Search NASASearch

SEARCH · Search NASA

Results for “Orbital Transfer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Computation of Optimal Interplanetary Low-Thrust Trajectories With Bounded Thrust Magnitude By Means of the Generalized Newton-Raphson Method

The generalized Newton-Raphson method, an iterative procedure for solving nonlinear operator equations, has been extended in application to variational problems with bounded control variables. A minimum fuel interplanetary low thrust orbital transfer problem is worked out in detail to demonstrate the practical aspects of the algorithm as well as its computational effectiveness. The control variables are the thrust magnitude, limited from zero to some prescribed maximum value, and the thrust steering angle.

Computation

Cryogenic Spray Quenching of A Simulated Propellant Storage Tank Wall With Heat Transfer Enhancement By A Thin-Film Coating and Flow Pulsing in Microgravity

Human space exploration to the Moon, Mars, and possibly asteroids is NASA’s biggest challenge for the new millennium. One of the critical elements to this mission is the effective, sufficient, and reliable supply of cryogenic propellant fluids. Future lower-earth-orbiting (LEO) propellant fuel depots and human-carrying orbital transfer spacecraft flying to the moon and Mars will have to utilize the high thrust and high efficiency of liquid cryogenic chemical propulsion or nuclear thermal propulsion. Efficient in-space tank-to-tank propellant transfer (propellant fuel depot to orbital transfer spacecraft) of cryogenic propellants is an enabling technology for the planned Crewed Mars Surface Mission. The transfer of cryogenic propellants in space, however, has yet to be accomplished, solely due to the unavailability of cryogenic quenching heat transfer data during chilldown (quenching) and filling of the propellant receiver tank in reduced gravity and microgravity as liquid propellant cannot be stored in a required liquid state until the tank is quenched down to the liquid temperature. Therefore, highly energy efficient thermal-fluid management breakthrough concepts to conserve and minimize the cryogen consumption during propellant transfer have become the focus of research and engineering development, especially for the deep-space mission to Mars. In this paper, we introduce such concepts and demonstrate their feasibility for cryogenic storage tank chilldown in parabolic flights under a simulated space microgravity condition. In order to maximize the storage tank chilldown efficiency for the least amount of cryogen consumption, the technology adopted included cryogenic spray cooling, Teflon thin-film coating of the simulated tank surface, and spray flow pulsing. The completed flight experiments successfully demonstrated that spray cooling is the most efficient cooling method for the tank chilldown in microgravity. In microgravity, Teflon coating alone can improve the efficiency up to 72% and the efficiency can be improved up to 59% by flow pulsing alone. However, Teflon coating together with flow pulsing was found to substantially enhance the chilldown efficiency in microgravity for up to 113%.

