At least 19 records

Historic Context, Character-Defining Elements, And Photographic Record For A 26.45-Mile Segment Of The 138-Kilovolt Power Transmission System, Areas 3, 5, 6, And 23, Nevada National Security Site, Nye County, Nevada

The subject of this report is the 138-kilovolt (kV) power transmission line on the Nevada National Security Site (NNSS) (see Figure 1). The NNSS, formerly the Nevada Test Site (NTS), was the main continental nuclear test site for the United States between 1951 and 1992. Known as the battleground of the Cold War, the NNSS hosted a total of 928 nuclear tests during that period. It also served as the location of numerous scientific advancements in the fields of rocketry, big-hole drilling, nuclear waste management, and defense. From its construction in the 1960s through the present day, the 138 kV line has provided electrical power to the numerous buildings, facilities, experiments, and tests on the NNSS. The Department of Energy (DOE), in consultation with the Nevada State Historic Preservation Officer (SHPO), has determined that it may contribute to the character and significance of the Mercury Historic District (MHD) on the NNSS, as well as other historic districts that have not been recorded or evaluated yet. The purpose of this report is to fulfill two of the stipulations in the Memorandum of Agreement DEGM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site (MOA). The MOA was executed as part of the DOE’s obligations under Section 106 of the National Historic Preservation Act (NHPA) to mitigate the adverse effects of two undertakings on historic properties. In particular, this report fulfills MOA Stipulations III.C.1-3, which state that the Department of Energy (DOE) will prepare the following: A historic context for the 138 kV transmission line and identification of the line’s characterdefining elements; High-quality digital images of the 26.45-mile segment of the 138 kV transmission line that is subject to the two undertakings for which the MOA was executed; and Photograph catalogs and map keys showing photograph viewpoints and directions.

54 ENVIRONMENTAL SCIENCES↗

Opening the Plutonium-Beryllium Neutron Sealed-Source RGMA1002-113

The radiograph of the PuBe neutron sealed-source was useful in determining dimensions and identifying construction details. This information gives the engineer and machinist a better idea of where to breach the outer container. It would be advantageous to use a higher energy radiography system to provide information about inner container dimensions, construction details, and nuclear material location to facilitate disassembly. Characterization of the inner and outer container materials would be useful for selecting proper cutting inserts to provide more efficient and cleaner cuts. A real-time, in-line method for qualitatively identifying metal compositions such as handheld x-ray fluorescent (XRF) may prove sufficient. The disassembly of PuBe sealed-sources generally involves numerous attempts to pry a lid or plug from the innermost container. The forces involved make it impractical to hold the source so this attempt must take place with the container held horizontally in the collet. The horizontal orientation risks the flow of PuBe materials out of the container when the plug is freed as occurred in this disassembly. To mitigate this risk, it was agreed that a small vise should be introduced into the glovebox to hold the container firmly in a vertical orientation for attempts to pry off lids or plugs. The vise should hold cylindrical containers firmly without inflicting scratches or gouges into sealed-source metal surfaces. Documentation of PuBe neutron sealed-source disassembly is effectively recorded with a series of professional photographs as presented in this report. Unfortunately, the prevalence of metal surfaces and materials combined with uneven, low light conditions reduce the contrast between disassembled parts and background. To improve the photographic record of disassembly, colored liner materials should be identified and introduced as a staged background for PuBe component pictures.

07 ISOTOPE AND RADIATION SOURCES↗

Hygroscopicity Evaluation of Halide Scintillators

A collaborative study of relative hygroscopicity of anhydrous halide scintillators grown at various laboratories is presented. We have developed a technique to evaluate moisture sensitivity of both raw materials and grown crystals, in which the moisture absorption rate is measured using a gravimetric analysis. Degradation of the scintillation performance was investigated by recording gamma-ray spectra and monitoring the photopeak position, count rate and energy resolution. The accompanying physical degradation of the samples exposed to ambient atmosphere was photographically recorded as well. The results were compared with ben

