state overvoltages, reverse flows, voltage flicker and excessive controller movement among others. These adverse impacts can be mitigated through a variety of equipment upgrades which represent a cost to either the electric utility or the owner of the PV site. The study performed here aims to quantify the levels of PV generation which present operational problems on a distribution circuit and how those problems might be alleviated. The study performed here included 20 distribution feeders selected from Pepco Holdings, Inc. (PHI) service territory. These feeders are located in the states of Delaware, Maryland and New Jersey. A hosting capacity study was performed on each feeder to determine how much additional PV it could support in its current configuration. Several improvements were then performed on these circuits including phase balancing, capacitor redesign, reducing the voltage regulator set points, fixed power factor operation on the PV inverters and the installation of battery storage. After each of these improvements the hosting capacity of the circuit was reevaluated in order to determine how that particular improvement impacted the amount of PV that could be hosted by the circuit. Each of these improvements represents a real cost in terms of labor and equipment in order to be implemented. They are expected to provide a benefit in terms of the amount of additional PV generation which can be safely interconnected to the distribution feeder. A cost benefit analysis was performed in order to evaluate the expected costs of each feeder improvement and how each one was able to increase the PV hosting capacity of each feeder. It is hoped that these results can be utilized by other distribution utilities in order to understand how they can improve the hosting capacity of their feeders and facilitate the deployment of more PV generation at the distribution level. Admittedly other utility companies will most likely have different feeder architectures and differing labor and equipment costs so the realized cost benefit numbers may be significantly different.

14 SOLAR ENERGY↗

Comment on “Rethinking first-principles electron transport theories with projection operators: The problems caused by partitioning the basis set” [J. Chem. Phys. 139, 114104 (2013)]

In a recent paper Reuter and Harrison [J. Chem. Phys. 139, 114104 (2013)] question the widely used mean-field electron transport theories, which employ nonorthogonal localized basis sets. They claim these can violate an “implicit decoupling assumption,” leading to wrong results for the current, different from what would be obtained by using an orthogonal basis, and dividing surfaces defined in real-space. We argue that this assumption is not required to be fulfilled to get exact results. We show how the current/transmission calculated by the standard Greens function method is independent of whether or not the chosen basis set is nonorthogonal, and that the current for a given basis set is consistent with divisions in real space. The ambiguity known from charge population analysis for nonorthogonal bases does not carry over to calculations of charge flux.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Mimicking bipolar sextupole power supplies for low-energy operations at RHIC

RHIC operated at energies below the nominal ion injection energy of E=9.8 GeV/u in 2010. Earlier test runs and magnet measurements indicated that all defocusing sextupole unipolar power supplies should be reversed to provide the proper sign of chromaticity. However, vertical chromaticity at E=3.85 GeV/u with this power supply configuration was still not optimal. This uncertainty inspired a new machine configuration where only half of the defocusing sextupole power supplies were reversed, taking advantage of the flexibility of the RHIC nonlinear chromaticity correction system to mimic bipolar sextupoles. This configuration resulted in a 30 percent luminosity gain and eliminated the need for further polarity changes for later 2010 low energy physics operations. Here we describe the background to this problem, operational experience, and RHIC online model changes to implement this solution.

43 PARTICLE ACCELERATORS↗

The Physics Imposed on a Streaming Operator by Spherical Transport Problems

The streaming operator, which generates a displacement of a particle on a straight line at a constant speed in transport theory, is derived algebraically from a spherical coordinate formulation of Newton’s second law. This derivation leads to an operator that has more partial derivatives than a Cartesian coordinate formulation of the operator. The additional partial derivatives, which are with respect to the normalized velocity variables of a particle, take into account the intrinsic curvature of a ball. Moreover, these partial derivatives mitigate ray effects, which arise when a finite number of normalized velocities (also called directions or discrete ordinates) are used to simulate a continuous S 2 sphere of directions, by rotating the polar axis of the S 2 sphere into the radial direction of the coordinate system. As a consequence of this rotation, the number of actual discrete ordinates is greatly amplified to an enormous number of effective discrete ordinates by a multiplier that is equal to the number of patches that partitions a spherical surface. In addition to the derivation of the streaming operator, we provide in closed form a solution to the system of characteristic equations that is equivalent to the streaming operator. Furthermore, the solution to the system of characteristic equations enables the construction of an integral operator that is the inverse to the streaming operator. Examples in which ray effects are immensely mitigated by spherical coordinates are presented.

