Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operator Support System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

AI-Guided Reasoning-Based Operator Support System for the Nuclear Power Plant Management

The Decision-making process in the Nuclear Power Plant (NPP) control room faces some challenges: operator incomplete knowledge, insufficient time for responding to the highly dynamic events, and a large number of indicators to monitor. Because of the complexity of the NPP system, it is hard to pre-plan all the failures/mitigative actions. An intelligent operator support system is vital to mitigate these shortcomings. In this paper, an AI declarative approach (Answer Set Programming (ASP)) is employed to represent our knowledge of the nuclear power plant in the form of logic rules. This represented knowledge is structured to form a reasoning-based operator support system. When an incident occurs, this ASP-based reasoning support system is demonstrated to be capable of fault identification (diagnosis), informing the operator of different scenarios and consequences, and generating the control options (decision making).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Application of Artificial Intelligence in Detection and Mitigation of Human Factor Errors in Nuclear Power Plants: A Review

Human factors and ergonomics have played an essential role in increasing the safety and performance of operators in the nuclear energy industry. In this critical review, we examine how artificial intelligence (AI) technologies can be leveraged to mitigate human errors, thereby improving the safety and performance of operators in nuclear power plants (NPPs). First, we discuss the various causes of human errors in NPPs. Next, we examine the ways in which AI has been introduced to and incorporated into different types of operator support systems to mitigate these human errors. We specifically examine (1) operator support systems, including decision support systems, (2) sensor fault detection systems, (3) operation validation systems, (4) operator monitoring systems, (5) autonomous control systems, (6) predictive maintenance systems, (7) automated text analysis systems, and (8) safety assessment systems. Finally, we provide some of the shortcomings of the existing AI technologies and discuss the challenges still ahead for their further adoption and implementation to provide future research directions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

ReNew100: Reliable Power System Operation with 100% Renewable Generation

The ReNew100 project has developed and demonstrated an operator support system (OSS) to operate power systems with 100% renewable power generation from inverter-based resources (IBRs) like wind and solar that significantly reduces the risk of widespread power outages in a simulated operational environment at Technology Readiness Level (TRL) 6. The OSS achieves resilient operation for power systems under changing operation modes including varying combinations of conventional and renewable generation, including cases with 100% renewable generation from wind and solar IBRs. The OSS continuously monitors the N-1 security of the power system, which refers to the ability of the power systems to survive single outages of power system elements, like the loss of a generator or a power line, without causing widespread power outages beyond those expected and planned for. If the OSS identifies that the system is not N-1 secure, an automatic Controller Parameter Optimization (CoPO) developed within Renew100 is activated to optimize the N-1 security of the system by tuning controller parameters within different assets like batteries, wind, and solar plants. The core innovation of ReNew100 is the development of this CoPO as well as the demonstration of the OSS for a real-time simulation of the Hawai'i Island power system. Moreover, Renew100 has developed new model calibration techniques for dynamic power system models and demonstrated them for Hawai'i Island.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Reactor Control and Operations (ARCO): A University Research Facility for Developing Optimized Digital Control Rooms

The Advanced Reactor Control and Operations (ARCO) facility was constructed in January 2018 to serve as a test bed for advanced reactor control rooms and operator support systems. Since then, it has supported human-machine interface user experience research, fault detection and mitigation technology development, control room concept of operations development, and remote operations research. ARCO serves as the control room for the Compact Integral Effects Test (CIET) facility, which replicates the primary-side flow paths and thermal-hydraulic behavior of a fluoride-salt-cooled high-temperature reactor (FHR) using simulant fluids and scaling principles. New reactor designs feature different operating conditions and scenarios than those in existing reactors. ARCO supports the research and development of digital tools for operator communications, intuitive real-time data analysis, online health monitoring and prognostics, and control room cybersecurity. By integrating these different technologies, ARCO acts as a prototypical control system to iteratively develop methods and tools of operation in advanced small modular nuclear reactors. This paper describes the features of and challenges to operating advanced small modular reactors underlying the design basis for ARCO and its operator support systems.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Electrification Futures Study: Operational Analysis of U.S. Power Systems with Increased Electrification and Demand-Side Flexibility