Zhuravleva, M↗

Effect of configuration and dimensions of reactor electrodes on electrical and optical corona discharge characteristics

An experimental parametric study is made to investigate how the electrical corona discharge characteristics are influenced by the geometrical configuration and dimensions of the reactor and the electrode polarity of the applied voltage. Furthermore, features of the corona discharge plasma formed around the stressed electrode in some different gases are recorded photographically to provide more information on the physical mechanisms of the corona discharge in the investigated gases. The obtained results have been discussed in the light of gas discharge physics and its applications.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Simulation of femtosecond interferometry when studying the effect of intense laser irradiation of a transparent medium

A method for comparing experimental and simulation results obtained when transmitting a femtosecond laser pulse through a material is proposed. This method is based on computer reproduction of photographs recorded using femtosecond interferometry. A numerical analysis of the spatial and temporal evolution of an intense (∼10{sup 13} W cm{sup −2}) pulse propagating in the bulk of yttrium aluminium garnet is presented. (paper)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

CHESS 2025: Orthorectified airborne RGB imagery from NEON AOP surveys

This dataset provides Level 1 (L1) and Level 3 (L3) orthorectified Red-Green-Blue (RGB) imagery collected for the 2025 Colorado Headwaters Ecological Spectroscopy Study (CHESS). This high-resolution imagery is a photographic record of red, green, and blue visible light from sunlight reflected off of the Earth’s surface. The data comprise full-color images of the ground surface and are primarily intended to provide context to imaging spectroscopy and light detection and ranging (LiDAR) data. The data were acquired over three study domains in the Upper Gunnison river basin: the upper East River watershed (CRBU); Almont Triangle and Taylor Canyon (ALMO); and Upper Taylor River watershed (UPTA) between 2025-06-13 and 2025-07-15. RGB images were acquired using the PhaseOne IXM-RS150F high-resolution digital camera onboard the National Ecological Observatory Network (NEON) Airborne Observation Platform (AOP). The package data include both an L1 product comprising one camera frame per file and an L3 mosaic aligned to the Universal Transverse Mercator (UTM) Zone 13N grid and the World Geodetic System (WGS) 84 projection. Both products are provided in geotif (.tif) format at 0.1 m ground resolution. The bulk of the imagery was collected during the main CHESS field campaign from June 13 to July 15, 2025. Additional images of a portion of the Upper Taylor (UPTA) domain were collected on September 18, 2025, to fill gaps in imagery identified after the main campaign was complete. RGB camera imagery is not radiometrically calibrated, and therefore pixel values should not be exploited for scientific analysis. Pixel values have undergone a manual adjustment to enhance feature identification. The imagery is rigorously geolocated which does allow for reliable geometric information to be retrieved. To generate the orthorectified imagery, the NEON AOP camera captured visible spectrum in red, green, and blue bands. The raw images were then processed using NEON’s camera orthorectification workflow. A boresight calibration flight was made to build a complete camera, distortion, and alignment model. Color balance/white balance and exposure correction were applied to the raw RGB images. The corrected images were orthorectified by ray-tracing image pixels to a lidar-derived digital surface model (DSM) mesh using the refined camera model, outputting orthorectified raster pixels on a regular grid. Flightline-level data were mosaicked by selecting per-pixel contributions from overlapping orthorectified images using line-of-sight (LOS) zenith angle minimization to reduce edge distortions. CHESS Project Description: The Colorado Headwaters Ecological Spectroscopy Study (CHESS) comprised a multi-week airborne remote sensing and field observation campaign in the Upper Gunnison Basin, Colorado, conducted in June and July of 2025. Airborne remote sensing was conducted by the National Ecological Observatory Network Airborne Observation Platform (NEON AOP), concurrent with a field campaign run by the Rocky Mountain Biological Laboratory (RMBL), the Lawrence Berkeley National Laboratory (LBNL) and SLAC National Accelerator Laboratory Watershed Function Science Focus Area (SFA), and NASA-JPL (Jet Propulsion Laboratory) Earth Surface Mineral Dust Source Investigation (EMIT) program. Between June 10 and July 18, 2025, the NEON AOP flight team collected high-resolution aerial imaging spectroscopy and Light Detection and Ranging (LiDAR) data over three domains: the Upper East River (CRBU), Almont Triangle (ALMO), and the Upper Taylor Basin (UPTA). In coordination with the flights, a field campaign acquired ground-truth observations, including observations of vegetation composition, foliar traits, forest demography, and subsurface properties in 18 core sampling areas within the domains. Additional surface water observations were taken at over 380 point locations. All CHESS campaign datasets can be found within the CHESS ESS-DIVE data portal: https://data.ess-dive.lbl.gov/portals/chess. Funding Acknowledgement: Field and remote-sensing data acquisition was performed under a grant from the National Aeronautics and Space Administration (80NSSC24K1005). This work was also supported by the Watershed Function Science Focus Area at Lawrence Berkeley National Laboratory funded by the US Department of Energy, Office of Science, Biological and Environmental Research under Contract No. DE-AC02-05CH11231.

