Interpretation and application of the hydro-abrasive erosion model from IEC 62364 (2013) for Pelton turbines
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.
Pleasant Grove City owns and operates a drinking water system that included pressure reducing stations (PRVs) in various locations and flow conditions. Several of these station are suitable for power generation. The City evaluated their system to identify opportunities for power generation that can be implemented based on the analysis of costs and prediction of power generation and associated revenue. The evaluation led to the selection of the Battle Creek site for development of a hydro-electric power generating system. The Battle Creek site includes a pipeline that carries spring water to storage tanks. The system utilizes a PRV to reduce pressure before the water is introduced into the tanks. The evaluation recommended that the PRV at this location be replaced with a turbine for the generation of electricity. The system will be connected to the utility power grid for use in the community. A pelton turbine was selected for the site, and a turbine building and piping system were constructed to complete a fully functional power generation system. It is anticipated that the system will generate approximately 440,000 kW-hr per year resulting in $40,000 of annual revenue.
Puget Sound Energy (PSE) is a utility with headquarters in Bellevue, WA that provides electric and gas service to customers in many regions of western Washington State. PSE is undertaking the implementation of a battery energy storage system pilot project in Glacier, WA, a small town located in the North Cascade Mountains near Mt. Baker Ski Area. Glacier experiences power outages that are both somewhat frequent and lengthy (roughly 2.8 outages per year with a duration of 7.5 hours average). The primary cause of the outages is faults on a long 55 kV transmission line that serves the town of Glacier from the Kendall substation. This approximately 10-mile long line is shown in the upper left of Figure 1 below. The Kendall-Glacier transmission line extends through an area of heavy forest with few reasonable options for increasing the line’s reliability. The substation in Glacier (also shown on figure below) serves over 1000 customers that are mostly residential but includes over 50 small businesses. The town has approximately 250 year-round residents, and a peak in visitors during the winter ski season when storms are also more likely to cause power outages. Figure 1: Proposed Microgrid in Glacier, WA Given the reliability challenges in Glacier, PSE is assessing the feasibility of a 2MW/4.4MWh battery energy storage system (BESS) that would allow for improved reliability. The BESS would also allow for the ability to investigate other applications for utility-scale energy 5 storage. This energy storage system is being considered for operation in “planned islanding” and “microgrid” mode. “Planned islanding” indicates use of the BESS to provide power to part or potentially all of the load in the town of Glacier during an outage. “Microgrid” indicates utilization (during an outage) of the BESS in parallel with Nooksack Falls Hydroelectric Power Plant, a small (nameplate 1.5 MW/2000 HP) hydro power plant less than 10 miles from the town of Glacier. Nooksack is a run-of river small hydro generation plant with a gross head of 226 ft. The site has a 5-foot diameter penstock which enters the powerhouse and goes into a pelton turbine with six runners on one shaft. It was originally constructed by Stone & Webster in 1906, which makes it the second oldest operating power generation facility in Western Washington. It was placed on the National Register of Historic places in December of 1988. The plant operated until 1997 when a fire destroyed the generator. The project continued operations in 2003 after the replacement of the generator and other updates.
Energy storage is essential for cost-effective integration of variable renewable energy sources to support a low-carbon grid. It is also a key enabler of a modern grid infrastructure for demand management. However, several main challenges remain for different kind of energy storage technologies in grid scale deployment. Currently, the largest source of utility-scale storage and long-duration storage in the US is pumped storage hydropower (PSH). Prospect of growth in conventional PSH faces challenges that have limited its deployment over the last three decades, including high capital costs and long deployment timelines. Batteries have high energy densities and are the primary technology of choice for small-scale energy storage. Compressed air energy storage (CAES) is another large-scale energy storage technology, but there are few plants deployed worldwide. They suffer from their low round trip efficiency (RTE) due to the use of high-pressure air compressors. To address some of the challenges associated with these various storage technologies, the Ground-Level Integrated Diverse Energy Storage (GLIDES) is a modular PSH technology that was invented in 2015 at Oak Ridge National Laboratory. It utilizes gas compression to store electric energy. GLIDES stores energy by compressing gas using a liquid piston in high-pressure vessels. In doing so the vessels act as the upper reservoir in conventional PSH. Initially, the vessels are filled with gas to a prescribed pressure. To store energy, GLIDES uses a hydraulic piston pump to pump water into the pressurized vessels. As the water volume increases inside the vessels, water acts as a hydraulic piston compressing the gas on top of it. This process can be thought of as pumping water from the lower reservoir to the higher reservoir in PSH, increasing the water head. To dispatch the stored energy, the high-head water in the vessel is discharge through a high head Pelton hydraulic turbine that is connected to an electric generator. Employing high-pressure vessels enables GLIDES to reach water heads ~10-80 times higher than conventional PSH, achieving ~40 times higher energy densities, and overcomes the geographic limitation of conventional PSH. Although its energy density is much lower than that of batteries, GLIDES holds the potential advantages of having long service life, ease of system integration and being less hazardous over batteries. GLIDES prospective scalability could make it suitable for wide range of applications from behind the meter storage in buildings to grid-scale storage. It also makes it suitable for installations in densely populated urban areas where energy storage is most needed and real estate is limited. Over the last 5 years, work has focused on increasing GLIDES’ energy density, decreasing its initial capital cost of the system, and increasing its revenue potential. Several designs were developed and prototyped to verify and demonstrate the improvement in energy density. The latest prototype achieved energy density of 1.21 kWh/m 3 . Our analysis showed that it could achieve up to 1.7 kWh/m 3 with a mixture of air and carbon dioxide as the gas being compressed.
