Search NASA⌕ Search

SEARCH · Search NASA

Results for “Outage optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

High-Rate Communications Outage Recorder Operations for Optimal Payload and Science Telemetry Management Onboard the International Space Station

All International Space Station (ISS) Ku-band telemetry transmits through the High-Rate Communications Outage Recorder (HCOR). The HCOR provides the recording and playback capability for all payload, science, and International Partner data streams transmitting through NASA's Ku-band antenna system. The HCOR is a solid-state memory recorder that provides recording capability to record all eight ISS high-rate data during ISS Loss-of-Signal periods. NASA payloads in the Destiny module are prime users of the HCOR; however, NASDA and ESA will also utilize the HCOR for data capture and playback of their high data rate links from the Kibo and Columbus modules. Marshall Space Flight Center's Payload Operations Integration Center manages the HCOR for nominal functions, including system configurations and playback operations. The purpose of this paper is to present the nominal operations plan for the HCOR and the plans for handling contingency operations affecting payload operations. In addition, the paper will address HCOR operation limitations and the expected effects on payload operations. The HCOR is manifested for ISS delivery on flight 9A with the HCOR backup manifested on flight 11A. The HCOR replaces the Medium-Rate Communications Outage Recorder (MCOR), which has supported payloads since flight 5A.1.

Shell, Michael T.↗

Joint Communication Resource Allocation and Velocity Selection in Urban Air Mobility via Multi-agent Reinforcement Learning

With traffic congestion problems becoming more severe in urban areas, the National Aeronautics and Space Administration promotes the Urban Air Mobility (UAM) concept, which envisages a safe and efficient air transportation system. However, the increased communication demands in UAM can exacerbate the spectrum scarcity. Therefore, a new communication resource allocation solution is necessary. In this paper, we focus on uplink UAM communications, where multiple aerial vehicles (AV) perform cargo/passenger delivery tasks. With predefined flight paths, AVs make decisions on communication resource allocation and velocity selection to complete their missions under safety constraints. Accordingly, we formulate a joint optimization problem to minimize the weighted sum of the total travel time and communication outage time. We first model the optimization problem as a Markov game and propose a multi-agent reinforcement learning based solution. Simulation results corroborate the effectiveness of the proposed solution.

Ruixuan Han↗

Low cost Ku-band earth terminals for voice/data/facsimile

A Ku-band satellite earth terminal capable of providing two way voice/facsimile teleconferencing, 128 Kbps data, telephone, and high-speed imagery services is proposed. Optimized terminal cost and configuration are presented as a function of FDMA and TDMA approaches to multiple access. The entire terminal from the antenna to microphones, speakers and facsimile equipment is considered. Component cost versus performance has been projected as a function of size of the procurement and predicted hardware innovations and production techniques through 1985. The lowest cost combinations of components has been determined in a computer optimization algorithm. The system requirements including terminal EIRP and G/T, satellite size, power per spacecraft transponder, satellite antenna characteristics, and link propagation outage were selected using a computerized system cost/performance optimization algorithm. System cost and terminal cost and performance requirements are presented as a function of the size of a nationwide U.S. network. Service costs are compared with typical conference travel costs to show the viability of the proposed terminal.