spray

Moon Base Transportation - Deliveries to the Lunar Surface

Development of the Moon Base will enable a home away from home for astronauts who will live and work at humanity’s first lunar outpost. In this effort, NASA’s Moon Transportation Office is responsible for enabling the transformational missions required to deliver habitats, supplies, science payloads, and all other elements needed to cultivate a permanent presence on the Lunar Surface. The Mission Concept (MC) is characterized through evaluation of an end-to-end architecture that can successfully deliver a generalized heavy large-volume payload, in excess of 4000 kg, to a precision landing and touchdown on the lunar surface. The mission architecture utilizes a single launch configuration of a Lunar Lander (LL) with a unique propellant system. The LL has an integral orbital transfer capability and features jettisonable elements. The design circumvents the need for prop transfer on orbit and multiple launch configurations. The launch vehicle (LV) for this work will assume the capability to deliver a payload in excess of 40,000 kg to orbit, affording multiple LV solutions. Considerations for the LL and payload deployment from the fairing are assumed to be handled through compliance with a launch providers’ Interface Requirements Document (IRD). The MC will span from launch at Kennedy Space Center (KSC) to terminal descent and touchdown on the lunar surface, requiring a total ΔV on the order of 6 km/s beyond what is required to get the vehicle stack to a 200 km circular Low Earth Orbit (LEO). Major mission phases include: launch and launch vehicle separation, transfer operations, pre-landing navigation, and lunar descent and touchdown. A Concept of Operations (ConOps) is used as the primary design driver for defining architecture of the vehicles necessary to achieve final payload delivery. Numerous ground rules and assumptions will be provided for each phase of the mission. Concept designs for the LL is presented. An emphasis of the design maximizes a feasible path for maturation, manufacturing, and operation. A self-imposed practical consideration for this effort is the incorporation of legacy designed hardware to minimize expensive, time-intensive, and high-risk hardware development cycles. The propulsion system of the LL adopts a conventional storable bipropellant configuration of monomethyl hydrazine (MMH) and mixed oxides of nitrogen (MON3). This effort will showcase a unique propellant delivery system to minimize the reliance on propellant management devices (PMDs) during descent. Numerous key constraints have been considered, across the multiple segments of the mission. These include the unique aspects of center of gravity (CG) management, thruster plume effects including self-impingement, propulsion system hardware limitations, navigation during multiple mission phases, and landing gear geometry for uneven terrain. These constraints shape the trades necessary for precision landing of heavy cargo and ensure compatibility with broader Moon Base Transportation concepts. The resulting insights inform future transportation strategies for the Moon and beyond; directly contributing to the development of cargo‑delivery standards that will support the long‑term buildup of a sustainable, continuously inhabited Moon Base.

Lunar Habitat

Automated Resupply of Consumables: Enhancement of Space Commercialization Opportunities

This paper addresses work performed at Rockwell International's Space Systems Division to investigate the feasibility of, and develop concepts for, automated and/or robotic resupply of consumables on orbit. The work focuses on the resupply of satellites and is described in five sections. First, the various problems relating the resupply on orbit are discussed: for example, economic concerns, fuel handling problems, and safety issues. Next major methods of effecting fuel transfer on orbit are summarized, together with their advantages and disadvantages. Direct fuel exchange is emphasized as the most feasible technique. Third, guidelines are developed for automated/robotic refueling mechanisms to accomplish on-orbit consumable resupply. For example, the guidelines cover safety, reliability, maintainability, alignment, induced loads, thermal protection, leaks, extravehicular activity (EVA) interface, and so on. The fourth part of the paper covers the development of design concepts for satellite resupply robotic interfaces that comply with the guidelines. Concepts include servicer fluid transfer system and satellite propulsion system, and a combined docking/umbilical device. Last, future technical development in these areas are discussed.

Davoud Manouchehri

Uranus Orbiter and Probe: Mission Challenges and Concept Updates Since the Origins, Worlds, and Life Decadal Survey

Origins, Worlds, and Life: Planetary Science and Astrobiology in the Next Decade identified a Uranus Orbiter and Probe as the highest-priority strategic mission for the decade 2023–2032, as it enables broad cross-disciplinary science in the largely unexplored Uranian system. The mission architecture evaluated by the Decadal Survey was a singular proof of concept demonstrating that a moderately instrumented mission could deliver Decadal-priority science with a reduced cost and risk posture by leveraging existing technologies to the maximum extent possible. With revised assumptions since the Decadal, we have explored a large trade space including launch vehicles, propulsion options, cruise trajectories, available power sources, viable concept of operations, and science data return for later launch dates without a Jupiter gravity assist. The most repeatable trajectory solutions employ either a commercially derived solar electric propulsion (SEP) transfer stage or the availability of a more capable launch vehicle under development, such as the SpaceX Starship. Orbit insertion has been moved farther from Uranus to acknowledge the remaining uncertainty in Uranian ring structure. A streamlined, SEP-adaptable, orbiter design was developed using two Next Gen Radioisotope Thermoelectric Generators, and the probe design was matured, reducing the entry gravitational acceleration, and assuming the largest Decadal-recommended payload to provide margin for future instrument selections. With this updated design, we also constructed a detailed concept of operations for three representative science cases, returning 13–15 Gbit of science data and spacecraft telemetry per ∼34 day orbit.

