Search NASA⌕ Search

SEARCH · Search NASA

Results for “Oregon Public Utilities Commission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Considerations for Resilience Guidelines for Clean Energy Plans: For the Oregon Public Utility Commission and Oregon Electricity Stakeholders

This document summarizes relevant approaches, research, models, and national examples for state utility regulators tasked with developing utility guidelines for risk-based resiliency planning. In 2021, the Oregon Legislature enacted a 100 percent clean electricity by 2040 standard that requires the Oregon Public Utility Commission (PUC) to oversee utility planning for aggressive clean energy deployment through Clean Energy Plans (House Bill 2021, Sec. 4). In addition to meeting emissions reductions targets, Clean Energy Plans must also: "Include a risk-based examination of resiliency opportunities that includes costs, consequences, outcomes, and benefits based on reasonable and prudent industry resiliency standards and guidelines established by the Public Utility Commission." This report will support the Oregon Public Utility Commission in developing resilience guidelines. Other state public utility commissions may also benefit from this research.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution System Planning - State Examples by Topic

The U.S. Department of Energy (DOE) recently completed a study on how regulators in 16 states have dealt with questions related to distribution system planning (DSP) and distributed energy resource (DER) utilization. During the study, DOE and three of its national laboratories developed a significant amount of information on state-level activities including grid modernization planning; distribution planning; tools for integrating distributed energy resources (DERs) (e.g., hosting capacity analysis and tools for maximizing the value of DERs to the distribution system such as locational value analyses); and linkages between distribution planning and related processes such as cost recovery through general rate cases or rate surcharges. The Oregon Public Utility Commission (Commission) requested assistance from DOE on a list of specific questions related to DSP. The Commission was specifically interested in identifying guidance on the creation of comprehensive and transparent utility distribution system plans; on the linkages between such plans and other utility planning processes such as integrated resource planning; improved forecasting and representation of DERs in distribution system plans and other plans such as integrated resource planning; valuation of DERs; and a roadmap for optimized locational planning for DERs. In response to their interests, we have identified 1) specific topics from the original study that would be of assistance to the Commission and 2) states that could provide potential examples or templates to draw from. In this report, we have summarized and reorganized the pertinent original material by subject. We also developed a matrix that points to specific examples for each topic and provide one or two paragraph summaries of each possible template for each topic area with web links directly to the source documents. For some cases in which states have taken significant steps since the publication of the original DOE study, the original source information has been supplemented to ensure the information provided to the Commission remains current. Finally, we called out a small number of especially pertinent or immediately useful documents and have highlighted these in the introductory section. This report documents the material developed for the Oregon Commission by DOE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Holistic Marine Energy Resource Assessments: A Wave and Offshore Wind Perspective of Metocean Conditions

Offshore wind and wave energy resources are possibly the last significantly untapped renewable energy resource, and could play a significant role in mitigating the worst impacts of climate change via the generation of renewable electricity. However, offshore wind and wave energy resource assessments have been conducted as independent parallel processes, with little interaction with regard to best practices, lessons learnt, or opportunities to create compatible methodologies for future utilization by the broader marine energy sector. Based on the latest technical specifications from the International Electrotechnical Commission, and the highest fidelity publicly available datasets, the offshore wind and wave conditions at the PacWave site off Oregon, USA were quantified. The results clearly show a significant untapped energy resource an annual average wave energy flux of ~35kW/m and a mean average wind speed of 7.8m/s. The offshore wind and wave energy resources both show significant seasonal variation, with offshore wind also featuring a consistent daily profile during summer. Finally, opportunities and challenges associated with developing a holistic assessment of offshore marine energy resources were discussed and recommendations provided.

Robertson, Bryson↗

Comparative Survival Study (CSS) of PIT-Tagged Spring/Summer Chinook and Summer Steelhead : 2008 Annual Report.

The Comparative Survival Study (CSS; BPA Project 199602000) began in 1996 with the objective of establishing a long term dataset of the survival rate of annual generations of salmon from their outmigration as smolts to their return to freshwater as adults to spawn (smolt-to-adult return rate; SAR). The study was implemented with the express need to address the question whether collecting juvenile fish at dams and transporting them downstream in barges and trucks and releasing them downstream of Bonneville Dam was compensating for the effect of the Federal Columbia River Power System (FCRPS) on survival of Snake Basin spring/summer Chinook salmon migrating through the hydrosystem. The Completion of this annual report for the CSS signifies the 12th outmigration year of hatchery spring/summer Chinook salmon marked with Passive Integrated Transponder (PIT) tags as part of the CSS and the 9th complete brood year return as adults of those PIT-tagged fish (report covers adult returns from 1997-2006 hatchery Chinook juvenile migrations). In addition, the CSS has provided PIT-tags to on-going tagging operations for wild Chinook since 2002 (report covers adult returns from 1994-2006 wild Chinook juvenile migrations). The CSS tags wild steelhead on the lower Clearwater River and utilized wild and hatchery steelhead from other tagging operations in evaluations of transportation (report covers adult returns from 1997-2005 wild and hatchery steelhead migrations). The primary purpose of this report is to update the time series of smolt-to-adult survival rate data and related parameters with additional years of data since the completion of the CSS 10-yr retrospective analysis report (Schaller et al 2007). The 10-yr report provided a synthesis of the results from this ongoing study, the analytical approaches employed, and the evolving improvements incorporated into the study as reported in CSS annual progress reports. This current report specifically addresses the constructive comments of the most recent regional technical review conducted by the Independent Scientific Advisory Board and Independent Scientific Review Panel (ISAB and ISRP 2007). This report completes the 3-salt returns from migration years 2004 for wild and hatchery Chinook and steelhead (all returns are to Lower Granite Dam). For wild and hatchery Chinook, this report also provides 3-salt returns from migration year 2005 and 2-salt returns from migration year 2006 through a cutoff date of August 13, 2008. For wild and hatchery steelhead, it provides completed 2-salt returns for wild and hatchery steelhead that outmigrated in 2005 (any 3-salt returns of PIT-tagged steelhead are few, but will occur after July 1, 2008). All of the Chinook salmon evaluated in the CSS study exhibit a stream-type life history. All study fish used in this report were uniquely identifiable based on a PIT-tag implanted in the body cavity during (or before) the smolt life stage and retained through their return as adults. These tagged fish can then be detected as juveniles and adults at several locations of the Snake and Columbia rivers. Reductions in the number of individuals detected as the tagged fish grow older provide estimates of survival. This allows comparisons of survival over different life stages between fish with different experiences in the hydrosystem (e.g. transportation vs. in-river migrants and migration through various numbers of dams) as illustrated in Figure 1.1. The CSS is a long term study within the Northwest Power and Conservation Council's Columbia Basin Fish and Wildlife Program (NPCC FWP) and is funded by Bonneville Power Administration (BPA). Study design and analyses are conducted through a CSS Oversight Committee with representation from Columbia River Inter-Tribal Fish Commission (CRITFC), Idaho Department of Fish and Game (IDFG), Oregon Department of Fish and Wildlife (ODFW), U.S. Fish and Wildlife Service (USFWS), and Washington Department of Fish and Wildlife (WDFW). The Fish Passage Center (FPC) coordinates the PIT-tagging efforts, data management and preparation, and CSSOC work. The location of all tagging sites is identified in Figures 1.2 and 1.3. All draft and final written work products are subject to regional technical and public review and are available electronically on FPC and BPA websites: FPC: http://www.fpc.org/documents/CSS.html; and BPA: http://www.efw.bpa.gov/searchpublications/index.aspx?projid.

13 HYDRO ENERGY↗