Kelley, R. L.↗

Monitoring Airspace Complexity and Determining Contributing Factors

The national airspace has evolved over many years to accommodate increased traffic demand [1] while simultaneously maintaining one of the safest forms of transportation [2], [3]. One of the reasons for this success is the ability of the system and the operators to adapt and accommodate to situations that routinely disrupt optimal operations. These situations may include: adverse weather, delays, early arrivals, equipment outages, and other factors that are outside the operators ability to control. These factors can lead to states where automation is unable to properly handle these issues and therefore air traffic controllers and pilots have to intervene, ultimately increasing communication between operators resulting in higher workload. As controller workload increases to handle sub-optimal operating conditions this can be viewed as an increase in complexity. The reasoning for this is because humans are now required to make tactical decisions in response to external factors, resulting in a departure from the strategic plan where operations would be more efficiently managed. Human operators control airspace complexity under rigid regulations that are constantly changing. The airspace is divided into sectors and the number of aircraft assigned to each controller is limited for safe handling. There has been past work that devised airspace complexity metrics in commercial aviation and related these metrics to controller workload (e.g., [4],[5]). The upper bounds on the system load are pre-determined. Such bounds on complexity make for a safe system, but the system cannot scale and adapt to autonomous, dense, and heterogeneous traffic, including the many types of Unmanned Aerial Vehicles (UAVs) envisioned to be added to the operations. We hypothesize that, as traffic density and heterogeneity grow, and other key metrics change, there will be phase transitions at which the way traffic should be managed changes significantly [6]. We offer a method for in-time detection of contributing factors that lead to phase transitions, characterized by increased complexity. To the best of our knowledge, there is no tool similar to our proposed effort that identifies such contributing factors or precursor patterns. To define the scope we are proposing to measure complexity from the viewpoint of the Terminal Radar Approach Control Facilities (TRACON) controller’s perspective. In particular we are analyzing arrivals into KSFO. With safety as the top concern for airspace operators, it is important to recognize that as density and heterogeneity grow, the focus of the system will change. Times of the day when the airspace has low density and heterogeneity, the flights will follow more efficient paths where the aircraft move on established routes that are more or less directly to the destination. However, when density and heterogeneity increases, the system will begin changing focus to avoiding conflicts and collisions and route the flights in a more flexible way. Higher flexibility requires more communication and coordination between controllers and pilots which the current automation is unable to handle. This paper proposes a novel approach that monitors airspace complexity at multiple scales, uses a Machine Learning-based tool that predicts when operations will transition to a regime of greater complexity, and identifies actions that can reduce the complexity while still maintaining efficient and safe operations. We demonstrate our proposed approach using data from multiple complementary sources. This includes, but is not limited to: historical aircraft surveillance data from NASA’s Sherlock Data Warehouse [7], METAR weather data, and airport configuration data from Aviation System Performance Metrics (ASPM). The surveillance data flight paths are sampled at a variable sample rate — increasing as the aircraft approaches the airport. This is due to how Sherlock manages flight track stitching between different radar facilities which have different sampling rates. The weather and performance data are logged at defined intervals throughout the day at a courser refresh rate. In addition to the logged data and metrics, we leverage pre-defined Standard Terminal Arrival Routes (STARs) procedures to characterize the path of each flight. Each flight files for one of these routes in the flight plan well before entering the terminal airspace, and approximately follows the route until it leaves the STAR, typically on the final fix of a runway transition. However, most flights do not always fly the full STAR procedure to completion [8], but the majority do adhere to the fixes within the common route of the procedure. Our approach leverages fixes in the common route of each of the STARs to build a reference path to the airport. This allows us to characterize the flight paths in what we are defining as the “maneuvering area” (the airspace between the STAR and before the flight is lined up on the runway’s final approach) to determine how off nominal the flights are to calculate its complexity score. Determining airspace complexity is a concept that does not have a concrete answer. In designing this