Search NASA⌕ Search

SEARCH · Search NASA

Results for “PAM antenna”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

STS-112 Mission Highlights Resource Tape Part 2 of 3

An overview of the STS-112 Mission is presented. The fourth flight day begins with a view inside of the Destiny Laboratory of the International Space Station where Expedition Five Commander Valery Korzun is shown. The robotics workstation where Mission Specialist Sandra Mangus and Flight Engineer Peggy Whitson operate Canadarm 2 to lift the S(1) Truss segment out of the payload bay of the Space Shuttle Atlantis and maneuver it for installation onto the S(1) Truss is presented. Mission Specialist Piers Sellers is shown preparing for his six and one half hour spacewalk by performing breathing exercises. Animation of the installation of the S(1) Truss, and also the unbirthing of the S(1) truss is also presented. Mission Specialists David Wolf and Piers Sellers are shown getting suited for their spacewalks. During the spacewalk, David Wolf is removing the antenna assembly from its launched position and Piers Sellers is releasing launch restraints from the Radiator Beam Assembly. A beautiful view of the coast of Texas is captured during this spacewalk. Flight day five shows pilot Pam Melroy and Mission Specialist Dave Wolf working inside of the International Space Station's Quest Airlock. Flight day six is shown with Dave Wolf and Piers Sellers exiting their spacesuits inside of the Quest Airlock Module after a successful spacewalk. This presentation ends with views of the International Space Station's installed S(1) Truss, rotation of the radiator assembly and the radiator's coolant tubing.

Source record↗

Photogrammetric Metrology for the James Webb Space Telescope Integrated Science Instrument Module

The James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (approximately 40K). The JWST Observatory architecture includes the Optical Telescope Element and the Integrated Science Instrument Module (ISIM) element that contains four science instruments (SI) including a Guider. The ISM optical metering structure is a roughly 2.2x1.7x2.2m, asymmetric frame that is composed of carbon fiber and resin tubes bonded to invar end fittings and composite gussets and clips. The structure supports the SIs, isolates the SIs from the OTE, and supports thermal and electrical subsystems. The structure is attached to the OTE structure via strut-like kinematic mounts. The ISIM structure must meet its requirements at the approximately 40K cryogenic operating temperature. The SIs are aligned to the structure's coordinate system under ambient, clean room conditions using laser tracker and theodolite metrology. The ISIM structure is thermally cycled for stress relief and in order to measure temperature-induced mechanical, structural changes. These ambient-to-cryogenic changes in the alignment of SI and OTE-related interfaces are an important component in the JWST Observatory alignment plan and must be verified. We report on the planning for and preliminary testing of a cryogenic metrology system for ISIM based on photogrammetry. Photogrammetry is the measurement of the location of custom targets via triangulation using images obtained at a suite of digital camera locations and orientations. We describe metrology system requirements, plans, and ambient photogrammetric measurements of a mock-up of the ISIM structure to design targeting and obtain resolution estimates. We compare these measurements with those taken from a well known ambient metrology system, namely, the Leica laser tracker system. We also describe the data reduction algorithm planned to interpret cryogenic data from the Flight structure. Photogrammetry was selected from an informal trade study of cryogenic metrology systems because its resolution meets sub-allocations to ISIM alignment requirements and it is a non-contact method that can in principle measure six degrees of freedom changes in target location. In addition, photogrammetry targets can be readily related to targets used for ambient surveys of the structure. By thermally isolating the photogrammetry camera during testing, metrology can be performed in situ during thermal cycling. Photogrammetry also has a small but significant cryogenic heritage in astronomical instrumentation metrology. It was used to validate the displacement/deformation predictions of the reflectors and the feed horns during thermal/vacuum testing (90K) for the Microwave Anisotropy Probe (MAP). It also was used during thermal vacuum testing (100K) to verify shape and component alignment at operational temperature of the High Gain Antenna for New Horizons. With tighter alignment requirements and lower operating temperatures than the aforementioned observatories, ISIM presents new challenges in the development of this metrology system.

Nowak, Maria↗

STS-112/Atlantis/ISS 9A Pre-Launch - Launch On-Orbit - Landing - Crew Egress

The video starts with an introduction of the crew of Space Shuttle Atlantis on STS-112 at their customary pre-flight meal. The crew consists of Commander Jeffrey Ashby, Pilot Pam Melroy, and Mission Specialists David Wolf, Sandra Magnus, Piers Sellers, and Fyodor Yurchikhin. The crew is then shown during suit-up, while exiting the Operations and Checkout Building to board the Astrovan, and during ingress and seating. Launch views include: Beach Tracker, VAB, PAD-B, Tower-1, DLTR-3, Grandstand, Cocoa Beach DOAMS, Playalinda DOAMS, UCS-23, OTV-170, OTV-171, and External Tank Camera. On-orbit footage includes the Atlantis orbiter docking with the ISS (International Space Station). The video shows clips of extravehicluar activities (EVAs), and some of the tasks performed during the mission. Footage included shows the installation of the S1 Truss onto the ISS with the Space Station Remote Manipulator System (Canadarm 2), Canadarm 2 carrying the Ammonia Tank Assembly prior to connection, the checkout of the Thermal Radiator Rotary Joint, the soft docking of an S-Band antenna, and the deployment of the S1 Radiator. An onboard repair of the ISS humidity separator is also shown. Landing views include: VAB, Tower 1, Mid-Field, Runway South End, Runway North End, Tower-2, Cocoa Beach DOAMS, and PPOV. Kennedy Space Center managers greet the crew upon arrival, and Commander Ashby gives a brief speech while standing with his crew members.

Source record↗