Search NASA⌕ Search

SEARCH · Search NASA

Results for “PAM antenna”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Programming PAM antennae for efficient CRISPR-Cas9 DNA editing

Bacterial CRISPR-Cas9 nucleases have been repurposed as powerful genome editing tools. Whereas engineering guide RNAs or Cas nucleases have proven to improve the efficiency of CRISPR editing, modulation of protospacer-adjacent motif (PAM), indispensable for CRISPR, has been less explored. Here, we develop a DNA origami–based platform to program a PAM antenna microenvironment and address its performance at the single-molecule level with submolecular resolution. To mimic spatially controlled in vivo PAM distribution as may occur in chromatin, we investigate the effect of PAM antennae surrounding target DNA. We find that PAM antennae effectively sensitize the DNA cleavage by recruiting Cas9 molecules. Super-resolution tracking of single single-guide RNA/Cas9s reveals localized translocation of Cas9 among spatially proximal PAMs. We find that the introduction of the PAM antennae effectively modulates the microenvironment for enhanced target cleavage (up to ~50%). These results provide insight into factors that promote more efficient genome editing.

59 BASIC BIOLOGICAL SCIENCES↗

Conceptual design of the LHCD system on CFETR

With the capability of saving flux consumption in the current ramp up phase, controlling the safety factor (q) profile, providing the required off-axis current drive (CD), a lower hybrid current drive (LHCD) system was eventually determined to be used on the China Fusion Engineering Test Reactor (CFETR). Here, in this paper, a 20 MW/4.6 GHz system composed of 40 units of 500 kW continuous wave (CW) klystron amplifier is preliminarily designed. The feasibility of the frequency choice of 4.6 GHz in the physical aspect is discussed. In order to minimize the transmission loss, a TE01 over-mode of circular waveguide will be used in the transmission system. Although previous calculations indicates that high field side (HFS) launcher location results in waves damping at inner region than low field side (LFS) launcher, which is favorable for plasma stability, HFS launcher will be extremely difficult in engineering due to the limited space. Calculations show that the tritium breeding ratio (TBR) will be decreased by ~ 1.5% with HFS launcher, while it will be decreased by ~ 0.22% only with LFS launcher. As a result, the LH power will be coupled to plasma from the top port at LFS. The designed passive active multi-junction (PAM) launcher is arranged in an array of 5 rows and 8 columns with the height of 1181 mm and the width of 794 mm. A shielding block with a thickness of 20 cm will be equipped around the feeding waveguides to protect the feeding waveguides and to prevent neutron leakage. A preliminary scheme of the remote maintenance for the LFS launcher is given. The modeling results shows that the density for optimum coupling is ~ 1.8 × 10 17 /m 3 , lower than the 4.6 GHz cut-off density n e_co = 2.6 × 10 17 /m 3 . Around this density, the power directivity (D p ) can be high as 71%.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Multiphysics simulations of a steady-state lower hybrid current drive antenna for the FSNF

The Fusion Nuclear Science Facility (FNSF) is a proposed tokamak reactor with the mission to investigate operation of a fusion reactor in a nuclear environment. The high neutron fluence component of the FNSF mission requires steady-state operation for extremely long pulses (t_{pulse} ∼ months) at full power. Plasma sustainment and current drive will be critical components of a successful FNSF. COMSOL Multiphysics software is used for combined radiofrequency (RF) and thermal simulations of the lower hybrid current drive (LHCD) antenna system. These simu- lations consider the resistive RF losses in the antenna including realistic surface roughness and a range of potential materials. The thermal analysis adds volumetric nuclear heating, plasma heat flux on leading edges, and electromagnetic radiation from the plasma to the RF heating calculated by COMSOL. Additional neutronics calculations have been performed to determine the impact of these antenna designs on activated waste disposal for the materials considered. The simulations show that it is technically feasible to implement a fully-active multi-junction (FAM) rather than a passive-active multi-junction (PAM) style of antenna if the septum between adjacent waveguides is sufficiently wide and the thermal conductivity of the structural material is sufficiently high. The FAM has the benefit of higher achievable power density with respect to the PAM, which results in a more compact antenna with potentially lower impact on neutron shielding and tritium breeding. These considerations point to tungsten rather than steel as the preferred structural material in constructing the antenna.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

