Search NASA⌕ Search

SEARCH · Search NASA

Results for “PLM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

QA/QC-ed Groundwater Level Time Series in PLM-1 and PLM-6 Monitoring Wells, East River, Colorado (2016-2022)

This data set contains QA/QC-ed (Quality Assurance and Quality Control) water level data for the PLM1 and PLM6 wells. PLM1 and PLM6 are location identifiers used by the Watershed Function SFA project for two groundwater monitoring wells along an elevation gradient located along the lower montane life zone of a hillslope near the Pumphouse location at the East River Watershed, Colorado, USA. These wells are used to monitor subsurface water and carbon inventories and fluxes, and to determine the seasonally dependent flow of groundwater under the PLM hillslope. The downslope flow of groundwater in combination with data on groundwater chemistry (see related references) can be used to estimate rates of solute export from the hillslope to the floodplain and river. QA/QC analysis of measured groundwater levels in monitoring wells PLM-1 and PLM-6 included identification and flagging of duplicated values of timestamps, gap filling of missing timestamps and water levels, removal of abnormal/bad and outliers of measured water levels. The QA/QC analysis also tested the application of different QA/QC methods and the development of regular (5-minute, 1-hour, and 1-day) time series datasets, which can serve as a benchmark for testing other QA/QC techniques, and will be applicable for ecohydrological modeling. The package includes a Readme file, one R code file used to perform QA/QC, a series of 8 data csv files (six QA/QC-ed regular time series datasets of varying intervals (5-min, 1-hr, 1-day) and two files with QA/QC flagging of original data), and three files for the reporting format adoption of this dataset (InstallationMethods, file level metadata (flmd), and data dictionary (dd) files).QA/QC-ed data herein were derived from the original/raw data publication available at Williams et al., 2020 (DOI: 10.15485/1818367). For more information about running R code file (10.15485_1866836_QAQC_PLM1_PLM6.R) to reproduce QA/QC output files, see README (QAQC_PLM_readme.docx). This dataset replaces the previously published raw data time series, and is the final groundwater data product for the PLM wells in the East River. Complete metadata information on the PLM1 and PLM6 wells are available in a related dataset on ESS-DIVE: Varadharajan C, et al (2022). https://doi.org/10.15485/1660962. These data products are part of the Watershed Function Scientific Focus Area collection effort to further scientific understanding of biogeochemical dynamics from genome to watershed scales. 2022/09/09 Update: Converted data files using ESS-DIVE’s Hydrological Monitoring Reporting Format. With the adoption of this reporting format, the addition of three new files (v1_20220909_flmd.csv, V1_20220909_dd.csv, and InstallationMethods.csv) were added. The file-level metadata file (v1_20220909_flmd.csv) contains information specific to the files contained within the dataset. The data dictionary file (v1_20220909_dd.csv) contains definitions of column headers and other terms across the dataset. The installation methods file (InstallationMethods.csv) contains a description of methods associated with installation and deployment at PLM1 and PLM6 wells. Additionally, eight data files were re-formatted to follow the reporting format guidance (er_plm1_waterlevel_2016-2020.csv, er_plm1_waterlevel_1-hour_2016-2020.csv, er_plm1_waterlevel_daily_2016-2020.csv, QA_PLM1_Flagging.csv, er_plm6_waterlevel_2016-2020.csv, er_plm6_waterlevel_1-hour_2016-2020.csv, er_plm6_waterlevel_daily_2016-2020.csv, QA_PLM6_Flagging.csv). The major changes to the data files include the addition of header_rows above the data containing metadata about the particular well, units, and sensor description. 2023/01/18 Update: Dataset updated to include additional QA/QC-ed water level data up until 2022-10-12 for ER-PLM1 and 2022-10-13 for ER-PLM6. Reporting format specific files (v2_20230118_flmd.csv, v2_20230118_dd.csv, v2_20230118_InstallationMethods.csv) were updated to reflect the additional data. R code file (QAQC_PLM1_PLM6.R) was added to replace the previously uploaded HTML files to enable execution of the associated code. R code file (QAQC_PLM1_PLM6.R) and ReadMe file (QAQC_PLM_readme.docx) were revised to clarify where original data was retrieved from and to remove local file paths.

