Search NASA⌕ Search

SEARCH · Search NASA

Results for “Outage optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Update on Nuclear Energy Projects and Plans in Ukraine (Meeting Report)

Following the 1986 disastrous accident at Chernobyl, gaining independence following the fall of the former Soviet Union, two revolutions, and on-going Russian intervention, Ukrainea is seeking to expand its use of commercial nuclear energy and to further reduce its dependence on Russia for energy. Nuclear energy in Ukraine has made a significant contribution toward achieving sustainable development and social goals. Ukraine is very vulnerable to the effects of climate change and nuclear is a cornerstone of the country’s effort to combat the effects. With broad support from the U.S. government, Ukraine is cooperating with the U.S. on fresh nuclear fuel supply, civilian nuclear security, outage optimization, spent fuel storage, and future nuclear technology. And is looking to tap U.S. expertise on plant management, and electric grid operations and expansion. NEIc hosted this virtual event to provide an update on nuclear energy projects and plans in Ukraine. Featured speakers included Yaroslav Demchenkov, Deputy Minister of Energy, Taras Kachka, Deputy Minister – Trade Representative, Petro Kotin, CEO, Energoatom,d and Ann K. Ganzer, Senior Bureau Official, Bureau of International Security and Nonproliferation, U.S. Dept. of State. Maria Korsnick, NEI CEO, moderated the discussion. About forty individuals attended representing the Ukraine and U.S. governments, and U.S. suppliers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Exploring Wildfire & Energy data toward State Prioritization Index (WESPI)

Energy infrastructure can both induce and suffer risks from wildfires ranging from direct damage to energy assets such as substations and power lines to Public Safety Power Shutoffs. Recent wildfire events underscore the need for data-driven approaches that help states and utilities proactively plan for wildfire risk. Existing national tools such as Federal Emergency Management Agency (FEMA)’s National Risk Index (NRI) are valuable for community hazard planning. However, they are less suited for energy infrastructure, as they emphasize population and building exposure rather than system vulnerabilities. In this paper, we explore relationships between energy and wildfire data and present a Wildfire-Energy State Prioritization Index (WESPI). Our methodology combines data from the US Forest Service’s Fire Simulation (FSIM) dataset with energy resilience metrics, historical fire incidents, and geospatial data on transmission lines and fire stations. Correlation analyses suggest that FSIM burn probability is more strongly associated with power outage metrics (ρ = 0.32) than NRI wildfire frequency, and counties with a greater density of fire stations experience more frequent, but less intense wildfires. We further leverage data for burn probability, transmission line density, and fire station density to develop a Wildfire-Energy State Prioritization Index (WESPI) to highlight counties where wildfire hazard, infrastructure exposure, and limited suppression capacity converge. The index provides a consistent, scalable framework for state energy offices and utilities to screen counties for vegetation management, optimization of outage management system deployment, and to inform wildfire mitigation plans.

Critical infrastructure↗

Mitigating Cascading Outages in Severe Weather Using Simulation-Based Optimization

Severe weather events can trigger cascading power outages and lead to significant losses. In this work, we investigate cascading outage mitigation under severe weather conditions. Given day-ahead weather forecasts and component failure models, we aim to identify a set of power lines that can be hardened to minimize the expected impact of potential cascading outages. Since the expected load shedding cannot be expressed as an explicit function of line hardening decisions and system states, we developed a cascading outage simulator to estimate the expected value of load shedding under various initial weather-related disruption scenarios generated using a weather forecast. To avoid massive enumeration of all possible combinations of line hardening decisions and reduce the simulation efforts, we employed an efficient simulation-based optimization approach that quickly identifies the (near) optimal line hardening decisions in the presence of both large simulation noises due to the highly variable initial disturbances and system states, and significant randomness in the subsequent cascades. Furthermore, the algorithm is also able to utilize parallel computing to dramatically reduce computation time to support decision making in preparation for severe weather conditions. We performed a case study on the Northeast Power Coordinating Council (NPCC) 140-bus system model to demonstrate that our approach can significantly improve power grid resilience to adverse weather events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods and Tools To Assess Robustness of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plant (NPP) operating cycle. Refueling outages are extremely costly for an NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities within 30 days on average. Despite detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjustment. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but are often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. This paper focuses on developing tools and methods to support NPPs with outage schedule optimization and it describes the initial development of tools to support outage management that leverage computational and machine learning methods.