Amy A Simon

Thermal Design and Thermal Vacuum Testing of the StarBurst Instrument

The StarBurst Multimessenger Pioneer is a small satellite mission serving as a wide-field gamma-ray observatory designed to capture the initial emissions of short gamma-ray bursts, electromagnetic signatures of neutron star mergers. This paper presents the final thermal design and analysis of the StarBurst Instrument, comprising the bus-to-instrument interface plate, control electronics, and twelve crystal detector units, which form the core of the mission’s science capability. The passive thermal control system design requires consideration of restrictive keep-out zones, unknown orbital parameters, and narrow temperature limits of the detectors. Also summarized is the instrument level thermal vacuum cycle test, correlated model refinements, and updated model results. Following successful completion of the instrument test campaign, the hardware was integrated with the spacecraft bus for spacecraft level testing, including additional thermal vacuum testing. The results from the spacecraft level thermal vacuum test will further inform the instrument thermal model, ensuring accurate flight temperature predictions. StarBurst launches as a secondary payload in 2027 and has a mission duration of at least one year.

StarBurst

Overview of the Center for Advanced Space Propulsion

The mission of the Center for Advanced Space Propulsion (CASP), a Center for the Commercial Development of Space (CCDS), is to strengthen U.S. competitiveness in space technology, foster cooperative research with industry and government, assist industry in developing commercial products and services, and perform research in advanced space propulsion. Current areas of focus are (1) advanced chemical propulsion, including high area ratio nozzle performance, variable thrust engine performance, and spray combustion stability; (2) artificial intelligence propulsion applications, including health monitoring of rocket engines, fault pattern detection and diagnosis, and intelligent hypertext applications; (3) microgravity fluid management, including liquid storage and transfer, a subscale orbital fluid transfer experiment, and helical, two-phase flow; (4) electric propulsion, including magnetic annular arc thruster, ion thrustor, and electrostatic plasma accelerator; and (5) laser materials processing.

George W Garrison

Spacecraft Water Impurity Monitor, a System for Water Quality Analysis on Exploration Missions Beyond Low Earth Orbit

Exploration missions beyond low-earth-orbit (LEO) will require advanced instrumentation to monitor water quality. Traveling beyond LEO means the transfer of water samples to an Earth-based laboratory for detailed analysis is not feasible. Detailed analysis of water composition during exploration is still necessary, because having the capability to determine the specific organic chemical causing a change in total organic carbon (TOC) or the specific metal or ionic species causing a change in conductivity has the potential to inform the crew health and system management decisions. On a new vehicle such as a lunar or Mars surface habitat or a Mars transit vehicle, finding “new” impurities not seen on ISS should be expected. The key is to identify the impurity so the correct action can be taken. On ISS we can measure TOC, conductivity, and other physical properties but do not have the capability for detailed analysis using vehicle instrumentation. This is acceptable because ISS can send samples down to Earth for further analysis and obtain the detailed composition. The Spacecraft Water Impurity Monitor (SWIM) will provide detailed water quality analysis for missions in which sample down mass is not available. SWIM is a system comprising organic and inorganic analysis modules. For organic chemicals, a gas chromatograph mass spectrometer (GCMS) detects and identifies organic impurities. For inorganic species, a capillary electrophoresis capacitively coupled contactless conductivity detection (CE-C4D) system as well as ion specific electrodes detect and identify metal ions and other inorganic salts / acids. The SWIM technology demonstration project has completed a System Requirements Review (SRR) to finalize detection requirements and is currently working to refine vehicle interface requirements for a future technology demonstration. The project also has begun preliminary flight design activities for the core analyzers in the instrument suite.