The research shown in this video features the GLIDES (Ground-Level Integrated Diverse Energy Storage) project, which has been under development at Oak Ridge National Laboratory (ORNL) since 2013. GLIDES can store energy via combined inputs of electricity and heat, and deliver dispatchable electricity. Supported by ORNL’s Laboratory Director’s Research and Development (LDRD) fund, this energy storage system is low-cost, and hybridizes compressed air and pumped-hydro approaches to allow for storage of intermittent renewable energy at high efficiency. A U.S. patent application for this novel energy storage concept has been submitted, and research findings suggest it has the potential to be a flexible, low-cost, scalable, high-efficiency option for energy storage, especially useful in residential and commercial buildings.
Supercritical carbon dioxide systems are the focus of significant recent research efforts and promise compact, high-efficiency architecture for gas turbine waste heat recovery for pipeline gas turbines. The waste heat recovery system improves operating efficiency by converting waste heat to additional electric power, which increases overall system efficiency by 35% at the design point, and also significantly improves part-load performance. This paper describes the system design and component selection for a 5.7 MWe waste heat recovery system based on an integrally-geared compressor-expander architecture, including the thermodynamic cycle development, system architecture and component trade studies, and final selection. Validation test results for critical first-of-a-kind compressor and turbine component technologies are also presented, demonstrating full-pressure performance and progress towards commercialization.
This paper presents the selection of a system configuration and off-design control method for an integrally geared compander based on cycle modeling and optimization. The goal of the cycle modeling was to determine a cycle configuration that would reach an efficiency of 50% at design conditions and to optimize off-design control to maintain high efficiencies. The compander is being developed for use in a concentrated solar power supercritical carbon dioxide power plant with expected turbine inlet temperatures of 705°C and utilizing dry cooling leading to compressor inlet temperature varying between 35°C and 55°C. The compander is unique as it consists of eight turbomachinery stages on four pinions all being driven by a single bull gear. The separate stages offer the opportunity to consider a variety of flow splits and cycle configurations including intercooling and multiple stages of reheat. Cycle modeling was conducted in two stages: on-design and off-design. On-design modeling was simulated with all components operating at their design point. This was used to compare the performance of different cycle configurations and design temperatures. Off-design modeling was then performed to investigate the temperature dependence of the cycle efficiency and power output and to develop a control strategy. Strategies considered and discussed include: turbine bypass, compressor recycle, inlet guide vanes, and inventory control. To determine the best operating conditions for each configuration and control strategy, a genetic algorithm was implemented to optimize the cycle performance across the range of operating temperatures being considered. The final selection of cycle configuration, design temperature and control strategy is also presented.
An integrally geared compressor-expander (compander) for supercritical CO2 (sCO2) was developed to convert thermal energy to electricity. With operating pressures of 275 bar, this turbomachine represents the state of the art in integrally geared machine architecture, hitting compressor inlet densities of 600 kg/m3 and discharge pressures of 275 bar. The product development was funded by the Department of Energy’s Energy Efficiency and Renewable Energy Office under EE0007114 to advance the state of the art in concentrated solar power applications; however, the technology itself is agnostic to heat source, and is predicted to achieve a thermal-to-electric conversion efficiency of 50% for any indirect heat source capable of providing turbine inlet temperatures of 700°C or greater. While the program encompassed the design and testing for the compressor and turbine elements, this paper will focus on the compressor design and operation. The paper will begin with an introduction to the cycle design and analysis of an indirectly heated integrally geared sCO2 compander, a discussion of the mechanical and aerodynamic design of the compressor that is a two stage radial compressor operating subcritically at 27,512 rpm, and will then proceed to describe the test facility and measured data to characterize the performance and robustness of the machine. The paper will conclude with a discussion on lessons learned throughout the course of commissioning and testing. Practical aspects of testing a compressor operating near the dome including complications relating to obtaining an accurate compressor flow map, efficiency calculations, flow unsteadiness, and associated measurement uncertainties will be discussed.
This paper has presented the cycle design and optimization details for a sCO2-based WHRS targeting the Solar Turbines Titan 130. The PreheatSR cycle layout was chosen to effectively address the issue of acid dew point corrosion and ensure high system performance is not significantly impacted by use of alternative fuels. The optimization process discussed uses a multi-objective optimization to discover a series of optimal cycle configurations given ambient temperature variability for a chosen site location while considering the initial capital cost of the cycle components. Cycle models built that incorporated off-design methods for the heat exchangers and turbomachinery allowed for the investigation of cycle operation that maximizes power output for individual cycle conditions. The resulting Pareto front serves as a guide for how to configure the WHRS cycle for the highest yearly energy extracted for a given investment.