STS-112 Mission Highlights Resource Tape Part 2 of 3

An overview of the STS-112 Mission is presented. The fourth flight day begins with a view inside of the Destiny Laboratory of the International Space Station where Expedition Five Commander Valery Korzun is shown. The robotics workstation where Mission Specialist Sandra Mangus and Flight Engineer Peggy Whitson operate Canadarm 2 to lift the S(1) Truss segment out of the payload bay of the Space Shuttle Atlantis and maneuver it for installation onto the S(1) Truss is presented. Mission Specialist Piers Sellers is shown preparing for his six and one half hour spacewalk by performing breathing exercises. Animation of the installation of the S(1) Truss, and also the unbirthing of the S(1) truss is also presented. Mission Specialists David Wolf and Piers Sellers are shown getting suited for their spacewalks. During the spacewalk, David Wolf is removing the antenna assembly from its launched position and Piers Sellers is releasing launch restraints from the Radiator Beam Assembly. A beautiful view of the coast of Texas is captured during this spacewalk. Flight day five shows pilot Pam Melroy and Mission Specialist Dave Wolf working inside of the International Space Station's Quest Airlock. Flight day six is shown with Dave Wolf and Piers Sellers exiting their spacesuits inside of the Quest Airlock Module after a successful spacewalk. This presentation ends with views of the International Space Station's installed S(1) Truss, rotation of the radiator assembly and the radiator's coolant tubing.

Source record↗

Photogrammetric Metrology for the James Webb Space Telescope Integrated Science Instrument Module

The James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (approximately 40K). The JWST Observatory architecture includes the Optical Telescope Element and the Integrated Science Instrument Module (ISIM) element that contains four science instruments (SI) including a Guider. The ISM optical metering structure is a roughly 2.2x1.7x2.2m, asymmetric frame that is composed of carbon fiber and resin tubes bonded to invar end fittings and composite gussets and clips. The structure supports the SIs, isolates the SIs from the OTE, and supports thermal and electrical subsystems. The structure is attached to the OTE structure via strut-like kinematic mounts. The ISIM structure must meet its requirements at the approximately 40K cryogenic operating temperature. The SIs are aligned to the structure's coordinate system under ambient, clean room conditions using laser tracker and theodolite metrology. The ISIM structure is thermally cycled for stress relief and in order to measure temperature-induced mechanical, structural changes. These ambient-to-cryogenic changes in the alignment of SI and OTE-related interfaces are an important component in the JWST Observatory alignment plan and must be verified. We report on the planning for and preliminary testing of a cryogenic metrology system for ISIM based on photogrammetry. Photogrammetry is the measurement of the location of custom targets via triangulation using images obtained at a suite of digital camera locations and orientations. We describe metrology system requirements, plans, and ambient photogrammetric measurements of a mock-up of the ISIM structure to design targeting and obtain resolution estimates. We compare these measurements with those taken from a well known ambient metrology system, namely, the Leica laser tracker system. We also describe the data reduction algorithm planned to interpret cryogenic data from the Flight structure. Photogrammetry was selected from an informal trade study of cryogenic metrology systems because its resolution meets sub-allocations to ISIM alignment requirements and it is a non-contact method that can in principle measure six degrees of freedom changes in target location. In addition, photogrammetry targets can be readily related to targets used for ambient surveys of the structure. By thermally isolating the photogrammetry camera during testing, metrology can be performed in situ during thermal cycling. Photogrammetry also has a small but significant cryogenic heritage in astronomical instrumentation metrology. It was used to validate the displacement/deformation predictions of the reflectors and the feed horns during thermal/vacuum testing (90K) for the Microwave Anisotropy Probe (MAP). It also was used during thermal vacuum testing (100K) to verify shape and component alignment at operational temperature of the High Gain Antenna for New Horizons. With tighter alignment requirements and lower operating temperatures than the aforementioned observatories, ISIM presents new challenges in the development of this metrology system.

Nowak, Maria↗

STS-112/Atlantis/ISS 9A Pre-Launch - Launch On-Orbit - Landing - Crew Egress

The video starts with an introduction of the crew of Space Shuttle Atlantis on STS-112 at their customary pre-flight meal. The crew consists of Commander Jeffrey Ashby, Pilot Pam Melroy, and Mission Specialists David Wolf, Sandra Magnus, Piers Sellers, and Fyodor Yurchikhin. The crew is then shown during suit-up, while exiting the Operations and Checkout Building to board the Astrovan, and during ingress and seating. Launch views include: Beach Tracker, VAB, PAD-B, Tower-1, DLTR-3, Grandstand, Cocoa Beach DOAMS, Playalinda DOAMS, UCS-23, OTV-170, OTV-171, and External Tank Camera. On-orbit footage includes the Atlantis orbiter docking with the ISS (International Space Station). The video shows clips of extravehicluar activities (EVAs), and some of the tasks performed during the mission. Footage included shows the installation of the S1 Truss onto the ISS with the Space Station Remote Manipulator System (Canadarm 2), Canadarm 2 carrying the Ammonia Tank Assembly prior to connection, the checkout of the Thermal Radiator Rotary Joint, the soft docking of an S-Band antenna, and the deployment of the S1 Radiator. An onboard repair of the ISS humidity separator is also shown. Landing views include: VAB, Tower 1, Mid-Field, Runway South End, Runway North End, Tower-2, Cocoa Beach DOAMS, and PPOV. Kennedy Space Center managers greet the crew upon arrival, and Commander Ashby gives a brief speech while standing with his crew members.

Source record↗