Search NASA⌕ Search

SEARCH · Search NASA

Results for “ORION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Orion Crew Module / Service Module Structural Weight and Center of Gravity Simulator and Vehicle Motion Simulator Hoist Structure for Orion Service Module Umbilical Testing

An Orion Crew Module Service Module Structural Weight and Center of Gravity Simulator and a Vehicle Motion Simulator Hoist Structure for Orion Service Module Umbilical Testing were designed during a summer 2014 internship in Kennedy Space Centers Structures and Mechanisms Design Branch. The simulator is a structure that supports ballast, which will be integrated into an existing Orion mock-up to simulate the mass properties of the Exploration Mission-1 flight vehicle in both fueled and unfueled states. The simulator mimics these configurations through the use of approximately 40,000 lbf of steel and water ballast, and a steel support structure. Draining four water tanks, which house the water ballast, transitions the simulator from the fueled to unfueled mass properties. The Ground Systems Development and Operations organization will utilize the simulator to verify and validate equipment used to maneuver and transport the Orion spacecraft in its fueled and unfueled configurations. The second design comprises a cantilevered tripod hoist structure that provides the capability to position a large Orion Service Module Umbilical in proximity to the Vehicle Motion Simulator. The Ground Systems Development and Operations organization will utilize the Vehicle Motion Simulator, with the hoist structure attached, to test the Orion Service Module Umbilical for proper operation prior to installation on the Mobile Launcher. Overall, these two designs provide NASA engineers viable concepts worthy of fabricating and placing into service to prepare for the launch of Orion in 2017.

VMS↗

THE ORION H ii REGION AND THE ORION BAR IN THE MID-INFRARED

We present mid-infrared photometry of the Orion bar obtained with the Faint Object infraRed Camera for the SOFIA Telescope (FORCAST) on board SOFIA at 6.4, 6.6, 7.7, 19.7, 31.5, and 37.1 μ m. By complementing this observation with archival FORCAST and Herschel /PACS images, we are able to construct a complete infrared spectral energy distribution of the Huygens region in the Orion nebula. Comparing the infrared images with gas tracers, we find that PACS maps trace the molecular cloud, while the FORCAST data trace the photodissociation region (PDR) and the H ii region. Analysis of the energetics of the region reveal that the PDR extends for 0.28 pc along the line of sight and that the bar is inclined at an angle of 4°. The infrared and submillimeter images reveal that the Orion bar represents a swept-up shell with a thickness of 0.1 pc. The mass of the shell implies a shock velocity of ≃3 km s{sup −1} and an age of ≃10{sup 5} years for the H ii region. Our analysis shows that the UV and infrared dust opacities in the H ii region and the PDR are a factor 5 to 10 lower than in the diffuse interstellar medium. In the ionized gas, Ly α photons are a major source of dust heating at distances larger than ≃0.06 pc from θ {sup 1} Ori C. Dust temperatures can be explained if the size of the grains is between 0.1 and 1 μ m. We derive the photoelectric heating efficiency of the atomic gas in the Orion bar. The results are in good qualitative agreement with models and the quantitative differences indicate a decreased polycyclic aromatic hydrocarbon abundance in this region.

79 ASTRONOMY AND ASTROPHYSICS↗

NGC 1980 Is Not a Foreground Population of Orion: Spectroscopic Survey of Young Stars with Low Extinction in Orion A