This report provides a high-resolution U.S. national-scale power systems assessment of scenarios with widespread electrification using detailed grid simulations. We find that high electrification scenarios envisioned in the Electrification Futures Study can be operated at the hourly level to meet future increased levels of electrified demand and, under the most aggressive cases, with up to 66% of generation from wind and solar technologies. The analysis also examines the value of flexibility from demand by supporting system operability under high electrification and high renewable systems. Demand-side flexibility—especially flexibility from newly electrified loads—is found to enhance the operational efficiency by reducing VRE curtailment and increasing utilization of generators with lower operating costs. It can also enhance the ability of electrification to decarbonize the energy sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FAST-1.0.1 User Installation and Verification Guide

The purpose of this document is to provide the user information about the installation of FAST-1.0.1 on their computers or servers. General information about the code and supported operating systems is described in Section 1.0.1. Self-service oriented FAST-1.0.1 software licensing steps are described in Section 2.0. An installation verification test suite is provided with FAST-1.0.1 and described in Section 3.0. A convenience script for converting FRAPCON to FAST inputs is discussed in Section 4.0. FAST-1.0.1 was developed and released under a software quality assurance program based upon NQA-1-2017. FAST-1.0.1 is the latest baseline code and the result of a bug fixes to FAST-1.0 with other software and methodology developments. The installation verification test suite contains both steady state and transient Anticipated Operation Occurrences (AOOs). Capability to model accident conditions, such as Reactivity Initiated Accidents (RIAs) and Loss Of Coolant Accidents (LOCAs), are targeted for a later release of FAST. FRAPTRAN-2.0 will continue to be used for accident conditions until the release of FAST with accident condition modeling capabilities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FAST-1.2 User Installation and Verification Guide: Developed Under NQA-1-2017

The purpose of this document is to provide the user information about the installation of Fuel Analysis for Steady state and Transient (FAST)-1.2 on their computers or servers. General information about the code and supported operating systems is described in Section 1.0. Self-service oriented FAST-1.2 software licensing steps are described in Section 2.0. An installation verification test suite is provided with FAST-1.2 and described in Section 3.0. A convenience script for converting Fuel Rod Analysis Program – Constant (FRAPCON) to FAST inputs is discussed in Section 4.0. FAST-1.2 was developed and released under a software quality assurance program based upon NQA-1-2017 at Pacific Northwest National Laboratory (PNNL). FAST-1.2 is the latest baseline code. The installation verification test suite contains both steady state and transient Anticipated Operation Occurrences (AOOs), accident conditions, such as Reactivity Initiated Accidents (RIAs) and Loss of Coolant Accidents (LOCAs).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Prospective Design Method for Nuclear Power: The Evaluation, Requirements, and Goals Outline for Nuclear (ERGON) Method

Human factors researchers at Idaho National Laboratory (INL) have worked on projects spanning control room modernization, operator support systems, visualization design, and novel system creation. These projects demonstrated the need for an explicit design method for nuclear power. Human factors teams found a high standard in the Human Factors Engineering Program Review Model (NUREG-0711) and needed a design methodology which could be successful in gaining approval. Previous work has been synthesized as the Evaluation, Requirements, and Goals Outline for Nuclear (ERGON) method here. Design tasks are broken into four phases: Context and Orientation, Human Factors Review, Prototyping and Evaluation, Iteration and Improvement. ERGON is intended as a flexible and direct design method for many applications in nuclear power. ERGON has been vetted through collaborative research and development with nuclear utilities and as such, the ERGON method can assist utilities to achieve approval from a NUREG-0711 summative evaluation for HSI implementations.

42 ENGINEERING↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Method for Assessment of Security-Relevant Settings in Anomaly-Based Intrusion Detection for Industrial Control Systems

Ensuring the integrity of Ethernet-based networks is a challenging and constantly evolving domain. This problem is exacerbated for those operational technology (OT) networks supporting industrial control systems (ICS) since much of that equipment was originally designed to be on a network that was isolated and generally considered free of malefactors. Increasing pressure to bridge these systems with traditional information technology (IT) networks has introduced a bevy of new threats. In response, both academia and industry have responded with security solutions tailored to ICS environments. Deploying these protection systems often involves several configuration choices. While some of these choices are clear (e.g., block/enable protocol X) others are far more subjective (e.g. alert threshold == 3.43). Further complicating the situation, while often similar to IT networks, OT networks have unique challenges and characteristics that make the task of protecting them simultaneously more difficult and straight forward.Extant solutions for quantifying the relative security of intrusion detection systems fail to effectively support the operators of said systems with understanding the impact of various configuration changes. Further, they assume that the attacks are static and not subject to manipulation or alteration in the face of defenses. In this paper, we present a threat-based method for quantifying the relative impact of various security settings for intrusion detection systems (IDSs) within ICS environments. This method provides operational staff with a clear understanding of the relative impact of their settings and assumes that the attacks levied against them are dynamic. The model is described in detail, we apply the model to a synthetic data set, and discuss the inferences that can be made and what types of decisions they could be used to support.