97 - MATHEMATICS AND COMPUTING↗

Analytics-at-scale of Sensor Data for Digital Monitoring in Nuclear Plants (3 rd Annual Report)

Nuclear power plants collect and store large volumes of heterogeneous data from various components and systems. With recent advances in machine learning (ML) techniques, these data can be leveraged to develop diagnostic and short-term forecasting models to better predict future equipment condition. Maintenance operations can then be planned in advance whenever degraded performance is predicted, thus resulting in fewer unplanned outages and the optimization of maintenance activities. This enables lower maintenance costs and improves the overall economics of nuclear power. This report primarily focuses on developing a short-term forecasting process that leverages a feature selection process to distill large volumes of heterogeneous data and predict specific equipment parameters. A variety of feature selection methods, including Shapley Additive Explanations (SHAP) and variance inflation factor (VIF), were used to select the optimal features as inputs for three ML methods: long short-term memory (LSTM) networks, support vector regression (SVR), and random forest (RF). Each combination of model and input features was used to predict a pump bearing temperature both 1 and 24 hours in advance, based on actual plant system data. The optimal inputs for the LSTM and SVR were selected using the SHAP values, while the optimal input for the RF consisted solely of the response variable itself. Each model produced similar 1-hour-ahead predictions, with root mean square errors (RMSEs) of roughly 0.006. For the 24-hour-ahead predictions, differences could be seen between LSTM, SVR, and RF, as reflected by model performances of 0.036 ± 0.014, 0.0026 ± 0, and 0.063 ± 0.004 RMSE, respectively. As big data and continuous online monitoring become more widely available, the proposed feature selection process can be used for many applications beyond the prediction of process parameters within nuclear infrastructure. This report summarizes the Fiscal Year 2021 research progress encompassing the (1) data cleaning and feature selection necessary for ML applications; (2) development of short-term forecasting models to predict future plant process parameters for both single and multiple time steps ahead; and (3) validation of the feature selection methods and short-term forecasting models given new data from different systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of Short-Term Forecasting Models Using Plant Asset Data and Feature Selection

Nuclear power plants collect and store large volumes of heterogeneous data from various components and systems. With recent advances in machine learning (ML) techniques, these data can be leveraged to develop diagnostic and short-term forecasting models to better predict future equipment condition. Maintenance operations can then be planned in advance whenever degraded performance is predicted, thus resulting in fewer unplanned outages and the optimization of maintenance activities. This enables lower maintenance costs and improves the overall economics of nuclear power. This paper focuses on developing a short-term forecasting process that leverages a feature selection process to distill large volumes of heterogeneous data and predict specific equipment parameters. A variety of feature selection methods, including Shapley Additive Explanations (SHAP) and variance inflation factor (VIF), were used to select the optimal features as inputs for three ML methods: long short-term memory (LSTM) networks, support vector regression (SVR), and random forest (RF). Each combination of model and input features was used to predict a pump bearing temperature both 1 and 24 hours in advance, based on actual plant system data. The optimal inputs for the LSTM and SVR were selected using the SHAP values, while the optimal input for the RF consisted solely of the response variable itself. Each model produced similar 1-hour-ahead predictions, with root mean square errors (RMSEs) of roughly 0.006. For the 24-hour-ahead predictions, differences could be seen between LSTM, SVR, and RF, as reflected by model performances of 0.036 +- 0.014, 0.0026 +- 0, and 0.063 +- 0.004 RMSE, respectively. As big data and continuous online monitoring become more widely available, the proposed feature selection process can be used for many applications beyond the prediction of process parameters within nuclear infrastructure.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Distribution Grid Management in the Presence of Distributed Energy Resources

The global concerns over climate change, government policies, and incentives in support of distributed energy resources (DERs) are accelerating the growth of DERs in distribution networks. The growth in DER penetration levels can create various issues such as over/under voltages, reverse power flows, overloading, and protection miscoordination. State-of-the-art grid automation solutions such as advanced distribution management systems (ADMS) and distributed energy resource management systems (DERMS) can leverage the DERs to improve distribution grid operations. The ADMS offers advanced grid management functions such as Volt-VAR optimization (VVO), fault management, and outage management to the distribution operator to improve situational awareness and optimize network operations. The DERMS solutions aggregate the small-scale BTM DERs to provide grid services including demand response, voltage regulation, and situational awareness. In this presentation, distribution grid management approaches in the presence of DERs using ADMS and DERMS will be discussed.

ADMS↗

Post-Disaster Microgrid Formation for Enhanced Distribution System Resilience

This paper proposes a deep reinforcement learning (DRL) based approach for post-disaster critical load restoration in active distribution systems to form microgrids through network reconfiguration to minimize critical load curtailments. Distribution networks are represented as graph networks, and optimal network configurations with microgrids are obtained by searching for the optimal spanning forest. The constraints to the research question being explored are the radial topology and power balance. Unlike existing analytical and population-based approaches, which necessitate the repetition of entire analyses and computation for each outage scenario to find the optimal spanning forest, the proposed approach, once properly trained, can quickly determine the optimal, or near-optimal, spanning forest even when outage scenarios change. When multiple lines fail in the system, the proposed approach forms microgrids with distributed energy resources in active distribution systems to reduce critical load curtailment. The proposed DRL-based model learns the action-value function using the REINFORCE algorithm, which is a model-free reinforcement learning technique based on stochastic policy gradients. A case study was conducted on a 33-node distribution test system, demonstrating the effectiveness of the proposed approach for post-disaster critical load restoration.