2018 NEON and 2025 CHESS Campaigns↗

A section 110 evaluation of the huron king test chamber, area 3, nevada national security site, nye county, nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office tasked Desert Research Institute (DRI) with the identification and evaluation of the Huron King Test Chamber as part of their cultural resources program obligations under Section 110 of the National Historic Preservation Act. The Huron King nuclear test was a vertical line-of-sight weapons effects test that took place in Area 3 on June 24, 1980. Unique to this event was a specially designed aboveground test chamber that held a model defense communications satellite in a vacuum tank meant to replicate the space environment. Sponsored by the Defense Nuclear Agency, the purpose of the experiment was to understand the response of the satellite and its materials and equipment to an electromagnetic pulse and attendant radiation. Between July and August 2022, DRI conducted an archival review on the Huron King experiment and its associated test chamber. Subsequently, pedestrian fieldwork was undertaken at the Huron King Test Chamber by DRI on September 29, 2022. During fieldwork, the outside of the test chamber was documented using a Nevada State Historic Preservation Office Architectural Resource Assessment form. This effort included verifying the substructures that compose the test chamber as determined by the archival review, as well as obtaining a detailed photographic recordation of the exterior and assessing its current condition. Notably, the site where the Huron King test took place has been abandoned and almost entirely naturalized. All of the portable instrumentation trailers, communications and data cabling, and winch systems used to retract the test chamber following the detonation were removed after completion of the experiment in 1980. Only the subsidence crater and the test chamber remain as physical evidence of this experiment. Based on these findings, DRI recommends that the Huron King Test Chamber is eligible for listing in the National Register of Historic Places (NRHP) at the local level under Significance Criteria A and C and that it meets Criteria Consideration G for properties less than 50 years old.