We perform a spectroscopic survey of the foreground population in Orion A with MMT/Hectospec. We use these data, along with archival spectroscopic data and photometric data, to derive spectral types, extinction values, and masses for 691 stars. Using the Spitzer Space Telescope data, we characterize the disk properties of these sources. We identify 37 new transition disk (TD) objects, 1 globally depleted disk candidate, and 7 probable young debris disks. We discover an object with a mass of less than 0.018–0.030 M {sub ⊙}, which harbors a flaring disk. Using the H α emission line, we characterize the accretion activity of the sources with disks, and confirm that the fraction of accreting TDs is lower than that of optically thick disks (46% ± 7% versus 73% ± 9%, respectively). Using kinematic data from the Sloan Digital Sky Survey and APOGEE INfrared Spectroscopy of the Young Nebulous Clusters program (IN-SYNC), we confirm that the foreground population shows similar kinematics to their local molecular clouds and other young stars in the same regions. Using the isochronal ages, we find that the foreground population has a median age of around 1–2 Myr, which is similar to that of other young stars in Orion A. Therefore, our results argue against the presence of a large and old foreground cluster in front of Orion A.

79 ASTRONOMY AND ASTROPHYSICS↗

Orion's Cloak - A rapidly expanding shell of gas centered on the Orion OB1 association

The structure of the interstellar gas surrounding the Orion OB1 association and the neighboring lambda Orionis association is detailed. UV absorption lime spectra of various ionization stages of C, N, Si and S in the directions of 12 stars were obtained by means of the spectrometer on board the Copernicus satellite. The presence of a shell of material surrounding the two associations and expanding at 100 to 120 km/sec, designated Orion's Cloak, was revealed, together with sporadically occurring higher column density matter at lower velocities. Results are interpreted to indicate the presence of a rapidly moving radiative shock outside the H II region of the association stars and inside this feature, a lower velocity, higher column density cloud which appears to be directly ionized by association stars. It is suggested that the gas features are caused by the effects of a recent supernova and of multiple supernovae, stellar winds and rocket-accelerated clouds in addition to stellar ionization.

Cowie, L. L.↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

Operations of the Optical Communications Demonstration for the Orion EM-2 Mission

The GSFC implementation of an Optical Communication System to demonstrate an operational optical communication link for Orion EM-2. It will serve as a base for providing an operational optical communications capability for future Orion missions. GSFC plans to maintain a development path for the optical communication flight terminal to allow commercialization and implementation on future Orion missions. The Orion optical module part of the optical communications flight terminal and its control electronics have a common architecture with the ILLUMA-T optical terminal provided by GSFC for use on the ISS. The plan is to flow data from Orion through the Optical Communication Fight Terminal to the Optical Communication Ground Terminal and reverse. NASA's Orion spacecraft is an exploratory vehicle designed for longer-duration flights beyond the Moon. Following Orion's Exploration Mission-1 (EM-1), during which the spacecraft will travel beyond the Moon, enter a distant retrograde orbit around the Moon and return to Earth unmanned, Exploration Mission-2 (EM-2) will see a crewed spacecraft complete a slightly different flight path. First crewed test flight of the Orion spacecraft, currently targeting a June 30, 2022 launch. The mission involves: One revolution in Low Earth Orbit (LEO) parking orbit to verify basic Orion systems functionality and deploy solar arrays. A single 42-hour Highly Elliptical Orbit (HEO) intermediate checkout orbit allows characterization of the Orion vehicle system performance prior to committing to a cis-lunar flight. Trans Lunar Injection (TLI) burn using Orion Service Module (SM) main engine, which sends Orion on a lunar flyby and free return. Skip reentry at lunar return velocities to splashdown off the coast of San Diego. Total mission duration is approximately 10 days. EM-2 is the first crewed mission of the Orion Spacecraft that crew brings more video up/downloads, file transfers, and real-time chats with family back home and high-rate communications enables live HD streaming for Crew conferences, Public Affairs Office (PAO) events, and significant mission events. Also still collecting vehicle data on numerous Orion subsystems via Development Flight Instrumentation (DFI) allows large data volume returns sooner for DFI and future science payloads, as opposed to waiting for end-of-mission. O2O is a demonstration of operational utility system tested as a Developmental Test Objective (DTO) and not required to meet mission requirements/success/ Flight Test Objectives (FTO). EM-2 architecture is as close to future mission operational architecture as possible.Orion subsystems (video, DFI, etc.) expected to generate ~250 GB of data in the first 24 hours of flight. Total data generated over the mission estimated to be more than 400 GBUsing S-Band alone, Orion limited to ~ 6GB of data downlink per day. Because of this limitation, Orion is planning to limit live video downlinks on EM-1 in order to downlink high priority fileswith 1 hour/day of Optical Communication, Orion could downlink ~6x more data per day (~ 36GB/day).The optical communication system is capable of multiple data rates up to at least 80 Mbps downlink for the transfer of Orion data to Earth while Orion is operating in the lunar vicinity.