integral operator↗

A Rinsing Effluent Evaporator for Dismantling Operations - 13271

Between 1958 and 1997, the UP1 plant at Marcoule - located in the south of France - reprocessed and recycled nearly 20,000 MT of used fuel from special defense applications reactors, as well as fuel from the first generation of electricity generating reactors in France (natural uranium fuel, CO{sub 2}-cooled, graphite-moderated). Decommissioning and Dismantling of the UP1 plant and its associated units started in 1998. Since 2005, the UP1 facility has been operated by AREVA as the Marcoule Management and Operation contractor for French Atomic Energy Commission (CEA). An important part of this decommissioning program deals with the vitrification facility of Marcoule. This facility includes 20 tanks devoted to interim storage of highly active solutions, prior to vitrification. In 2006, a rinsing program was defined as part of the tank cleanup strategy. The main objective of the rinsing phases was to decrease activity in order to limit the volume of 'long-life active' waste produced during the decommissioning operations, so the tanks can be dismantled without the need of remote operations. To enable this rinsing program, and anticipating large volumes of generated effluent, the construction of an evaporation unit proved to be essential. The main objective of this unit was to concentrate the effluent produced during tank rinsing operations by a factor of approximately 10, prior to it being treated by vitrification. The evaporator design phase was launched in September 2006. The main challenge for the Project team was the installation of this new unit within a nuclear facility still in operation and in existing compartments not initially designed for this purpose. Cold operating tests were completed in 2008, and in May 2009, the final connections to the process were activated to start the hot test phase. During the first hot test operations performed on the first batches of clean-up effluent, the evaporator had a major operating problem. Extremely large quantities of foam were produced, affecting the evaporator operation, and creating the risk of a reduction in its capacity and throughput performance. A task force of AREVA process, operations, and safety experts from Marcoule and the La Hague reprocessing complex was assembled. New operating parameters were defined and tested to improve the process. Since then, the evaporator has performed very satisfactorily. The foam buildup phenomenon has been brought under complete control. All the different types of effluents produced during cleanup operations have been concentrated, and the results obtained in terms of quality and throughput, have ensured a consistent supply to the vitrification unit. The evaporator was operated until the end of April 2012, and enabled the production of 500 cubic meters of very high activity effluent, concentrating the fission products rinsed from the storage tanks. The evaporator will now be deactivated and decommissioned, with the first rinsing and cleanup operations scheduled to begin in 2014. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Variational stability of optimal control problems involving subdifferential operators

This paper is concerned with the problem of minimizing an integral functional with control-nonconvex integrand over the class of solutions of a control system in a Hilbert space subject to a control constraint given by a phase-dependent multivalued map with closed nonconvex values. The integrand, the subdifferential operators, the perturbation term, the initial conditions and the control constraint all depend on a parameter. Along with this problem, the paper considers the problem of minimizing an integral functional with control-convexified integrand over the class of solutions of the original system, but now subject to a convexified control constraint. By a solution of a control system we mean a 'trajectory-control' pair. For each value of the parameter, the convexified problem is shown to have a solution, which is the limit of a minimizing sequence of the original problem, and the minimal value of the functional with the convexified integrand is a continuous function of the parameter. This property is commonly referred to as the variational stability of a minimization problem. An example of a control parabolic system with hysteresis and diffusion effects is considered. Bibliography: 24 titles.

97 MATHEMATICS AND COMPUTING↗