54 ENVIRONMENTAL SCIENCES↗

BXS Re-calibration

Early in the commissioning it was noticed by Cecile Limborg that the calibration of the BXS spectrometer magnet seemed to be different from the strength of the BX01/BX02 magnets. First the BX01/BX02 currents were adjusted to 135 MeV and the beam energy was adjusted to make the horizontal orbit flat. Then BX01/BX02 magnets were switched off and BXS was adjusted to make the horizontal orbit in the spectrometer line flat, without changing the energy of the beam. The result was that about 140-141 MeV were required on the BXS magnet. This measurement was repeated several times by others with the same results. It was not clear what was causing the error: magnet strength or layout. A position error of about 19 mm of the BXS magnet could explain the difference. Because there was a significant misalignment of the vacuum chamber in the BXS line, the alignment of the whole spectrometer line was checked. The vacuum chamber was corrected, but the magnets were found to be in the proper alignment. So we were left with one (or conceivably two) magnet calibration errors. Because BXS is a wedged shaped magnet, the bend angle depends on the horizontal position of the incoming beam. As mentioned, an offset of the beam position of 19 mm would increase or decrease the bend angle roughly by the ratio of 135/141. The figure of 19 mm is special and caused a considerable confusion during the design and measurement of the BXS magnet. This is best illustrated in Figure 1 which was taken out of the BXS Traveler document. The distance between the horizontal midplanes of the poles and the apex of the beam path was chosen to be 19 mm so the beam is close to the good field region throughout its entire path. Thus it seemed possible that there was an error that resulted in the beam not being on this trajectory, or conversely, that the magnetic measurements were done on the wrong trajectory and the magnet was then mis-calibrated. Mechanical measurements of the vacuum chamber made in the tunnel indicated that the vacuum chamber was in fact in the proper position with respect to the magnet - not 19 mm off to one side - so the former possibility was discounted. Review of the Fiducial Report and an interview with Keith Caban convinced me that there was no error in the coordinate system used for magnet measurements. I went and interviewed Andrew Fischer who did the magnetic measurements of BXS. He had extensive records, including photographs of the setups and could quickly answer quite detailed questions about how the measurement was done. Before the interview, I had a suspicion there might have been a sign flip in the x coordinate which because of the wedge would result in the wrong path length and a miscalibration. Andrew was able to pin-point how this could have happened and later confirmed it by looking an measurement data from the BXG magnet done just after BXS and comparing photographs. It turned out that the sign of the horizontal stage travel that drives the measurement wire was opposite that of the x coordinate in the Traveler, and the sign difference wasn't applied to the data. The origin x = 0 was set up correctly, but the wire moved in the opposite direction to what was expected, just as if the arc had been flipped over about the origin. To quantitatively confirm that this was the cause of the observed difference in calibration I used the 'grid data', which was taken with a Hall probe on the BXS magnet originally to measure the FINT (focusing effect) term, and combined it with the Hall probe data taken on the flipped trajectory, and performed the field integral on a path that should give the same result as the design path. This is best illustrated in Figure 2. The integration path is coincident with the desired path from the pivot points (x = 0) outward. Between the pivot points the integration path is a mirror image of the design path, but because the magnet is fairly uniform, for this portion it gives the same result. Most of the calibration error resulted simply from the different path length between the design path and the measured path. The results of the integration on the equivalent path are given in Table 1. The corrected calibration has been used to generate a new polynomial for BXS which was implemented in the control system.

43 PARTICLE ACCELERATORS↗

On the fine structure splitting of the 3p{sup 4}3d {sup 4}D{sub 5/2} and 3p{sup 4}3d {sup 4}D{sub 7/2} levels of Fe x

We study UV spectra obtained with the SO82-B slit spectrograph on board SKYLAB to estimate the fine structure (FS) splitting of the Cl-like 3p{sup 4}3d{sup 4}D{sub 5/2} and 3p{sup 4}3d{sup 4}D{sub 7/2} levels of Fe x. The splitting is of interest because the Zeeman effect mixes these levels, producing a “magnetically induced transition” (MIT) from 3p{sup 4}3d{sup 4}D{sub 7/2} to 3p{sup 52}P{sub 3/2}{sup o} for modest magnetic field strengths characteristic of the active solar corona. We estimate the splitting using the Ritz combination formula applied to two lines in the UV region of the spectrum close to 1603.2 Å, which decay from the level 3p{sup 4}({sup 1}D)3d{sup 2}G{sub 7/2} to these two lower levels. The MIT and accompanying spin-forbidden transition lie near 257 Å. By careful inspection of a deep exposure obtained with the S082B instrument, we derive a splitting of ≲7±3 cm{sup −1}. The upper limit arises because of a degeneracy between the effects of non-thermal line broadening and FS splitting for small values of the latter parameter. Although the data were recorded on photographic film, we solved for optimal values of line width and splitting of 8.3 ± 0.9 and 3.6 ± 2.7 cm{sup −1}.

79 ASTRONOMY AND ASTROPHYSICS↗

SPRUCE S1 Bog and SPRUCE Experiment Aerial Photographs

This data set provides a record of the aerial photographs taken of the S1-Bog on the Marcell Experimental Forest and the SPRUCE experimental site within the S1-Bog. New 2019-2020 photos collected from UAV have been added.