Optical Communication↗

Orion Launch Abort System Performance on Exploration Flight Test 1

This paper will present an overview of the flight test objectives and performance of the Orion Launch Abort System during Exploration Flight Test-1. Exploration Flight Test-1, the first flight test of the Orion spacecraft, was managed and led by the Orion prime contractor, Lockheed Martin, and launched atop a United Launch Alliance Delta IV Heavy rocket. This flight test was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety. This test included the first flight test of the Launch Abort System preforming Orion nominal flight mission critical objectives. NASA is currently designing and testing the Orion Multi-Purpose Crew Vehicle (MPCV). Orion will serve as NASA's new exploration vehicle to carry astronauts to deep space destinations and safely return them to earth. The Orion spacecraft is composed of four main elements: the Launch Abort System, the Crew Module, the Service Module, and the Spacecraft Adapter (Fig. 1). The Launch Abort System (LAS) provides two functions; during nominal launches, the LAS provides protection for the Crew Module from atmospheric loads and heating during first stage flight and during emergencies provides a reliable abort capability for aborts that occur within the atmosphere. The Orion Launch Abort System (LAS) consists of an Abort Motor to provide the abort separation from the Launch Vehicle, an Attitude Control Motor to provide attitude and rate control, and a Jettison Motor for crew module to LAS separation (Fig. 2). The jettison motor is used during a nominal launch to separate the LAS from the Launch Vehicle (LV) early in the flight of the second stage when it is no longer needed for aborts and at the end of an LAS abort sequence to enable deployment of the crew module's Landing Recovery System. The LAS also provides a Boost Protective Cover fairing that shields the crew module from debris and the aero-thermal environment during ascent. Although the Orion Program has tested a number of the critical systems of the Orion spacecraft on the ground, the launch environment cannot be replicated completely on Earth. A number of flight tests have been conducted and are planned to demonstrate the performance and enable certification of the Orion Spacecraft. Exploration Flight Test 1, the first flight test of the Orion spacecraft, was successfully flown on December 5, 2014 from Cape Canaveral Air Force Station's Space Launch Complex 37. Orion's first flight was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety, such as heat shield performance, separation events, avionics and software performance, attitude control and guidance, parachute deployment and recovery operations. One of the key separation events tested during this flight was the nominal jettison of the LAS. Data from this flight will be used to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. The LAS nominal jettison event on Exploration Flight Test 1 occurred at six minutes and twenty seconds after liftoff (See Fig. 3). The abort motor and attitude control motors were inert for Exploration Flight Test 1, since the mission did not require abort capabilities. A suite of developmental flight instrumentation was included on the flight test to provide data on spacecraft subsystems and separation events. This paper will focus on the flight test objectives and performance of the LAS during ascent and nominal jettison. Selected LAS subsystem flight test data will be presented and discussed in the paper. Exploration Flight Test -1 will provide critical data that will enable engineering to improve Orion's design and reduce risk for the astronauts it will protect as NASA continues to move forward on its human journey to Mars. The lessons learned from Exploration Flight Test 1 and the other Flight Test Vehicles will certainly contribute to the vehicle architecture of a human-rated space launch vehicle.