active distribution systems↗

Recovery Simulator and Analysis Formulation: Mathematical Framework for Enhanced Resilience and Resource Allocation

This report introduces recovery simulator and analysis (RSA), a framework aimed at enhancing the resilience of electrical grids post-disruption. The RSA model leverages an optimization problem formulation that focuses on maximizing the load served (or optionally customers served) through a coordinated and cooptimized recovery of non-black start generation, transmission lines, feeders and substations subject to labor budget constraints. By integrating advanced linear programming techniques, the simulator selects efficient reocovery pathways, optimizing both short-term and long-term grid recovery strategies. The mathematical framework guides decision-making through a comprehensive evaluation of potential recovery actions, factoring in the trade-offs between labor constraints and load (or optionally customer) restoration efficacy. This enables grid operators to simulate diverse outage scenarios and delineate optimal recovery pathways, thereby prioritizing critical repair tasks and ensuring resource allocation is both economical and effective. The intended use case of RSA is to allow planners to explore many recovery scenarios quickly and determine assets most critical across a wide range of scenarios, and therefore strong candidates for hardening or additional investment. RSA might also be used in an operational setting, following a single event, for exploring efficient recovery pathways.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Power System Resilience Enhancement in Typhoons Using a Three-Stage Day-Ahead Unit Commitment

In this work, we propose a three-stage resilient unit commitment model which considers uncertain typhoon paths and line outages to improve the power system resilience against typhoon events. The proposed solution coordinates resources in response to the worst-case scenario for each possible typhoon path. The optimal decision is based on the characterization of the power system schedule into three stages of preventive control, emergency control, and restoration. Preventive control is performed before the typhoon occurs by quickly adjusting the three-stage resilient unit commitment schedule; emergency control is conducted during the typhoon by shedding local loads to meet the power balance, while other control strategies are assumed to be unavailable due to possible interruptions in the communication system; restoration is realized after the typhoon, when resources are optimally dispatched to repair the outages of critical devices and recover the normal operation state of the power system quickly. Considering the typhoon path uncertainty, we have introduced a stochastic model for possible typhoon paths where all possible affected lines along each typhoon path are assumed to be on outage during the typhoon. Accordingly, we explore the strategy for co-optimizing the three stages in unit commitment. The proposed model is tested on the IEEE 118-bus system and the real-world provincial system to verify its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimizing the physical design and layout of a resilient wind, solar, and storage hybrid power plant

We report as wind and solar technologies improve and their costs decrease, the share of power produced by these sources will increase. As the market penetration increases, these power sources will need to provide grid services, such as dispatchability, in addition to providing energy. One way to reduce variability, provide higher quality power to the grid, and address local grid stability issues is through colocating wind and solar power plants. In addition to operating reliably during normal operating conditions, in scenarios with high penetrations of renewable generation, it is important that these hybrid plants can withstand production disruptions and continue to supply power despite prolonged resource reduction, extreme weather events, or other disruptions. In this paper, we present a methodology to optimize a wind-solar-battery hybrid power plant down to the component level that is resilient against production disruptions and that can continually produce some minimum required power. We introduce the models and assumptions we used to simulate a hybrid power plant as well as the design variable parameterization and specific methods we used to optimize the plant. We demonstrate the performance of our method by comparing a plant optimized for different objectives, generation outage durations, minimum power requirements, and power purchase agreements. Although the plant design is sensitive to model parameters and various other assumptions, our results demonstrate some of the optimal designs that occur in different scenarios and what one should expect when designing a hybrid wind-solar-storage power plant.

14 SOLAR ENERGY↗

Probabilistic Resilience of DER Systems - A Simulation Assisted Optimization Approach

Energy systems resilience is becoming increasingly important as the frequency of major grid outages increases. In this work, we present a methodology to optimize a behind-tlie-meter distributed energy resource system to sustain a site's critical loads during a pre-defined outage period. With the fixed system design, we then propose an outage simulation approach to estimate the resilience potential of the DER system to sustain loads beyond the fixed outage period - a yearlong resilience performance analysis. We apply statistical analysis to assess the system's resilience performance over a broader parametric problem space on an hourly, monthly, and yearly basis. We demonstrate the impact of the pre-defined outage period on the resilience performance through a case study. Results show that the probability of surviving a random outage of a given duration changes from 20% to 95% when the outage is modeled for a weekday instead of a weekend for the given load-profile.

28 EE - Advanced Manufacturing Office (EE-5A)↗