54 ENVIRONMENTAL SCIENCES↗

Radiometric characterization process for locating radioactivity hold-up and measuring non-uniformly distributed sources - 15342

A novel approach to facility radiometric characterization for non-uniformly distributed radiation sources has been developed by ANTECH and is currently being employed at the Argonne National Laboratory. It is being applied to the measurement of a wide range of objects and the interiors and contents of laboratories and buildings. The integrated non destructive assay measurement process involves the use of a scanning spectroscopic gamma ray camera as well as high purity Germanium detectors with different collimators and hence differing detector fields of view to measure and quantify non-uniformly distributed sources of radioactivity in laboratory equipment, glove boxes, storage tanks, pipework and general laboratory objects and process components. The purpose of the radiometric characterization is to quantify radiation sources and radioactive contamination levels in facilities containing nuclear material and to ensure compliance with facility characterization requirements and for decontamination and decommissioning planning and execution. The integrated measurement process also involves automated data capture and processing software and a database with which both measurement instrument operators and subject matter expert analysts can interact. An appropriate measuring instrument (gamma camera, scintillation detector, high purity Germanium detector system, neutron detector or alpha-beta counter) records the measurement data and the measurement site is recorded in a photograph. All of the data relevant to the measurement (or set of measurements for a particular object) are recorded in the database including measured gamma ray spectra, equipment description and relevant calibration, measurement site photograph and measurement descriptive data. Once data analysis protocols are established for specific geometries and measurement situations they can be applied to the measured data in a partially automated manner, reducing analysis and transcription errors. In addition to measurements and data analysis the process also utilises radiometric modelling computer codes including MicroShield and Monte Carlo Neutrons Photons in order to perform model calculations where appropriate. In a typical measurement, the ANTECH RadSearch spectroscopic gamma camera is utilized to find areas of concentrated activity so that these areas can be measured and calculated separately from areas with diffuse contamination. The use of the gamma camera in scanning mode helps to ensure that the assay does not overestimate the detected radiation source, which is a frequent consequence of using standard far field geometry and attenuation analysis codes that assume uniformity of both density and radioactive source distribution. Once the hot spots are identified, high purity Germanium detector measurements are made using various collimators with wide or narrow fields of view as required. These measurements are then processed through a semi-automatic calculation process assuming an appropriate source configuration as identified by RadSearch. These source configurations include point sources, line sources or surface sources. The Generalized Geometry Hold-up algorithms are employed to determine an estimate of the activity of the various sources that are identified in a measurement. The ANTECH integrated measurement process provides an automated calculation procedure where the analyst can select the source type, geometry and appropriate input data, and then the software calculates the activity by radionuclide for all sources identified in the measurement. The measurement and analysis process is controlled under the ANTECH ISO9001: 2008 Quality Assurance System and managed by a site specific Quality Assurance Plan. Both Argonne National Laboratory and Department of Energy technical reviewers have vetted the Integrated Measurement and Analysis Process. The application of the measurement and analysis process is described and measurement examples are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The role of historical operations information for supporting remedial investigation work at the former Harshaw Chemical Site - 8279.