Gillen, Rob↗

A Unified Wireless Charger, On-Board Charger, and Auxiliary Power Module for Electric Vehicle Charging Systems

This paper proposes a unified electric vehicle (EV) charging architecture that integrates wireless power transfer (WPT), an on-board charger (OBC), and an auxiliary power module (APM) within a single architecture. By sharing a multi-functional magnetic structure and active switch bridges, the proposed topology eliminates additional transformers and converter stages, reducing hardware complexity and improving power density. A multipurpose magnetic design achieves magnetic decoupling among the WPT, OBC, and APM functions while maintaining the required coupling for each mode. Through electrical reconfiguration, the WPT operates as an LCC-S converter, whereas the OBC and APM operate as dual-active-bridge (DAB) converters. The system supports multiple operating modes, including simultaneous high-voltage and lowvoltage battery charging. Finite-element and circuit simulations verify the magnetic characteristics and system operation, demonstrating the feasibility of the proposed unified architecture for EV charging applications.

Jo, Cheolhui [ORNL] (ORCID:0000000322692434)↗

Testing of Crystalline Silicotitanate to Support Tank-Side Cesium Removal System Operations - 20458

The direct feed of waste from the Hanford tank farms to the Low-Activity Waste Facility at the Hanford Waste Treatment and Immobilization Plant requires an intermediate treatment step that prepares the waste for vitrification. Washington River Protection Solutions (WRPS) selected a near-tank treatment system known as the Tank-Side Cesium Removal (TSCR) system to perform the required intermediate treatment functions. The approach in the TSCR system is to filter waste supernatant with a sintered metal dead-end filter and then use a series of ion exchange columns to remove cesium; this system has several similarities to the Tank Closure Cesium Removal system that has been deployed on the Savannah River Site. The ion exchange media proposed for use is crystalline silicotitanate (CST), which is a non-elutable media with a high affinity for cesium. Because the media is non-elutable, loaded columns will be blown down with compressed air, moved into interim storage, and replaced with new columns when cesium capacity is reached. The assumed extent and rate of drying that could be achieved in the TSCR column geometry lacked confirmation by experimental data. In addition, once the columns are loaded with cesium, they generate flammable gases (primarily hydrogen) via radiolysis acting on any resident liquids, i.e., moisture, remaining in the media bed. An assessment of available information on CST concluded that gas generation data that bounds expected operational conditions were needed to support the TSCR system safety basis and planned operations. Working with WRPS, Pacific Northwest National Laboratory (PNNL) designed and conducted testing with CST media to address the need for (a) representative in-column drying data, and (b) bounding flammable gas generation data. Drying testing was performed using a full-height column with a diameter of approximately 2 inches with injected air at temperatures of 18 deg. C and 30 deg. C. Gas generation testing was conducted in an engineered bunker that allowed simultaneous irradiation of up to eight samples at a time. These two experimental approaches used at PNNL for the CST testing are summarized and the major outcomes are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dynamic Human-in-the-Loop Simulated Nuclear Power Plant Thermal Dispatch System Demonstration and Evaluation Study

An Idaho National Laboratory research team performed a human-in-the-loop study with two formerly licensed retired operators to evaluate thermal power dispatch operations supported by the modified GSE Systems GPWR plant simulator. Virtual representations of the analog control panels were presented on touch-screen bays configured to mimic the control room layout in the newly renovated Human Systems Simulation Laboratory. The operators performed 15 scenarios covering normal evolutions to transition the plant from full turbine operation to joint turbine and thermal power dispatch operations in addition to transient response scenarios induced with simulated faults to evaluate the impact of thermal power dispatch system on operator and plant responses. A prototype human-system interface (HSI) was developed and displayed in tandem with the virtual analog panels to support the operators executing the procedurally drive evolutions and transient responses. An interdisciplinary team of operations experts, nuclear engineers, and human factors experts observed the operators performing the scenarios to evaluate the operations. Only a preliminary analysis of the results has been performed. The full analysis will be shared in a milestone report scheduled for release at the end of September; however, some high-level conclusions were readily available. Two high level findings for the system design were captured in the study. The manual control supported by the HSI to transition from standard operations to thermal power dispatch operation imposed a considerable amount of workload on the operators due to tedious manual valve manipulations and system monitoring required to verify their intended effect. An additional operator would be required in the control room to support the daily evolution. Automatic control for the transition was deemed a requirement for plant adoption without imposing additional staffing costs. The second finding was the necessity for an automatic thermal power dispatch system trip isolation function linked to a turbine and reactor trip signal. The operators completed scenarios with automatic isolation functionality and manually required actuation of the thermal power dispatch system. The operator response was sufficiently slower in the manual trip condition, such that operators were unable to manually actuate key post trip safety functions an indicate a degraded control capability that should be avoided. With an automatic trip signal little to no impact of the thermal power dispatch system was identified on the primary plant response and therefore the system could be readily and safely adopted. Together these two findings represent the need to support the adoption of thermal power dispatch capability into existing operations by leveraging automation to augment any additional operator tasking required to control and monitor an additional system beyond existing operations.