McCauley, R.↗

Orion Handling Qualities During ISS Rendezvous and Docking

The Orion spacecraft was designed to rendezvous with multiple vehicles in low earth orbit (LEO) and beyond. To perform the required rendezvous and docking task, Orion must provide enough control authority to perform coarse translational maneuvers while maintaining precision to perform the delicate docking corrections. While Orion has autonomous docking capabilities, it is expected that final approach and docking operations with the International Space Station (ISS) will initially be performed in a manual mode. A series of evaluations was conducted by NASA and Lockheed Martin at the Johnson Space Center to determine the handling qualities (HQ) of the Orion spacecraft during different docking and rendezvous conditions using the Cooper-Harper scale. This paper will address the specifics of the handling qualities methodology, vehicle configuration, scenarios flown, data collection tools, and subject ratings and comments. The initial Orion HQ assessment examined Orion docking to the ISS. This scenario demonstrates the Translational Hand Controller (THC) handling qualities of Orion. During this initial assessment, two different scenarios were evaluated. The first was a nominal docking approach to a stable ISS, with Orion initializing with relative position dispersions and a closing rate of approximately 0.1 ft/sec. The second docking scenario was identical to the first, except the attitude motion of the ISS was modeled to simulate a stress case ( 1 degree deadband per axis and 0.01 deg/sec rate deadband per axis). For both scenarios, subjects started each run on final approach at a docking port-to-port range of 20 ft. Subjects used the THC in pulse mode with cues from the docking camera image, window views, and range and range rate data displayed on the Orion display units. As in the actual design, the attitude of the Orion vehicle was held by the automated flight control system at 0.5 degree deadband per axis. Several error sources were modeled including Reaction Control System (RCS) jet angular and position misalignment, RCS thrust magnitude uncertainty, RCS jet force direction uncertainty due to self plume impingement, and Orion center of mass uncertainty.

Hart, Jeremy J.↗

NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning tools included Kaizen/Lean events, mockups and human factors analysis. The majority of products developed by this team are applicable as KSC prepares 21st Century Ground Systems for the Orion Multi-Purpose Crew Vehicle and Space Launch System.

Letchworth, Gary↗

Avionics System Architecture for NASA Orion Vehicle

This viewgraph presentation reviews the Orion Crew Exploration Vehicle avionics architecture. The contents include: 1) What is Orion?; 2) Orion Concept of Operations; 3) Orion Subsystems; 4) Orion Avionics Architecture; 5) Orion Avionics-Network; 6) Orion Network Unification; 7) Orion Avionics-Integrity; 8) Orion Avionics-Partitioning; and 9) Orion Avionics-Redundancy.

Baggerman, Clint↗

ORION: Operational FoRecastIng Of INduced Seismicity

The Operational Forecasting of Induced Seismicity toolkit “ORION” (ORION) is an open-source, observation-based ensemble forecasting toolkit which is geared towards helping operators understand the seismic hazard (i.e., probabilistic assessment of the magnitude and frequency of induced seismic events) at a site. ORION analyzes how the seismic hazard evolves during injection and suggests possible mitigation strategies to employ if an earthquake that exceeds certain threshold is observed. Through its ensemble modeling approach, ORION leverages the benefits of statistical-, physics-, and machine learning-based forecasting methodologies, while reducing the impact of each model’s respective limitations. The ORION toolkit consists of an easy-to-use GUI interface that affords a user as much or as little interaction as desired. Advanced capabilities allow the user to upload local, high-precision earthquake catalogs, projected injection profiles and/or spatiotemporal estimates of pressure/stress, and to tune various model parameters. ORION will then provide a spatial and temporal ensemble forecast of seismicity defined as the probability of exceedance of a given earthquake magnitude over a forecast period. Additionally, ORION will provide probability distribution of the statistically derived maximum possible earthquake magnitude that may be expected. Finally, ORION will provide suggested operational management strategies (e.g. reduce injection volumes at specific wells) based on the level of hazard.