In the early stages of hazardous, toxic, and radioactive waste (HTRW) site investigations, basic record searches are performed to help direct the agencies investigating contaminated sites to areas of concern and to identify contaminants of interest (COI). Plans developed on the basis of this preliminary research alone are often incomplete and result in unexpected discoveries either while in the field investigating the site or after the reports have been written. Many of the sites investigated under the Formerly Utilized Sites Remedial Action program (FUSRAP) have complex histories that are slowly uncovered over the life of the project. Because of programmatic constraints, nuances of these sites are often discovered late in their programs and result in increased expenditures in order to fully characterize the site, perform a robust feasibility study, and recommend appropriate alternatives for remediation. By identifying resources for public records, classified records, historic aerial photographs, and other sources of site-specific historical information, a process can be established to optimize the collection of information and to develop efficient and complete project plans. In many cases, interviews with past site employees are very useful tools. In combining what is found in the records, observed on historic aerial photographs, and heard from former employees and family members, teams investigating these sites can begin to compile sound and more complete conceptual site models (CSMs). The former Harshaw Chemical Site (HCS) illustrates this discovery process. HCS is part of FUSRAP. Preliminary investigations by the US Department of Energy (DOE) in the 1970s provided an initial CSM of activities that had taken place that may have resulted in contamination. The remedial investigation (RI) conducted by the US Army Corps of Engineers (USACE) was designed around this CSM. The RI work, however, identified a number of site conditions that were unexpected, including new potential COI associated with recycled uranium and contaminant locations that were inconsistent with the original CSM. As part of an RI Addendum effort, the USACE reconsidered its understanding of HCS historical activities. This effort included an intensive review of available historical aerial photography, an in-depth Potentially Responsible Parties (PRP) investigation, additional analysis of the production processes in place at HCS, and targeted supplemental data collection. The result of this effort was a revised CSM that included a number of previously unidentified potential COI and a much clearer understanding of the processes and resulting waste streams potentially associated with environmental contamination. Because of their complex and often poorly documented operational histories, unexpected discoveries will always be a part of investigating sites such as HCS. Taking advantage of available resources and expending funds for thorough historical research early in the life of a project will help to reduce the chances for expensive field remobilizations and significant schedule delays. A complete and accurate site history also allows for more efficient long-term technical and budgetary planning, thus eliminating many obstacles associated with the ultimate disposition of HTRW sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Role of Historical Operations Information for Supporting Remedial Investigation Work at the Former Harshaw Chemical Site

In the early stages of hazardous, toxic, and radioactive waste (HTRW) site investigations, basic record searches are performed to help direct the agencies investigating contaminated sites to areas of concern and to identify contaminants of interest (COI). Plans developed on the basis of this preliminary research alone are often incomplete and result in unexpected discoveries either while in the field investigating the site or after the reports have been written. Many of the sites investigated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) have complex histories that are slowly uncovered over the life of the project. Because of programmatic constraints, nuances of these sites are often discovered late in their programs and result in increased expenditures in order to fully characterize the site, perform a robust feasibility study, and recommend appropriate alternatives for remediation. By identifying resources for public records, classified records, historic aerial photographs, and other sources of site-specific historical information, a process can be established to optimize the collection of information and to develop efficient and complete project plans. In many cases, interviews with past site employees are very useful tools. In combining what is found in the records, observed on historic aerial photographs, and heard from former employees and family members, teams investigating these sites can begin to compile sound and more complete conceptual site models (CSM(s). The former Harshaw Chemical Site (HCS) illustrates this discovery process. HCS is part of FUSRAP. Preliminary investigations by the U.S. Department of Energy (DOE) in the 1970's provided an initial CSM of activities that had taken place that may have resulted in contamination. The remedial investigation (RI) conducted by the U.S. Army Corps of Engineers (USACE) was designed around this CSM. The RI work, however, identified a number of site conditions that were unexpected, including new potential COI associated with recycled uranium and contaminant locations that were inconsistent with the original CSM. As part of an RI Addendum effort, the USACE reconsidered its understanding of HCS historical activities. This effort included an intensive review of available historical aerial photography, an in-depth Potentially Responsible Parties (PRP) investigation, additional analysis of the production processes in place at HCS, and targeted supplemental data collection. The result of this effort was a revised CSM that included a number of previously unidentified potential COI and a much clearer understanding of the processes and resulting waste streams potentially associated with environmental contamination. Because of their complex and often poorly documented operational histories, unexpected discoveries will always be a part of investigating sites such as HCS. Taking advantage of available resources and expending funds for thorough historical research early in the life of a project will help to reduce the chances for expensive field re-mobilizations and significant schedule delays. A complete and accurate site history also allows for more efficient long-term technical and budgetary planning, thus eliminating many obstacles associated with the ultimate disposition of HTRW sites. (authors)

54 ENVIRONMENTAL SCIENCES↗

Optical observation of shock waves and cavitation bubbles in high intensity laser-induced shock processes