99 GENERAL AND MISCELLANEOUS↗

Laboratory Evaluation of Federated, Hierarchical Controls for Distribution Power System Management: Preprint

The connection of more loads and distributed energy resources (DERs) to the distribution power system brings both challenges and opportunities to system operators. There are opportunities to aggregate flexible loads and DERs to provide transmission grid services, but the coordinated actions of DERs being managed by independent, third-party DER aggregators to support transmission system operations can present challenges. We developed a federated DER management architecture and control framework that aims to manage heterogeneous DERs to deliver reliable transmission grid services while respecting distribution system constraints. The controls include stochastic day-ahead optimization, model predictive control, and a simple real-time management scheme. We present simulation results obtained from a realistic laboratory test bed of federated controls managing DERs within a substation service area to make the substation net power follow the optimal net power determined by the day-ahead optimization based on cost and limiting reverse power flow.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fitness For Service Assessment of a Corroded Heat Exchanger

Within the Fermi National Accelerator complex, there exist various water systems that support accelerator operations. One of these systems is extremely vital to the operation of the machine; that is the cooling system. The cooling system consists of nine relatively large heat exchangers that take untreated pond water and use it to cool the process fluid that further cools machine components. Over the 30 years these heat exchangers have been in operation, they have undergone significant material loss on the channels. This material loss, due to various forms of corrosion such as galvanic and microbiologically influenced corrosion (MIC) and possibly others, has deteriorated more than 80% of the nominal wall thickness of some of the exchangers and placed them in a questionable state. ASME FFS-1 (API 579) has been applied to address the condition of the heat exchangers due to their noncompliance with the governing code, BPVC Sec. VIII Div. 1. The assessments encompassed ASME FFS-1 parts 4: General Metal Loss and 9: Crack Like Flaw using level 1, 2, and 3 analysis techniques based on inspection data obtained by API 510 inspections. Level 1 and 2 assessments were deemed unfit for the corroded regions due to their location relative to a major structural discontinuity (channel to tube-sheet joint), so a level 3 analysis was conducted according to ASME Sec. VIII Div. 2 (design by analysis) rules for pressure vessels. Supplemental information included pond water tests to determine an accurate future corrosion allowance due to lacking inspection history. A leak before break (LBB) route was chosen to evaluate the possibility of leaking prior to the onset of failure. The analysis of one heat exchanger shows that the possibility the channel will develop a pinhole leak over 2.5 more years of operation should not be overlooked, but burst was unlikely from operation. The use of fracture mechanics show, that if a through-wall crack were to develop, it would not propagate further than the channel geometry and cause a leak not greater than 35 GPM. Using ASME Section XI Code Case N-705-1, allowing us to operate with a leak until the next outage given certain operating conditions and developing a leak mitigation procedure, this heat exchanger is deemed fit-for-service.

Humenik, Alex [Fermilab]↗

Adaptive Control for Residential HVAC Systems to Support Grid Services

In this paper, we propose an adaptive control strategy for residential buildings' heating ventilation and air conditioning (HVAC) systems to support grid services. The proposed control strategy captures the time-varying characteristics of the building and weather environments. It assigns to each building a local controller to maintain the indoor temperature within a desired comfort level, while the load aggregator allocates the assigned reference power provided by the distribution system operator to support a specific grid service, such as demand peak reduction, balancing supply and demand, and consuming the solar photovoltaic (PV) power locally. Simulation results are presented to verify the performance of the proposed control strategy in terms of maintaining the indoor temperatures of several buildings within the desired comfort bands while tracking the reference power profile. Also, a comparison with a recently developed model-free control strategy is presented.

Wu, Tumin↗