NRAP,NRAP Tools,ORION,Operational Forcasting of In↗

The Orion Pad Abort 1 (PA-1) Flight Test: A Propulsion Success

This poster provides a concise overview of the highly successful Orion Pad Abort 1 (PA-1) flight test, and the three rocket motors that contributed to this success. The primary purpose of the Orion PA-1 flight was to help certify the Orion Launch Abort System (LAS), which can be utilized in the unlikely event of an emergency on the launchpad or during mission vehicle ascent. The PA-1 test was the first fully integrated flight test of the Orion LAS, one of the primary systems within the Orion Multi-Purpose Crew Vehicle (MPCV). The Orion MPCV is part of the architecture within the Space Launch System (SLS), which is being designed to transport astronauts beyond low-Earth orbit for future exploration missions. Had the Orion PA-1 flight abort occurred during launch preparations for a real human spaceflight mission, the PA-1 LAS would have saved the lives of the crew. The PA-1 flight test was largely successful due to the three solid rocket motors of the LAS: the Attitude Control Motor (ACM); the Jettison Motor (JM); and the Abort Motor (AM). All three rocket motors successfully performed their required functions during the Orion PA-1 flight test, flown on May 6, 2010 at the White Sands Missile Range in New Mexico, culminating in a successful demonstration of an abort capability from the launchpad.

JM↗

Orion Launch Abort System (LAS) Propulsion on Pad Abort 1 (PA-1)

This presentation provides a concise overview of the highly successful Orion Pad Abort 1 (PA-1) flight test, and the three rocket motors that contributed to this success. The primary purpose of the Orion PA-1 flight was to help certify the Orion Launch Abort System (LAS), which can be utilized in the unlikely event of an emergency on the launchpad or during mission vehicle ascent. The PA-1 test was the first fully integrated flight test of the Orion LAS, one of the primary systems within the Orion Multi-Purpose Crew Vehicle (MPCV). The Orion MPCV is part of the architecture within the Space Launch System (SLS), which is being designed to transport astronauts beyond low-Earth orbit for future exploration missions. Had the Orion PA-1 flight abort occurred during launch preparations for a real human spaceflight mission, the PA-1 LAS would have saved the lives of the crew. The PA-1 flight test was largely successful due to the three solid rocket motors of the LAS: the Attitude Control Motor (ACM); the Jettison Motor (JM); and the Abort Motor (AM). All three rocket motors successfully performed their required functions during the Orion PA-1 flight test, flown on May 6, 2010 at the White Sands Missile Range in New Mexico, culminating in a successful demonstration of an abort capability from the launchpad.

SLS↗

Orion GN and C Overview and Architecture

The Crew Exploration Vehicle, named Orion, is a critical element in the Constellation Program to develop the transportation system needed to send humans back to the moon and then beyond. Lockheed Martin is the prime contractor for the Orion spacecraft, which is managed by the Johnson Space Center. The Orion GN&C sub-system is being jointly developed by NASA and Lockheed Martin through a mode team approach. The GN&C is a critical element of the Orion mission to carry astronauts to low earth orbit to service the International Space Station and then on later flights to transfer and return a crew of four to the moon. The Orion GN&C system must perform monitoring and abort functions during ascent, rendezvous and docking in both low earth and lunar orbits, perform uncrewed lunar loiter operations, perform trans earth injection and atmospheric entry and landing. The Orion also must be integrated with the Ares I Crew Launch Vehicle, the Earth Departure Stage of the Ares V and the Lunar Surface Access Module. This paper provides an overview of the Orion GN&C system. The functional capabilities of the Orion GN&C will be provided in the context of Constellation architecture, the key GN&C requirements will be summarized, the GN&C architecture will be presented, the development schedule and plans will summarized and finally conclusions will be presented.