We report an experimental study of the temporal and spatial dynamics of shock waves, cavitation bubbles, and sound waves generated in water during laser shock processing by single Nd:YAG laser pulses of nanosecond duration. A fast ICCD camera (2 ns gate time) was employed to record false schlieren photographs, schlieren photographs, and Mach-Zehnder interferograms of the zone surrounding the laser spot site on the target, an aluminum alloy sample. We recorded hemispherical shock fronts, cylindrical shock fronts, plane shock fronts, cavitation bubbles, and phase disturbance tracks.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Post-Closure Inspection Report for Corrective Action Unit 90: Area 2 Bitcutter Containment, Nevada Test Site, Nevada

Corrective Action Unit (CAU) 90, Area 2 Bitcutter Containment, is identified in the Federal Facility Agreement and Consent Order of 1996, as amended February 2008. The post-closure requirements for CAU 90 are described in Section VII.B.8.b of the Nevada Test Site Resource Conservation and Recovery Act Permit for a Hazardous Waste Management Facility Number NEV HW0021, dated November 2005. Post-closure activities consist of the following: (1) Semiannual inspections of the site using inspection checklists; (2) Photographic documentation; (3) Field note documentation; and (4) Preparation and submittal of an annual Post-Closure Inspection Report. This annual report covers the period of July 2007 to June 2008 and consists of a summary of the results of the inspections, copies of the inspection checklists and field notes, maintenance and repair records (if any), photographs, and conclusions and recommendations. The inspection checklists are provided in Appendix A, a copy of the field notes is provided in Appendix B, and copies of photographs taken during the inspections are provided in Appendix C.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mutual Diffusion Coefficients and Refractive Index Increments of K 2 SO 4 (aq) at 298.15 K from Rayleigh Interferometry

Here, isothermal mutual diffusion coefficients (interdiffusion coefficients) were measured for K 2 SO 4 (aq) at 298.15 ± 0.005 K, at numerous concentrations ranging from dilute solutions to near saturation (0.59648 mol∙dm -3 ; 0.61349 mol∙kg -1 ) under free diffusion boundary conditions, using high precision Rayleigh interferometry. Under the experimental conditions these diffusion coefficients are on the volume-fixed reference frame D v . Two series of experiments were performed, the first using the traditional experimental approach with a mercury lamp source and with the interference patterns being recorded on glass photographic plates, and the second with a He-Ne laser light source and computerized data acquisition using a photodiode array. The results from both series of experiments are in excellent agreement, and generally yield diffusion coefficients precise to at least 0.002 x 10 -9 m 2 ∙s 1 (0.15% to 0.19%) and in most cases to 0.001 x 10 -9 m 2 ∙s -1 (0.07% to 0.1%). These experiments also yield accurate values of the refractive index differences for the solution pairs used in the diffusion experiments. The new diffusion coefficients are compared to two sets of published values of diffusion coefficients for K 2 SO 4 (aq) which are somewhat discrepant from each other. This study extends and complements our earlier work on the diffusion coefficients of the most common brine salts: NaCl(aq), KCl(aq), MgCl 2 (aq), CaCl 2 (aq), Na 2 SO 4 (aq), ] MgSO 4 (aq), NaHCO 3 (aq), and KHCO 3 (aq) at 298.15 K.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Evaluation of Computed Tomography Techniques for Material Identification in Low Level and Intermediate Level Waste - 16648