metric, we consider what increases the workload for the air traffic controllers. Consequently more specialized vectoring maneuvers results in higher workload. Accordingly, we start with a theory: each flight has a direct path it takes from the STAR’s common route to the final approach’s outer marker fix for the flight’s landing runway. It is important to note that the direct path is only used as a reference. If the majority of the flights have a large consistent offset as compared to other routes it does not necessarily mean that those flights have higher complexity. We are merely building a distribution based on this direct path for that particular STAR and runway pair to determine the normal mode of operations for that route. Flights that are in the upper tail of these distributions will result in higher complexity scores and flights that fly in the median will represent the normal mode of operations and therefore will have lower complexity scores. Since flights following each STAR route take different paths to the airport, we have a different distribution for each STAR route and therefore can model these distributions to compute a complexity score from their respective normalized distributions. To evaluate the effectiveness of our proposed airspace complexity metric we will compare against an established approach based on trajectory clustering [9]. This unsupervised learning technique consists of the following steps: (1) identify the general maneuvering areas (waypoints) by performing $\kappa$-means or DBSCAN clustering on locations where aircraft frequently turn based on the surveillance radar track data, (2) map flight trajectories onto sequences of waypoints, and (3) cluster the sequences based on their common subsequences. From a high-level perspective, this baseline model learns nominal operations in the airspace through the sequence of waypoints that are representative of where aircraft change direction and defines deviations from the nominal operations as “complex.” Therefore, more deviations from the nominal operations correspond to higher complexity values. For our validation, we re-implemented this technique and tune model hyper-parameters to correctly detect waypoints for the arrival traffic into the San Francisco bay area. We will compute the complexity measure over a one-year period using our proposed technique as well as the baseline. Our validation will be based on each technique’s ability to detect a set of undesirable outcomes (e.g., go-arounds, holding patterns, average time in the airspace, etc.). Since our current complexity metric is derived from the offset from the direct reference path, it’s important to understand what causes these offsets. In many of the flights with high offset distance, flights performing holding patterns and S turns can be observed. These maneuvering tactics are utilized to add distance between the aircraft and the destination runway to prevent multiple flights from having conflicting arrival times. In order to predict a rise in complexity (or the precursor to complexity), it’s necessary to be able to identify these potential conflicts (which in turn, result in higher offsets). To do this, we define a “representative flight” for each STAR route and runway pair. This flight is approximately the path the flight would take if there was a clear path with no other flights in the airspace — including the time remaining to the airport. We first identify the flights for a given STAR runway pair using the offset to the reference path distributions that fall between the 44-55 percentiles. This yields the flights that conform to the most normal mode of operation. Each of these flights is partitioned based on the percent complete from the entry point into the maneuvering areas from 0\% – 100\% complete. Then for each percent “bin”, we take the median value of the flight’s latitude/longitude coordinates, airspeed, and (non causal) time remaining to the airport to construct a lookup table for each percent complete bin on a given route. As a flight enters the maneuvering area, we can find the estimated arrival time of a flight to the airport by finding the closest point to the representative path’s percent complete bin (relative to the flight’s current position at any snapshot in the airspace) and therefore retrieve the corresponding remaining time left on the “representative path”. We assume that the flight will follow the representative path to completion when deriving these estimates. We can then compare these estimated arrival times against other flights for the same snapshot in time to identify potential conflicts. If more flights are estimated to arrive within a tolerance window than there are runways available, then we have a potential conflict. We can use this derived measure along with other factors expected to add disruption to the operation such as weather and runway configuration changes as an input to machine learning tools to detect precursors that increases in our complexity measure. This novel method will assist in uncovering insights into the contributing factors that lead to increased complexity that may allow for in-time responses to avoid reaching a high complexity state in the airspace.