Water Monitoring

Spacecraft Water Impurity Monitor, a System for Water Quality Analysis on Exploration Missions Beyond Low Earth Orbit

Exploration missions beyond low-earth-orbit (LEO) will require advanced instrumentation to monitor water quality. Traveling beyond LEO means the transfer of water samples to an Earth-based laboratory for detailed analysis is not feasible. Detailed analysis of water composition during exploration is still necessary, because having the capability to determine the specific organic chemical causing a change in total organic carbon (TOC) or the specific metal or ionic species causing a change in conductivity has the potential to inform the crew health and system management decisions. On a new vehicle such as a lunar or Mars surface habitat or a Mars transit vehicle, finding “new” impurities not seen on ISS should be expected. The key is to identify the impurity so the correct action can be taken. On ISS we can measure TOC, conductivity, and other physical properties but do not have the capability for detailed analysis using vehicle instrumentation. This is acceptable because ISS can send samples down to Earth for further analysis and obtain the detailed composition. The Spacecraft Water Impurity Monitor (SWIM) will provide detailed water quality analysis for missions in which sample down mass is not available. SWIM is a system comprising organic and inorganic analysis modules. For organic chemicals, a gas chromatograph mass spectrometer (GCMS) detects and identifies organic impurities. For inorganic species, a capillary electrophoresis capacitively coupled contactless conductivity detection (CE-C4D) system as well as ion specific electrodes detect and identify metal ions and other inorganic salts / acids. The SWIM technology demonstration project has completed a System Requirements Review (SRR) to finalize detection requirements and is currently working to refine vehicle interface requirements for a future technology demonstration. The project also has begun preliminary flight design activities for the core analyzers in the instrument suite.

Water Monitoring

Global Precipitation Measurement (GPM) Spacecraft Lithium Ion Battery Micro-Cycling Investigation

The Global Precipitation Measurement (GPM) spacecraft was jointly developed by NASA and JAXA. It is a Low Earth Orbit (LEO) spacecraft launched on February 27, 2014. The power system is a Direct Energy Transfer (DET) system designed to support 1950 watts orbit average power. The batteries use SONY 18650HC cells and consist of three 8s by 84p batteries operated in parallel as a single battery. During instrument integration with the spacecraft, large current transients were observed in the battery. Investigation into the matter traced the cause to the Dual-Frequency Precipitation Radar (DPR) phased array radar which generates cyclical high rate current transients on the spacecraft power bus. The power system electronics interaction with these transients resulted in the current transients in the battery. An accelerated test program was developed to bound the effect, and to assess the impact to the mission.

Lithium Ion Battery Performance

Manned Lunar Landing Via Rendezvous

In any mission description, the vehicles, the flight profiles, and the astrionics hardware to im- plement the mission are all tightly interwoven things. A final result evolves only after many iterations to the solution are made. This paper will describe one of these iterations in the Saturn C-5 Earth Orbit Rendezvous approach to the Manned Lunar Landing Program. Since the iter- ation to be described in an nthone, there exists some basis for the hope that the perturbation from the final solution is small. This paper is not concerned with the landing itself, but only with those operations leading to injection of the space craft into the lunar trans- fer trajectory. However, as is to be expected, it is the target conditions which set the pace for the overall operation. The entire operation must be sized to culminate at a time and place which places the lunar target in an attainable position. The procedure would call for a burst of activity lasting over a relatively short time as compared to the long and extensive preparations leading up to it. The activity must be aimed at the opening of the lunar "launch window". Figure 1 illustrates the variation in the velocity increment required to launch a vehicle into a lunar transfer trajectory from a 485 kilometer earth orbit. The minima are at irregularly spaced intervals and are a func- tion of the inclination of the lunar and the earth satellite planes and of the position of the moon in its orbit around the earth (i. e. , the day of the month). In an operations analysis these spacings will influence the number of vehicles on the launch pad (primary and back-up) , their state of readi- ness, the firing rate, and also the flight profile to be chosen. Whether it is decided to go by "con- necting" or by "tanking" mode, the objective must be to get the spacecraft in the launch ready state at the opening of one of these launch windows. It may be desired that the first vehicle be capable of remaining in a functionally capable state even after bridging one or more of the gaps between the windows. This consideration will influence the design of the vehicles as well as the operational modes to be designed into the flight control hard- ware. For example, a sleep switch may be de- sirable from the standpoint of savings in battery we ight.

