ASCEND: On-orbit/On-surface Servicing, Assembly, and Manufacturing (OSAM) Architecture Simulation System (OASiS)
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Roundtable Session on In-Space Developmental Test: Springboard for Rapid Development. Presentation is a brief description of the On-orbit Servicing Assembly & Manufacturing (OSAM) national initiative & using standard EELV Secondary Payload Adapters (ESPAs) as the core building block to construct an ESPA-Star based implementation for an iSDT persistent platform in space.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This document compiles and organizes the current state of OSAM missions, capabilities, and developments. Understanding where the set of capabilities currently stand will help mission designers incorporate OSAM technologies into their concepts, create the starting point for technology development plans and roadmaps, and provide technologists a survey of the field they are developing. The authors recognize that this capability is broad and that they are unlikely to have captured everything that has been or is being done in the area on the first attempt. As a result, a new version of the OSAM State of Play will be released periodically (perhaps annually).
This presentation is for the On-orbit Servicing, Assembly, and Manufacturing (OSAM) Technology Transfer Workshop. The content discusses materials research done to date, and research that is ongoing, applicable to OSAM applications. The talk includes content from the In-Space Manufacturing and Moon to Mars Planetary Autonomous Construction Technology projects.
National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.
For several decades, NASA has employed in-space systems to enhance the performance and extend the useful life of operational orbital assets. In at least one case, an operational mission was not only enhanced, but enabled – the International Space Station was made possible by crewed and robotic in-space assembly, and continues to support installation and operation of new science and technology payloads. In several cases (Hubble Space Telescope, Intelsat 401, Westar and Palapa), major operational assets were rescued or repaired soon after launch when otherwise mission-ending anomalies occurred or were detected. In addition to the original rescue, Hubble was upgraded four times, enabling high-demand, world class science over four decades. More recently, two Northrop Grumman Mission Extension Vehicles have captured two Intelsat spacecraft near the end of their life and fuel capacity, to take over maneuvering duties. In spite of these recent operational achievements, and with the exception of large human exploration vehicles and large space telescopes, space architects rarely consider in-orbit servicing and assembly capabilities in their future planning. Technologies such as multi-launch mission architectures (and rendezvous and proximity operations systems), docking systems, external robotics, advanced tools, modular systems and structures, and fluid transfer systems are available today to support these missions. In-space manufacturing will soon be operational to enable resilient missions that recover from on-orbit failures, and expand the utilization of space. We envision a future that includes these capabilities, and discuss the cultural, engineering, and technological challenges to achieving this vision. We discuss the vision, the proverbial chicken and the egg (which came first, the serviceable spacecraft or the servicer?), the cost, risk, and perceptions thereof of in-space operations, a “spectrum” of cooperative servicing design considerations, and the current status of the space industry’s slow but steady march to widespread operational use of on-orbit servicing, assembly, and manufacturing.
Supervised autonomous assembly (SAA) will create a paradigm shift in the planning and design of future persistent assets (PAs), both in near zero-g environments and on planetary surfaces. SAA refers to an autonomy approach that has the benefits of autonomous assembly as well as the benefits provided by a supervisor (operator) who is available to resolve unexpected situations. SAA provides both increased design freedom as well as reduced programmatic risk. SAA enables evolution of future PAs over decades as in-space operations transition from single purpose missions to creation of PAs, such as laboratories and experimental stations which more closely resembling terrestrial laboratories that can easily adapt and evolve to new missions leveraging repeated visits to the PA. The ability to evolve enables PAs to rapidly respond to changing objectives resulting from new questions as our understanding improves. A recently initiated National Aeronautics and Space Administration (NASA) project in the Space Technology Mission Directorate (STMD) Game Changing Development (GCD) Program called the Precision Assembled Space Structure (PASS), leverages the advantages of SAA to develop technologies that enable efficient creation and evolution of hexagonal topologies; both planar (example: fuel depots) and curved (examples: telescopes and shelters). PASS will be used to provide context for the philosophy and concepts discussed as well as the decision and selections made. PASS objectives are: a) Develop confidence in SAA and on-orbit servicing, assembly and manufacturing (OSAM) technologies by executing a test campaign that uses a path-to-flight autonomous precision assembly process directly applicable to future space telescopes. b) Test autonomous technologies including automated path planning and error recovery, to emphasize a robust approach that relies on generic robots and special purpose tools. c) Validate critical component models using a digital twin that includes the assembled primary mirror support structure and assembly process. A digital twin is a high-fidelity simulation of the asset capable of predicting the on-orbit performance. The paper concludes after identifying the critical need for a modest assembly flight experiment to validate and develop confidence in the SAA paradigm, thus accelerating adoption of the benefits described. SAA is a game changing paradigm that enhances the ability of an organization to infuse new technology through rapid evolution of PAs while leveraging OSAM technologies.