complexity↗

Beaconless Optical Communication System Constraints

Deep-space optical communication will enable increased science return and public engagement for robotic and manned missions. The IROC project is studying a beaconless optical communication system for Mars data downlink. A star tracker provides the optical communications pointing information in place of an uplink targeting beacon. The configuration presented in this paper includes a star tracker that is aligned co-boresighted with the optical communication axis. This co-boresight configuration was not discussed in prior work, as it was assumed that large Sun-Probe-Earth keep-out angle requirements for operation of the star tracker would cause significant communication outages. In this paper it is shown that the use of an optimal mechanical mounting angle combined with an advanced star tracker has the capability to yield up to 92% communication availability for an example five-year Mars mission.

Aretskin-Hariton, Eliot D.↗

Wireless Channel Characterization in the Airport Surface Environment

Given the anticipated increase in air traffic in the coming years, modernization of the National Airspace System (NAS) is a necessity. Part of this modernization effort will include updating current communication, navigation, and surveillance (CNS) systems to deal with the increased traffic as well as developing advanced CNS technologies for the systems. An example of such technology is the integrated CNS (ICNS) network being developed by the Advanced CNS Architecture and Systems Technology (ACAST) group for use in the airport surface environment. The ICNS network would be used to convey voice/data between users in a secure and reliable manner. The current surface system only supports voice and does so through an obsolete physical infrastructure. The old system is vulnerable to outages and costly to maintain. The proposed ICNS network will include a wireless radio link. To ensure optimal performance, a thorough and accurate characterization of the channel across which the link would operate is necessary. The channel is the path the signal takes from the transmitter to the receiver and is prone to various forms of interference. Channel characterization involves a combination of analysis, simulation, and measurement. My work this summer was divided into four tasks. The first task required compiling and reviewing reference material that dealt with the characterization and modeling of aeronautical channels. The second task involved developing a systematic approach that could be used to group airports into classes, e.g. small airfields, medium airports, large open airports, large cluttered airports, etc. The third task consisted of implementing computer simulations of existing channel models. The fourth task entailed measuring possible interference sources in the airport surface environment via a spectrum analyzer.

Neville, Joshua T.↗

Initial Characterization of Optical Communications with Disruption-Tolerant Network Protocols

Disruption-tolerant networks (DTNs) are groups of network assets connected with a suite of communication protocol technologies designed to mitigate the effects of link delay and disruption. Application of DTN protocols to diverse groups of network resources in multiple sub-networks results in an overlay network-of-networks with autonomous data routing capability. In space environments where delay or disruption is expected, performance of this type of architecture (such as an interplanetary internet) can increase with the inclusion of new communications mediums and techniques. Space-based optical communication links are therefore an excellent building block of space DTN architectures. When compared to traditional radio frequency (RF) communications, optical systems can provide extremely power-efficient and high bandwidth links bridging sub-networks. Because optical links are more susceptible to link disruption and experience the same light-speed delays as RF, optical-enabled DTN architectures can lessen potential drawbacks and maintain the benefits of autonomous optical communications over deep space distances. These environment-driven expectations - link delay and interruption, along with asymmetric data rates - are the purpose of the proof-of-concept experiment outlined herein. In recognizing the potential of these two technologies, we report an initial experiment and characterization of the performance of a DTN-enabled space optical link. The experiment design employs a point-to-point free-space optical link configured to have asymmetric bandwidth. This link connects two networked systems running a DTN protocol implementation designed and written at JPL for use on spacecraft, and further configured for higher bandwidth performance. Comparing baseline data transmission metrics with and without periodic optical link interruptions, the experiment confirmed the DTN protocols' ability to handle real-world unexpected link outages while maintaining capability of reliably delivering data at relatively high rates. Finally, performance characterizations from this data suggest performance optimizations to configuration and protocols for future optical-specific DTN space link scenarios.

Space networking↗

A solution to the problem of optimizing the fuel bias for a liquid propellant rocket by an application of the central limit theorem

A method of determining the fuel bias for a bipropellant liquid rocket that minimizes outage associated penalties on payload potential is presented. A fuel bias so derived is normally called the optimum fuel bias. The subjects discussed are: (1) probability density function of outage, (2) computer program listing, and (3) choosing the optimum fuel bias.

Viera, W. J.↗

Optimization of the effective GPS data rate

Ohio University's Avionics Engineering Center is performing research directed towards the integration of the NAVSTAR Global Positioning System (GPS) and the Inertial Navigation System (INS) for attitude and heading determination. The integration of GPS/INS offers synergistic benefits. INS gyro drift error can be compensated by the long-term stability of GPS by means of an in-flight data monitoring algorithm. Using GPS data as a reference is more advantageous than implementing an additional INS since GPS offers a dissimilar redundancy to the attitude and heading determination configuration. In converse, the short-term stability of the INS can be used to correct or substitute for faulty GPS data due to tracking loop phase lag or data gaps because of satellite shielding. The optimization of the effective GPS data rate is essential for the proper execution of an integrated GPS/INS in-flight algorithm. GPS attitude and heading information must be consistently available during INS outages. Present research efforts involve the development of an in-flight algorithm that maximizes the potential of integrated GPS/INS. This algorithm determines the acceptable limits of phase lag that the GPS tracking loop introduces to the flight control system (FCS) during the transmission of information. Once these calculated limits are exceeded, INS data are used to insure the continuous availability of attitude and heading information to the flight control system.