Measures required to assure long term safe storage of Low-level and intermediate-level short-lived (LIL/SL) waste generated by the nuclear-power industry in France include the characterization of the waste and identification of materials within the waste. Digital Radiography (DR) techniques using x-ray at energies in the 6 MeV range have been shown to be effective for validation of the integrity of the concrete containers, and it was considered that the use of this technique together with the addition of Computed Tomography (CT) techniques could effectively identify materials within the waste. This paper describes the initial evaluation of two DR imaging techniques and two CT techniques using x-ray energy spectra up to 9 MeV to inspect a surrogate waste package, which comprised an outer concrete cylindrical container of 1400 mm diameter with 148 mm wall thickness, and an overall volume of 2 meters cubed, within which a 200 liter drum containing representative heterogeneous inactive waste, was placed in the center and the annulus between the 200 liter drum and the outer cylindrical package was filled with cement grout. The surrogate waste within the 200 liter drum comprised three separate layers of high density, medium density and low density mixed materials. The equipment used was a linear accelerator producing high energy spectra at either 6 MeV or 9 MeV and a high-precision CT manipulator with X, Y, Z and rotation motions, which were common to all techniques investigated. Two different digital detectors were used in the DR and CT performance evaluations, a Digital Detector Array (DDA) comprising a columnar Thallium-doped Cesium-Iodide scintillator screen in intimate contact with a 2 k by 2 k array of amorphous silicon detectors, 200 μm x 200 μm in area, and a Linear Diode Array (LDA) comprising a line of Cadmium-Tungstate columns, 1 cm thick and 400 μm x 400 μm in area. The work comprised evaluations of linear accelerator spectra and the attenuation effects of the waste container and contents, image acquisition performance of each detector, and CT techniques using area detector and linear detector. The results presented in this paper include mathematical evaluation of the two CT techniques, and analysis of measurement data, digital images, CT reconstruction images, and estimated material densities. The data was compared with recorded details and photographs of the actual configuration of materials within the surrogate waste. The Digital Detector Array can generate CT inspection volumes with considerable resolution and detail for the low-density and medium-density sections of the surrogate waste, however, the high-density sections were not imaged with sufficient detail and the images contained a large number of artifacts mainly due to the detectors lack of high energy photon stopping power. Materials identification with the Digital Detector Array, while possible for certain materials, for materials in the steel to plastic density range the attenuation values of the voxels in the reconstruction are too similar and difficult to resolve from the artifacts present. The Linear Diode Array can generate CT inspection volumes of regions of interest of the low-density and medium-density sections with considerable resolution and contrast, and potentially acceptable levels of resolution and contrast of the high-density section of the waste. While a few artifacts were present in the reconstructions, the majority are not due to the fundamental properties of the detector and are considered to be correctable. Materials identification with the LDA inspection data appear to be viable, with steel, copper, and higher-density metals being readily be distinguished from other materials on the basis of voxel value. Future work is needed to obtain a better definition of optimum spatial resolution and inspection speed, and to develop a system of 'calibration rods' which would consist of a series of 50 mm diameter cylinders of 7 materials; Plastic, Teflon, Concrete, Aluminum, Copper, Tungsten and Lead. The cylinders will be distributed at a certain radius in the surrogate waste and will be used as reference points in the evaluation and demonstration of the contrastive performance for the low, medium and high-density cases. The ability to identify the materials within a sealed waste container, by nondestructive examination, enables the verification of waste acceptance criteria without the need to open the waste containers. This eliminates the need for complex and expensive equipment to open and remotely handle the intermediate level waste, avoids potential hazards and risk of personnel dose uptake, and does not increase the volume of waste caused by repackaging of materials after examination and the decontamination or disposal of equipment used.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Light Output and Thermal Blast Analysis of Nuclear Fireballs

During the 1940s, 50s, and 60s, there were 210 atmospheric nuclear tests. Every test was extensively recorded with high quality motion picture films and photographs, providing a unique historic record, containing ~10,000 films, with a total of ~22 million frames of information. Much of what is known about the effects of nuclear weapons has been obtained from these tests. There are approximately 6500 scientific films that are in the process of being scanned by Lawrence Livermore National Laboratory and re-analyzed using modern computer techniques. The four major effects of a nuclear detonation are prompt radiation, shockwave, thermal blast, and fallout. The objective of this interim report is to describe recent efforts to extract benchmark data from the existing streak films using modern Figure-processing techniques. These new and, hopefully, greatly-improved data will provide our code developers with the benchmark data necessary to validate our modern computer codes that simulate nuclear weapon effects.