On-Orbit Servicing, Assembly, and Manufacturing (OSAM) provide a suite of capabilities to build larger, more resilient spacecraft than current approaches. OSAM Technologies for which NASA Langley retains intellectual property rights will be described to foster possible technology transfer from the government to industry.
On-orbit Servicing, Assembly, and Manufacturing (OSAM) will revolutionize the space industry by transforming the concept of operations of space systems and enabling new, radically different system implementations. These new implementations will benefit from a novel persistent asset design paradigm which focuses on evolvable designs that are tailored to the operational environment, not the launch environment. In addition, the ability to launch sub-systems independently enable future persistent assets to economically expand in capability and size, achieving cost effective and productive operations lasting for decades like terrestrial observatories. With few exceptions (International Space Station, Hubble Space Telescope, Mission Extension Vehicle customers), current space systems are not visited once they are operational. Leveraging emerging low cost commercial launch provides the ability to repeatedly and routinely revisit space systems. Thus, revolutionary new approaches for space system design are possible, creating completely new opportunities for small businesses and accelerating the growth of already established space industries. To usher in the revolutionary new operational paradigm, two things are needed. First, to build confidence in the technology and new paradigm, there must be a leading example, a bellwether persistent asset, that demonstrates the reliability and maturity of the new persistent asset paradigm (where repeated visits are common). Second, in order to rapidly advance and validate OSAM capabilities, an efficient means is required to conduct tests in the space environment. A persistent platform testbed satisfies both these needs. The space environment exhibits a plethora of characteristics that are difficult and costly to accurately simulate for a full system in a terrestrial laboratory, such as near zero gravity, a wide range of ionizing radiation types, atomic oxygen, and micro-meteoroids and space debris traveling at high velocity. In addition, since persistent assets range in mass from a few grams to several metric tons, it is difficult to accurately simulate interactions between these systems and visiting vehicles (that also exhibit a wide range of varying masses and capabilities). These interactions include the transmission of forces and/or exchanging mass (in the form of instruments, fuel, robotic assets, etc.). Thus, a rapid, versatile and cost efficient in-space testing capability that includes a persistent test platform and a surrounding in-space test zone is needed to mature technologies through experimentation. The testbed can provide common services, such as: power, thermal control, vibration isolation, data transmission between experiments and terrestrial experimenters, station-keeping, pointing, and robotic agents that can be leveraged by customer experiments. The onboard robotic agents can be used to provide payload handling services, such as: assembly, change out or upgrade, relocation, connecting/disconnecting utilities, inspection, repair or servicing, etc. Since the persistent platform cost will be amortized over many hosted payloads, its services can eventually be offered at a price much lower than if one were to design a unique and dedicated spacecraft and mission for those few experiments. The key to achieving an effective testbed is providing efficient cost effective access and infrastructure to a variety of commercial, academic and government customers coupled with extensibility, in the capability of an individual persistent platform test bed or replication of the test bed in a different operational regime. Three potential options for implementing a test bed were developed and evaluated in this study.