Mcintyre, David S.↗

Characterization of Operational Performance of Ka-Band Links in Deep Space Network

This paper presents a characterization of performance of 32-GHz Ka-band link in an operational environment. The data come from tracking of Kepler spacecraft by the NASA Deep Space Network (DSN) in the past few years. Ka-band link offers a significant signal-to-noise advantage compared to the more common X- or S-band; however, it is subject to more signal fluctuation caused by the weather. Kepler is the first mission supported by the DSN that solely rely on the higher deep space Ka-band communications link to return its high-rate science data. A well characterization of the operational performance of Kepler would benefit future Ka-band missions, especially for those operating with smaller link margin. The study examines how weather conditions at the DSN facilities (e.g., winds, clouds, rains) affect the received signal, particularly on telemetry data. It addresses questions such as how often the weather affects the link and how much degradation the link could suffer. Among the 22 Ka-band passes in 2012, heavy clouds affected one pass and two passes were impacted by high winds. The adverse weather caused at time as much as 3-dB instantaneous change in the signal to noise ratio (SNR). Estimates of degradation to the SNR as a function of wind speeds are captured based on observations. This study also quantifies the probability distribution of the variation of received signal power. With such information, future missions can better plan their link design. An optimal link design aims for just having enough margin to realize the data return with a targeted probability, with neither having too much margin that it reduces the downlink data rate nor insufficient reserve that causes frequent data outages. The study tries to provide some answers to the questions such as how much does SNR vary from one tracking pass to the next, and what is the cumulative distribution of signal fluctuation. Regarding the signal variation over many tracking passes, we found that the averaged symbol SNR (SSNR) for each pass changed by as much as 4 dB. Some variations were due to geometry such as the changing distance between spacecraft and Earth and different antenna pointing elevations. Other variations seem to be random in nature, reflecting the randomness of operational environments. Some passes were found to be quite stable, with a standard deviation of symbol SNR around 0.25 dB while others had greater variation, up to 1.4 dB. Overall, the cumulative distribution of the symbol SNR reflects that 50% of the fluctuations was less than 0.6 dB, 90% of fluctuation was within 1.6 dB and 95% within 2.2 dB. Some of the challenges in data processing, validation and modeling were captured in this paper. We observed some inconsistent measurements where operational data significantly deviate from a normal expectation. These inconsistent measurements made it hard to develop an accurate and consistent performance model, such as the degradation of signal SNR as a function of high wind. The difficulty was compounded by the fact that there were only a few Ka-band passes observed in high winds.

Pham, Timothy↗

Missed Thrust Analysis and Design for Low Thrust Cislunar Transfers

This paper details the analysis of the missed thrust problem for low thrust cislunar transfers. Missed thrust analysis is completed for a reference NRHO to DRO transfer that is designed to maximize the final mass without consideration of robustness to unexpected loss of thrust. A new missed thrust design method is presented to include the robustness of the transfer as part of the optimization problem by including a minimal number of branching trajectories tied to the start of thrust arcs in the reference transfer and optimizing them all simultaneously. Results from variations of this approach are presented for and compared to the reference transfer designed without consideration for missed thrust. The results show that this new method can reduce the additional propellant required for recovery from an unexpected 7-day outage by up to 90% without significant increase to the propellant required to complete the reference transfer.

Grebow, Daniel J.↗

Lightning location system supervising Swedish power transmission network

For electric utilities, the ability to prevent or minimize lightning damage on personnel and power systems is of great importance. Therefore, the Swedish State Power Board, has been using data since 1983 from a nationwide lightning location system (LLS) for accurately locating lightning ground strikes. Lightning data is distributed and presented on color graphic displays at regional power network control centers as well as at the national power system control center for optimal data use. The main objectives for use of LLS data are: supervising the power system for optimal and safe use of the transmission and generating capacity during periods of thunderstorms; warning service to maintenance and service crews at power line and substations to end operations hazardous when lightning; rapid positioning of emergency crews to locate network damage at areas of detected lightning; and post analysis of power outages and transmission faults in relation to lightning, using archived lightning data for determination of appropriate design and insulation levels of equipment. Staff have found LLS data useful and economically justified since the availability of power system has increased as well as level of personnel safety.