54 ENVIRONMENTAL SCIENCES↗

PLM Innovation in Far Away Places

This viewgraph presentation reviews Jet Propulsion Laboratory's Product Lifecycle Management (PLM) mission to upgrade to product data management systems.

PLM↗

Hillslope subsurface flow and transport data for the PLM transect in East River, Colorado

This file contains data used to calculate subsurface flow and transport at the Pumphouse Lower Montane (PLM) hillslope transect. Information includes locations, weather data, hydraulic conductivities, hydraulic head profiles, soil water profiles, depths to the water table, specific conductance (SC) and dissolved organic carbon (DOC) in pore waters, water isotopic composition, calculated subsurface fluxes, calculated subsurface transport concentrations for SC and DOC, East River discharge and SC, transect soil particle-size distributions, and moisture characteristic curves.

54 ENVIRONMENTAL SCIENCES↗

Collaborative PLM - The Next Generation AKA Cars on Mars

In this slide presentation the importance of collaboration in developing the next systems for space exploration is stressed. The mechanism of this collaboration are reviewed, and particular emphasis is given to our planned exploration of Mars and how this will require a great deal of collaboration. A system architecture for this collaboration is shown and the diagram for the collaborative environment is conceptualized.

collaboration↗

Overcoming the doping limit in GaAs by ion implantation and pulsed laser melting

Most semiconductors exhibit a saturation of free carriers when heavily doped with extrinsic dopants. This carrier saturation or “doping limit” is known to be related to the formation of native compensating defects, which, in turn, depends on the energy positions of their conduction band minimum and valence band maximum. Here, we carried out a systematic study on the n-type doping limit of GaAs via ion implantation and showed that this doping limitation can be alleviated by the transient process of pulsed laser melting (PLM). For n-type doping, both group VI (S) and amphoteric group IV (Si and Ge) dopants were implanted in GaAs. For comparison, p-type doping was also studied using Zn as the acceptor. Implanted dopants were activated by the PLM method, and the results are compared to rapid thermal annealing (RTA). Our results reveal that for all n-type dopants, while implantation followed by the RTA results in a similar saturation electron concentration of 2–3 × 10 18 cm –3 , the transient PLM process is capable of trapping high concentration of dopants in the substitutional site, giving rise to a carrier concentration of >10 19 cm –3 , exceeding the doping limit of GaAs. However, due to scatterings from point defects generated during PLM, the mobility of n-type GaAs after PLM is low (~80–260 cm 2 /V s). Subsequent RTA after PLM (PLM + RTA) is able to remove these point defects and recover the mobility to ~1000–2000 cm2/V s. The carrier concentrations of these PLM + RTA samples are reduced but are still a factor of 3 higher than RTA only GaAs. This can be understood as the dopants are already incorporated in the substitutional site after PLM; they are less likely to be “deactivated” by subsequent RTA. This work is significant to the understanding of doping mechanisms in semiconductors and provides a means for device applications, which require materials with ultra-high doping.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The Pressurized Logistics Module: Providing Consumables and Resupply Logistics to the Lunar Surface for a Long-duration Manned Mission