On-orbit Servicing, Assembly, and Manufacturing (OSAM) will revolutionize the space industry by transforming the concept of operations of space systems and enabling new, radically different system implementations. These new implementations will benefit from a novel persistent asset design paradigm which focuses on evolvable designs that are tailored to the operational environment, not the launch environment. In addition, the ability to launch sub-systems independently enable future persistent assets to economically expand in capability and size, achieving cost effective and productive operations lasting for decades like terrestrial observatories. With few exceptions (International Space Station, Hubble Space Telescope, Mission Extension Vehicle customers), current space systems are not visited once they are operational. Leveraging emerging low cost commercial launch provides the ability to repeatedly and routinely revisit space systems. Thus, revolutionary new approaches for space system design are possible, creating completely new opportunities for small businesses and accelerating the growth of already established space industries. To usher in the revolutionary new operational paradigm, two things are needed. First, to build confidence in the technology and new paradigm, there must be a leading example, a bellwether persistent asset, that demonstrates the reliability and maturity of the new persistent asset paradigm (where repeated visits are common). Second, in order to rapidly advance and validate OSAM capabilities, an efficient means is required to conduct tests in the space environment. A persistent platform testbed satisfies both these needs. The space environment exhibits a plethora of characteristics that are difficult and costly to accurately simulate for a full system in a terrestrial laboratory, such as near zero gravity, a wide range of ionizing radiation types, atomic oxygen, and micro-meteoroids and space debris traveling at high velocity. In addition, since persistent assets range in mass from a few grams to several metric tons, it is difficult to accurately simulate interactions between these systems and visiting vehicles (that also exhibit a wide range of varying masses and capabilities). These interactions include the transmission of forces and/or exchanging mass (in the form of instruments, fuel, robotic assets, etc.). Thus, a rapid, versatile and cost efficient in-space testing capability that includes a persistent test platform and a surrounding in-space test zone is needed to mature technologies through experimentation. The testbed can provide common services, such as: power, thermal control, vibration isolation, data transmission between experiments and terrestrial experimenters, station-keeping, pointing, and robotic agents that can be leveraged by customer experiments. The onboard robotic agents can be used to provide payload handling services, such as: assembly, change out or upgrade, relocation, connecting/disconnecting utilities, inspection, repair or servicing, etc. Since the persistent platform cost will be amortized over many hosted payloads, its services can eventually be offered at a price much lower than if one were to design a unique and dedicated spacecraft and mission for those few experiments. The key to achieving an effective testbed is providing efficient cost effective access and infrastructure to a variety of commercial, academic and government customers coupled with extensibility, in the capability of an individual persistent platform test bed or replication of the test bed in a different operational regime. Three potential options for implementing a test bed were developed and evaluated in this study.
The Lightweight Surface Manipulation System (LSMS) AutoNomy capabilities Development for surface Operations and construction (LANDO) project is an Early Career Initiative (ECI) selected for funding by the Space Technology Mission Directorate (STMD) beginning in fiscal year 2022. Over the two-year project duration, the LANDO project will deliver a general-purpose autonomy framework applicable to serial and tension-actuated manipulation agents, that has been validated using an existing prototype of the LSMS-L35 (35-kg wrist lift capacity on the lunar surface, sized for a Commercial Lunar Payload Services (CLPS) mission). Specific to the LANDO project, the autonomous LSMS-L35 will be used to demonstrate autonomous payload handling capabilities for Lunar and other planetary surfaces, directly addressing STMD capability gaps in autonomous surface construction (ASC) operations, advanced robotics and spacecraft autonomy technologies, and technologies supporting emerging space industries including the On-orbit Servicing, Assembly and Manufacturing (OSAM) National Initiative. In this paper, an overview of the LANDO ECI project is presented.