Melin, Stefan A.↗

Global Precipitation Measurement (GPM) Orbit Design and Autonomous Maneuvers

The NASA Goddard Space Flight Center's Global Precipitation Measurement (GPM) mission will meet a challenge of measuring worldwide precipitation every three hours. The GPM spacecraft, part of a constellation, will be required to maintain a circular orbit in a high drag environment to accomplish this challenge. Analysis by the Flight Dynamics Analysis Branch has shown that the prime orbit altitude of 40% is necessary to prevent ground track repeating. Combined with goals to minimize maneuver impacts to science data collection and enabling reasonable long-term orbit predictions, the GPM project has decided to fly an autonomous maneuver system. This system is a derivative of the successful New Millennium Program technology flown onboard the Earth Observing-1 mission. This paper presents the driving science requirements and goals of the mission and shows how they will be met. Analysis of the orbit optimization and the AV requirements for several ballistic properties are presented. The architecture of the autonomous maneuvering system to meet the goals and requirements is presented along with simulations using a GPM prototype. Additionally, the use of the GPM autonomous system to mitigate possible collision avoidance and to aid other spacecraft systems during navigation outages is explored.

Folta, David↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Monitoring Airspace Complexity and Determining Contributing Factors

The national airspace has evolved over many years to accommodate increased traffic demand while simultaneously maintaining air travel as one of the safest forms of transportation. One of the reasons for this success is the ability of the air traffic control system and the operators to adapt and accommodate to situations that routinely disrupt normal operations. These situations may include: adverse weather, delays, early arrivals, equipment outages, and other factors that are outside the operators’ ability to control. These factors can lead to states where automation is unable to properly handle these issues, and therefore air traffic controllers and pilots have to intervene — ultimately increasing communication between operators resulting in higher workload. As controller workload increases to handle sub-optimal operating conditions, complexity increases. This is because, under these conditions humans are required to make tactical decisions in response to external factors. This results in a departure from the original strategic plan where operations would be more efficiently managed. Human operators manage airspace complexity under rigid regulations but in a constantly changing environment. The airspace is divided into sectors and the number of aircraft assigned to each controller is limited for safe handling. Some prior studies devised airspace complexity metrics in commercial aviation and related these metrics to controller workload. The upper bounds on the system load are pre-determined. Such bounds on complexity make for a safe system, but the system cannot scale and adapt to autonomous, dense, and heterogeneous traffic — including the many types of Unmanned Aerial Vehicles (UAVs) envisioned to be added to the operations. We hypothesize that, as traffic density and heterogeneity grow, and other key metrics change, there will be phase transitions at which the way traffic should be managed changes significantly. We offer a method for in-time detection of contributing factors that lead to phase transitions, characterized by increased complexity. To the best of our knowledge, there is no tool similar to ours that identifies such contributing factors or precursor patterns.

Precursor↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Concepts for 18/30 GHz satellite communication system study. Executive summary

An examination of a multiplicity of interconnected parameters ranging from specific technology details to total system economic costs for satellite communication systems at the 18/30 GHz transmission bands are presented. It was determined that K sub A band systems can incur a small communications outage during very heavy rainfall periods and that reducing the outage to zero would lead to prohibitive system costs. On the other hand, the economics of scale, ie, one spacecraft accommodating 2.5 GHz of bandwidth coupled with multiple beam frequency reuse, leads to very low costs for those users who can tolerate the 5 to 50 hours per year of downtime. A multiple frequency band satellite network can provide the ultimate optimized match to the consumer performance/economics demands.

Baker, M.↗