Hu, Howard↗

Orion GNC Mitigation Efforts for Van Allen Radiation

The Orion Crew Module (CM) is NASA's next generation manned space vehicle, scheduled to return humans to lunar orbit in the coming decade. The Orion avionics and GN&C architectures have progressed through a number of project phases and are nearing completion of a major milestone. The first unmanned test mission, dubbed "Exploration Flight Test One" (EFT-1) is scheduled to launch from NASA Kennedy Space Center late next year and provides the first integrated test of all the vehicle systems, avionics and software. The EFT-1 mission will be an unmanned test flight that includes a high speed re-entry from an elliptical orbit, which will be launched on an expendable launch vehicle (ELV). The ELV will place CM and the ELV upper stage into a low Earth orbit (LEO) for one revolution. After the first LEO, the ELV upper stage will re-ignite and place the combined upper stage/CM into an elliptical orbit whose perigee results in a high energy entry to test CM response in a relatively high velocity, high heating environment. While not producing entry velocities as high as those experienced in returning from a lunar orbit, the trajectory was chosen to provide higher stresses on the thermal protection and guided entry systems, as compared against a lower energy LEO entry. However the required entry geometry with constraints on inclination and landing site result in a trajectory that lingers for many hours in the Van Allen radiation belts. This exposes the vehicle and avionics to much higher levels of high energy proton radiation than a typical LEO or lunar trajectory would encounter. As a result, Van Allen radiation poses a significant risk to the Orion avionics system, and particularly the Flight Control Module (FCM) computers that house the GN&C flight software. The measures taken by the Orion GN&C, Flight Software and Avionics teams to mitigate the risks associated with the Van Allen radiation on EFT-1 are covered in the paper. Background on the Orion avionics subsystem is provided, as well as an overview of the GN&C software architecture. The measures taken to handle radiation induced failure of the one or both of the FCM's are presented, and finally simulation and actual hardware-in-the-loop (HWIL) results are shown confirming the validity of the implementation. The paper presents an overview of the Orion avionics architecture describing the GNC sensors, onboard data network as well as the flight control computers and their planned restart capabilities. GN&C sensors include two Orion Inertial Measurement Units (OIMU's), a Vision Processing Unit (VPU) to process camera images, three barometric altimeters and a single GPS receiver. All of the sensors communicate to one of two Power and Data Units (PDU's). The PDU's multiplex analog and serial data from the sensors and write the data to the Orion Data Network (ODN). The OIMU s write measurement messages directly as onto the ODN, but they are routed through PDU network switches.

King, Ellis T.↗

Orion Launch Abort System Performance During Exploration Flight Test 1

The Orion Launch Abort System Office is taking part in flight testing to enable certification that the system is capable of delivering the astronauts aboard the Orion Crew Module to a safe environment during both nominal and abort conditions. Orion is a NASA program, Exploration Flight Test 1 is managed and led by the Orion prime contractor, Lockheed Martin, and launched on a United Launch Alliance Delta IV Heavy rocket. Although the Launch Abort System Office has tested the critical systems to the Launch Abort System jettison event on the ground, the launch environment cannot be replicated completely on Earth. During Exploration Flight Test 1, the Launch Abort System was to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. Exploration Flight Test 1 was successfully flown on December 5, 2014 from Cape Canaveral Air Force Station's Space Launch Complex 37. This was the first flight test of the Launch Abort System preforming Orion nominal flight mission critical objectives. The abort motor and attitude control motors were inert for Exploration Flight Test 1, since the mission did not require abort capabilities. Exploration Flight Test 1 provides critical data that enable engineering to improve Orion's design and reduce risk for the astronauts it will protect as NASA continues to move forward on its human journey to Mars. The Exploration Flight Test 1 separation event occurred at six minutes and twenty seconds after liftoff. The separation of the Launch Abort System jettison occurs once Orion is safely through the most dynamic portion of the launch. This paper will present a brief overview of the objectives of the Launch Abort System during a nominal Orion flight. Secondly, the paper will present the performance of the Launch Abort System at it fulfilled those objectives. The lessons learned from Exploration Flight Test 1 and the other Flight Test Vehicles will certainly contribute to the vehicle architecture of a human-rated space launch vehicle.

McCauley, Rachel↗