The Lightweight Surface Manipulation System (LSMS) AutoNomy capabilities Development for surface Operations and construction (LANDO) project is an Early Career Initiative (ECI) selected for funding by the Space Technology Mission Directorate (STMD) beginning in fiscal year 2022. Over the two-year project duration, the LANDO project will deliver a general-purpose autonomy framework applicable to serial and tension-actuated manipulation agents, that has been validated using an existing prototype of the LSMS-L35 (35-kg wrist lift capacity on the lunar surface, sized for a Commercial Lunar Payload Services (CLPS) mission). Specific to the LANDO project, the autonomous LSMS-L35 will be used to demonstrate autonomous payload handling capabilities for Lunar and other planetary surfaces, directly addressing STMD capability gaps in autonomous surface construction (ASC) operations, advanced robotics and spacecraft autonomy technologies, and technologies supporting emerging space industries including the On-orbit Servicing, Assembly and Manufacturing (OSAM) National Initiative. In this paper, an overview of the LANDO ECI project is presented.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Approaches to robotic manufacturing, assembly, and servicing of in-space assets range from autonomous operation to direct teleoperation, with many forms of semi-autonomous teleoperation in between. Because most approaches require one or more human operators at some level, it is important to explore the control and visualization interfaces available to those operators, taking into account the challenges due to significant telemetry time delay. We consider one motivating application of remote teleoperation, which is ground-based control of a robot on-orbit for satellite servicing. This paper presents a model-based architecture that: 1) improves visualization and situation awareness, 2) enables more effective human/robot interaction and control, and 3) detects task failures based on anomalous sensor feedback. We illustrate elements of the architecture by drawing on 10 years of our research in this area. The paper further reports the results of several multi-user experiments to evaluate the model-based architecture, on ground-based test platforms, for satellite servicing tasks subject to round-trip communication latencies of several seconds. The most significant performance gains were obtained by enhancing the operators’ situation awareness via improved visualization and by enabling them to precisely specify intended motion. In contrast, changes to the control interface, including model-mediated control or an immersive 3D environment, often reduced the reported task load but did not significantly improve task performance. Considering the challenges of fully autonomous intervention, we expect that some form of teleoperation will continue to be necessary for robotic in-situ servicing, assembly, and manufacturing tasks for the foreseeable future. We propose that effective teleoperation can be enabled by modeling the remote environment, providing operators with a fused view of the real environment and virtual model, and incorporating interfaces and control strategies that enable interactive planning, precise operation, and prompt detection of errors.
NASA is currently investigating nuclear electric propulsion (NEP) for human Mars transport within the space nuclear propulsion portfolio. NEP spacecraft have the following characteristics, they: 1) include very large structures (~100-meter length); 2) are comprised of many components/modules; and 3) have very long lifetimes (e.g., 50 years for fuel rods). Thus, NEP spacecraft can be classified as a “persistent asset,” which is any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. NEP spacecraft will benefit from taking advantage of, and incorporating, In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities in the spacecraft architecture from the onset, enabling system maintenance, repair, and evolution. ISA has a long history of being proposed for, and studied as, a means for achieving large systems in space. More recently, the benefits of ISA have been recognized by NASA, the Department of Defense (DOD), other government agencies, and commercial space companies, and thus, ISAM is being actively pursued at a national level. Past and current strategies for achieving large structures in space have relied largely on two strategies; the first is to launch monolithic structures (designed to meet launch vehicle requirements for payload size and mass) that are docked or berthed to other monolithic structures on-orbit to form a larger structure (e.g., the International Space Station [ISS]); the second is folding and packaging large structures to fit inside a payload fairing and deploying the full-sized structure (unaided) once on-orbit (e.g., the James Webb Space Telescope [JWST]). To date, conceptual architecture studies performed for NEP spacecraft capable of human-rated Mars transport have only included a combination of the two previously mentioned strategies. This paper will propose ideas for infusing ISAM strategies into NEP vehicle architectures that leverage existing and near future technologies and enable the resulting NEP systems to be realized in a more time- and cost-efficient manner.