LUNAR LANDING

FAST Spacecraft Battery Design and Performance

The Fast Auroral Snapshot (FAST) Explorer spacecraft is to study the physical processes that produce the aurora borealis and aurora australis. It is a unique plasma physics experiment that will take fundamental measurements of the magnetic and electrical fields. This investigation will add significantly to our understanding of the near-earth space environments and its effect. The FAST has a 1 year requirement and 3-year goal for its mission life in low earth orbit. The FAST power power system topology is a Direct Energy Transfer (DET) system based on the SAMPEX design. The FAST flight battery supplies power to the satellite during pre-launch operations, the launch phase, the eclipse periods for all mission phases, and when the load is about 50 watts.

Jung, David S.

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez

Introduction to the JPSS-2 Advanced Technology Microwave Sounder (ATMS) Government Calibration Data Book (GCDB)

The third Advanced Technology Microwave Sounder (ATMS) is an instrument onboard the Joint Polar Satellite System (JPSS), JPSS-2 (renamed NOAA-21 in orbit) mission. This report is to introduce the JPSS-2 Government Calibration Data Book (J2 GCDB) for ATMS, SN 304. This J2 GCDB document contains key information generated during the calibration testing campaign that is driving parameters for radiometric performance. This document also contains supporting data that augments the calibration results. The values in this document are utilized by ATMS’s calibration packet which is, in turn, an integral component in the interpretation of science data. The calibration data in this report was collected from tests such as shelf-level testing, antenna testing, instrument thermal vacuum (TVAC) testing; satellite TVAC testing; and JPSS-2 post-launch tests. JPSS-2 was launched on November 10, 2022. In the subsequent years, the Government will release an ATMS GCDB for each JPSS mission. We expect that all public users can download these ATMS GCDBs from the NOAA operational Integrated Calibration and Validation System (ICVS) website, see more discussions below. The goal of this GCDB is to demonstrate how to characterize ATMS measurements using JPSS-2 ATMS on-orbit operational data and to provide relevant explanations. This document serves as a primary public domain reference for calibrating operational ATMS Raw Data Records (RDR) science data, as used in the current operational Interface Data Processing Segment (IDPS) system. This same RDR science data is distributed through direct broadcast (DB) to DB users for use in their ground processing systems. This J2 GCDB provides the results of the ATMS system radiometric calibration, the antenna flat reflector emissivity [1], the antenna pattern measurements, the antenna pattern corrected brightness temperature [2], the brightness temperature of the lunar disk [3], Lunar Intrusion (LI) correction algorithm [4], receiver spectral parameters, and mechanical alignment on-orbit pointing results, and the striping effect appeared significantly in S-NPP on-orbit radiance data when the data are compared to the Radiative Transfer Model (RTM) simulation in numerical weather prediction (NWP) system [5]. It also provides the parameters required for conversion of telemetry counts to engineering units, for radiometric calibration, and for antenna beam geo-location. Moreover, it provides JPSS-2 ATMS Spectral Response Functions data, some additional information related to ATMS on-orbit performance, on-orbit lunar intrusion correction parameters and Earth contamination bias, and on how to derive ATMS RDR, antenna Temperature Data Records (TDR), and Sensor Data Records (SDR). Furthermore, an introduction of NOAA operational Integrated Calibration and Validation System (ICVS) website and services is added in this J2 GCDB. This ICVS hosts a long-term monitoring system which allows to visualization and comparison of data from JPSS missions, NOAA legacy Polar Operational Environmental Satellites (POES), and Geostationary Operational Environmental Satellites (GOES). From NOAA Comprehensive Large Array-data Stewardship System (CLASS), the public users can download all JPSS ATMS data products for all JPSS missions.

Microwave Sounder