Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations Support Center”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

System analysis for the Huntsville Operational Support Center distributed computer system

The Huntsville Operations Support Center (HOSC) is a distributed computer system used to provide real time data acquisition, analysis and display during NASA space missions and to perform simulation and study activities during non-mission times. The primary purpose is to provide a HOSC system simulation model that is used to investigate the effects of various HOSC system configurations. Such a model would be valuable in planning the future growth of HOSC and in ascertaining the effects of data rate variations, update table broadcasting and smart display terminal data requirements on the HOSC HYPERchannel network system. A simulation model was developed in PASCAL and results of the simulation model for various system configuraions were obtained. A tutorial of the model is presented and the results of simulation runs are presented. Some very high data rate situations were simulated to observe the effects of the HYPERchannel switch over from contention to priority mode under high channel loading.

Ingels, F. M.↗

Huntsville Operations Support Center

Information is given in viewgraph form on the Huntsville Operations Support Center (HOSC). The HOSC is a multi-mission control and support facility designed to provide simultaneous support to several diverse missions, using a common set of processing equipment and facilities. Information is given on the missions supported by the HOSC; facility layout; generic system goals; HOSC existing computer architecture; current mission requirements; currently employed hardware and software; front end processing; central processing; peripheral processors; audio and video communications; and upgrading plans.

Bailey, Darrell G.↗

System analysis for the Huntsville Operation Support Center distributed computer system

A simulation model of the NASA Huntsville Operational Support Center (HOSC) was developed. This simulation model emulates the HYPERchannel Local Area Network (LAN) that ties together the various computers of HOSC. The HOSC system is a large installation of mainframe computers such as the Perkin Elmer 3200 series and the Dec VAX series. A series of six simulation exercises of the HOSC model is described using data sets provided by NASA. The analytical analysis of the ETHERNET LAN and the video terminals (VTs) distribution system are presented. An interface analysis of the smart terminal network model which allows the data flow requirements due to VTs on the ETHERNET LAN to be estimated, is presented.

Ingels, F. M.↗

System Analysis for the Huntsville Operation Support Center, Distributed Computer System

HOSC as a distributed computing system, is responsible for data acquisition and analysis during Space Shuttle operations. HOSC also provides computing services for Marshall Space Flight Center's nonmission activities. As mission and nonmission activities change, so do the support functions of HOSC change, demonstrating the need for some method of simulating activity at HOSC in various configurations. The simulation developed in this work primarily models the HYPERchannel network. The model simulates the activity of a steady state network, reporting statistics such as, transmitted bits, collision statistics, frame sequences transmitted, and average message delay. These statistics are used to evaluate such performance indicators as throughout, utilization, and delay. Thus the overall performance of the network is evaluated, as well as predicting possible overload conditions.

Ingels, F. M.↗

System analysis for the Huntsville Operational Support Center distributed computer system

A simulation model was developed and programmed in three languages BASIC, PASCAL, and SLAM. Two of the programs are included in this report, the BASIC and the PASCAL language programs. SLAM is not supported by NASA/MSFC facilities and hence was not included. The statistical comparison of simulations of the same HOSC system configurations are in good agreement and are in agreement with the operational statistics of HOSC that were obtained. Three variations of the most recent HOSC configuration was run and some conclusions drawn as to the system performance under these variations.

Ingels, E. M.↗

Community Coordinated Modeling Center Support of Operations: Real-Time Simulations and V & V.

In support of Operations Community Coordinated Modeling Center (CCMC) performing validation and verification of space weather models. To identify suitable metrics the CCMC focus on parameters most useful to operations that CCMC resident models can provide. The real time simulations carried out at CCMC are an essential tool to test model performance and stability by using input conditions that may occur in nature at any time. Since 2001, the magnetospheric MHD model BATSRUS has been run in real time using ACE real time data. CCMC staff developed an experimental real-time system that controls uploading of the real-time ACE data, monitors continuous model execution, initiates automatic recovery procedure in case of data gaps or hardware failures, synchronizes BATSRUS and FRC runs, and periodically runs IDL based visualization software.

Kuznetsova, M.↗

NASA Support for Commercial Crew Launch Capabilities

Since the earliest days of U.S. human spaceflight, NASA’s Marshall Space Flight Center in Huntsville, Alabama, has played a key role in American crew launch capability, from engineering support for the first Mercury-Redstone launches, to the Saturn launches to the Moon, through Shuttle and now Artemis. Today, Marshall brings that expertise gained through decades of crewed space launches to NASA’s Commercial Crew Program (CCP), providing launch vehicle engineering and programmatic support. The team’s responsibilities have included human certification of commercial launch systems for the CCP missions, including Atlas V and Falcon 9, and verifying each launch vehicle complies with flight certification. MSFC provides expertise in nearly all aspects of launch vehicle design and performance including solid motors and liquid engines, stage propulsion, thrust vector control, structural and dynamics, safety and mission assurance. During each commercial crew launch, an engineering support team is on console at Marshall’s Huntsville Operations Support Center, which has provided launch operations support since Apollo, providing real-time oversight to safety standards for the vehicle and verifying data. Launch vehicle support for Commercial Crew has come as a paradigm shift for the MSFC team, inspiring new approaches that leverage expertise and best practices from past NASA-developed launch vehicle missions, while at the same time providing new synergies from work with commercial partners on CCP. This paper will explore the role that the Marshall launch vehicle services team plays in the Commercial Crew Program, as well as lessons learned from the program that will continue to benefit a new era of spaceflight partnerships.

Commercial Crew↗

Cost Analysis In A Multi-Mission Operations Environment

Spacecraft control centers have evolved from dedicated, single-mission or single missiontype support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multimission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the decreasing flight rate. This paper presents the issues encountered during the HOSC cost analysis process, and the associated lessons learned. These lessons can be used when planning for a new multi-mission operations center or in the transformation from a dedicated control center to multi-center operations, as an aid in defining processes that support future cost analysis and estimation. The lessons can also be used by mature serviceoriented, multi-mission control centers to streamline or refine their cost analysis process.

Newhouse, M.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Advances in High-rate Delay Tolerant Networking On-board the International Space Station

The High-rate Delay Tolerant Networking (HDTN) project at the NASA John H. Glenn Research Center (GRC) is developing a performance optimized Delay Tolerant Networking (DTN) implementation which is able to provide reliable multigigabit per second automated network communications for near-Earth and deep space missions. To that end, this paper provides an overview of the testing and integration efforts culminating in a high-rate DTN demonstration onboard the International Space Station (ISS). Over several years, the HDTN team has performed a series of end-to-end tests between the Software Development and Integration Laboratory (SDIL) at the Lyndon B. Johnson Space Center (JSC) and Marshall Space Flight Center’s Huntsville Operations Support Center (HOSC). The testing has focused on a realistic emulation of the ISS Ku-band RF link, which operates at a maximum of 500 Mbps downlink with a 600 ms round-trip time. In this environment, the HDTN onboard gateway has been tested for interoperability with ISS payload nodes and the DTN ground gateway, store and forward capability, reliable transport using the Licklider Transmission Protocol (LTP), and successful recovery from unexpected loss of signal. In addition to integration testing, HDTN has developed a series of software engineering practices to ensure the stability and maturity of the implementation. As the result, HDTN has successfully demonstrated high-rate DTN services onboard the ISS. This paper concludes with a summary of preliminary flight testing results from the Integrated LCRD LEO User Modem and Amplifier Terminal networking experiments.

Delay tolerant networking↗

Cost Analysis in a Multi-Mission Operations Environment

Spacecraft control centers have evolved from dedicated, single-mission or single mission-type support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multi-mission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the decreasing flight rate. This paper presents the issues encountered during the HOSC cost analysis process, and the associated lessons learned. These lessons can be used when planning for a new multi-mission operations center or in the transformation from a dedicated control center to multi-center operations, as an aid in defining processes that support future cost analysis and estimation. The lessons can also be used by mature service-oriented, multi-mission control centers to streamline or refine their cost analysis process.

Felton, Larry↗

Voice Over Internet Protocol (VoIP) in a Control Center Environment

The technology of transmitting voice over data networks has been available for over 10 years. Mass market VoIP services for consumers to make and receive standard telephone calls over broadband Internet networks have grown in the last 5 years. While operational costs are less with VoIP implementations as opposed to time division multiplexing (TDM) based voice switches, is it still advantageous to convert a mission control center s voice system to this newer technology? Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) has converted its mission voice services to a commercial product that utilizes VoIP technology. Results from this testing, design, and installation have shown unique considerations that must be addressed before user operations. There are many factors to consider for a control center voice design. Technology advantages and disadvantages were investigated as they refer to cost. There were integration concerns which could lead to complex failure scenarios but simpler integration for the mission infrastructure. MSFC HOSC will benefit from this voice conversion with less product replacement cost, less operations cost and a more integrated mission services environment.

Calvelage, Steven↗

Voice Over Internet Protocol (VoIP) in a Control Center Environment

The technology of transmitting voice over data networks has been available for over 10 years. Mass market VoIP services for consumers to make and receive standard telephone calls over broadband Internet networks have grown in the last 5 years. While operational costs are less with VoIP implementations as opposed to time division multiplexing (TDM) based voice switches, is it still advantageous to convert a mission control center s voice system to this newer technology? Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) has converted its mission voice services to a commercial product that utilizes VoIP technology. Results from this testing, design, and installation have shown unique considerations that must be addressed before user operations. There are many factors to consider for a control center voice design. Technology advantages and disadvantages were investigated as they refer to cost. There were integration concerns which could lead to complex failure scenarios but simpler integration for the mission infrastructure. MSFC HOSC will benefit from this voice conversion with less product replacement cost, less operations cost and a more integrated mission services environment.

Pirani, Joseph↗

Marshall Space Flight Center Ground Systems Development and Integration

Ground Systems Development and Integration performs a variety of tasks in support of the Mission Operations Laboratory (MOL) and other Center and Agency projects. These tasks include various systems engineering processes such as performing system requirements development, system architecture design, integration, verification and validation, software development, and sustaining engineering of mission operations systems that has evolved the Huntsville Operations Support Center (HOSC) into a leader in remote operations for current and future NASA space projects. The group is also responsible for developing and managing telemetry and command configuration and calibration databases. Personnel are responsible for maintaining and enhancing their disciplinary skills in the areas of project management, software engineering, software development, software process improvement, telecommunications, networking, and systems management. Domain expertise in the ground systems area is also maintained and includes detailed proficiency in the areas of real-time telemetry systems, command systems, voice, video, data networks, and mission planning systems.

Wade, Gina↗

Telescience Resource Kit (TReK)

Telescience Resource Kit (TReK) is one of the Huntsville Operations Support Center (HOSC) remote operations solutions. It can be used to monitor and control International Space Station (ISS) payloads from anywhere in the world. It is comprised of a suite of software applications and libraries that provide generic data system capabilities and access to HOSC services. The TReK Software has been operational since 2000. A new cross-platform version of TReK is under development. The new software is being released in phases during the 2014-2016 timeframe. The TReK Release 3.x series of software is the original TReK software that has been operational since 2000. This software runs on Windows. It contains capabilities to support traditional telemetry and commanding using CCSDS (Consultative Committee for Space Data Systems) packets. The TReK Release 4.x series of software is the new cross platform software. It runs on Windows and Linux. The new TReK software will support communication using standard IP protocols and traditional telemetry and commanding. All the software listed above is compatible and can be installed and run together on Windows. The new TReK software contains a suite of software that can be used by payload developers on the ground and onboard (TReK Toolkit). TReK Toolkit is a suite of lightweight libraries and utility applications for use onboard and on the ground. TReK Desktop is the full suite of TReK software -most useful on the ground. When TReK Desktop is released, the TReK installation program will provide the option to choose just the TReK Toolkit portion of the software or the full TReK Desktop suite. The ISS program is providing the TReK Toolkit software as a generic flight software capability offered as a standard service to payloads. TReK Software Verification was conducted during the April/May 2015 timeframe. Payload teams using the TReK software onboard can reference the TReK software verification. TReK will be demonstrated on-orbit running on an ISS provided T61p laptop. Target Timeframe: September 2015 -2016. The on-orbit demonstration will collect benchmark metrics, and will be used in the future to provide live demonstrations during ISS Payload Conferences. Benchmark metrics and demonstrations will address the protocols described in SSP 52050-0047 Ku Forward section 3.3.7. (Associated term: CCSDS File Delivery Protocol (CFDP)).

Lippincott, Jeff↗

Space Mission Operations Ground Systems Integration Customer Service

The facility, which is now the Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center in Huntsville, AL, has provided continuous space mission and related services for the space industry since 1961, from Mercury Redstone through the International Space Station (ISS). Throughout the long history of the facility and mission support teams, the HOSC has developed a stellar customer support and service process. In this era, of cost cutting, and providing more capability and results with fewer resources, space missions are looking for the most efficient way to accomplish their objectives. One of the first services provided by the facility was fax transmission of documents to, then, Cape Canaveral in Florida. The headline in the Marshall Star, the newspaper for the newly formed Marshall Space Flight Center, read "Exact copies of Documents sent to Cape in 4 minutes." The customer was Dr. Wernher von Braun. Currently at the HOSC we are supporting, or have recently supported, missions ranging from simple ISS payloads requiring little more than "bentpipe" telemetry access, to a low cost free-flyer Fast, Affordable, Science and Technology Satellite (FASTSAT), to a full service ISS payload Alpha Magnetic Spectrometer 2 (AMS2) supporting 24/7 operations at three operations centers around the world with an investment of over 2 billion dollars. The HOSC has more need and desire than ever to provide fast and efficient customer service to support these missions. Here we will outline how our customer-centric service approach reduces the cost of providing services, makes it faster and easier than ever for new customers to get started with HOSC services, and show what the future holds for our space mission operations customers. We will discuss our philosophy concerning our responsibility and accessibility to a mission customer as well as how we deal with the following issues: initial contact with a customer, reducing customer cost, changing regulations and security, and cultural differences, to ensure an efficient response to customer issues using a small Customer Service Team (CST) and adaptability, constant communication with customers, technical expertise and knowledge of services, and dedication to customer service. The HOSC Customer Support Team has implemented a variety of processes, and procedures that help to mitigate the potential problems that arise when integrating ground system services for a variety of complex missions and the lessons learned from this experience will lead the future of customer service in the space operations industry.

Roth, Karl↗