In response to President Bush s 2004 Vision for Space Exploration initiative, NASA established an agency-wide Lunar Architecture Team (LAT) to develop the high-level requirements, assumptions, ground-rules and objectives for a manned mission to the moon. During Phase II of the evaluation, the Habitation Focus Element Group was directed to conceptually develop and design a Pressurized Logistics Module (PLM). The PLM task was delivered with one major requirement: to derive a system with minimal mass and cost, and a maximum, functional, internal volumetric area in order to provide the maximum amount of consumables, supportability and logistic re-supply for a crew of four to the Lunar surface with an overall integrated maximum weight of 5200kg. The PLM was derived from the Habitation Group s "mini-Hab" option. This concept required that the PLM have an aluminum-clad graphite epoxy external truss, utilized for increased mobility and stability, which would encompass a 2.7 meter diameter pressurized aluminum-lithium cylinder. Several trade studies and analyses were performed to determine the final length and orientation of the module, the number of systems required to maintain the PLM, and the number of hatches/mating mechanisms which would successfully and efficiently meet the requirements. Of the five specific configurations assessed, the PLM was determined to have a 3 meter by 3 meter by 5 meter external truss with a 2.7 meter diameter and 5 meter long horizontal, pressurized cylinder with one hatch/mating mechanism on one end cone. Two major assumptions aided in the formulation of the technical baseline: 1) the PLM should be sustainable for up to 18 months on the Lunar Lander without connection to its final destination, the Lunar Outpost, and 2) it must be self-sufficient to withstand a maximum eight hour transit from the Lander to the Outpost. Per these assumptions, eight major systems constitute the PLM: structures, passive mating, protection, power, thermal, avionics, life support and outfitting. Including a conservative 20% growth, the overall estimated tare weight for the PLM was determined to be 2181kg. The tare weight of the design allowed the available internal volume of the cylinder with a 0.20 meter high floor to transport the maximum of either 176 single Crew Transfer Bags (CTBs) or 3019kg.

Carpenter, Amanda↗

Product Lifecycle Management and the Quest for Sustainable Space Exploration Solutions

Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Engineering Directorate at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center, total lifecycle costs are important variables for critical decisionmaking. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful tool to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This paper will demonstrate how the Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions. It has been 30 years since the United States fielded the Space Shuttle. The next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. The outcome is a better use of scarce resources, along with more focus on stakeholder and customer requirements, as a new portfolio of enabling tools becomes second nature to the workforce. This paper will use the design and manufacturing processes, which have transitioned to digital-based activities, to show how PLM supports the comprehensive systems engineering and integration function. It also will go through a launch countdown scenario where an anomaly is detected to show how the virtual vehicle created from paperless processes will help solve technical challenges and improve the likelihood of launching on schedule, with less hands-on labor needed for processing and troubleshooting. Sustainable space exploration solutions demand that all lifecycle phases be optimized. Adopting PLM, which has been used by the automotive industry for many years, for aerospace applications provides a foundation for strong, disciplined systems engineering and accountable return on investment by making lifecycle considerations variables in an iterative decision-making process. This paper combines the perspectives of the founding father of PLM, along with the experience of Engineering leaders who are implementing these processes and practices real-time. As the nation moves from an industrial-based society to one where information is a valued commodity, future NASA programs and projects will benefit from the experience being gained today for the exploration missions of tomorrow.

Caruso, Pamela W.↗

Product Lifecycle Management and the Quest for Sustainable Space Exploration Solutions

Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Marshall Space Flight Center (MSFC) Engineering Directorate, total lifecycle costs are important variables for critical decision-making. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful concept to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This briefing will demonstrate how the MSFC Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions and how that strategy aligns with the Agency and Center systems engineering policies and processes. Sustainable space exploration solutions demand that all lifecycle phases be optimized, and engineering the next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. Adopting PLM, which has been used by the aerospace and automotive industry for many years, for spacecraft applications provides a foundation for strong, disciplined systems engineering and accountable return on investment. PLM enables better solutions using fewer resources by making lifecycle considerations in an integrative decision-making process.

Caruso, Pamela W.↗

Local homogeneity of cell cycle length in developing mouse cortex

We have measured the amount of variation in the length of the cell cycle for cells in the pseudostratified ventricular epithelium (PVE) of the developing cortex of mice on embryonic day 14. Our measurements were made in three cortical regions (i.e., the neocortex, archicortex, and periarchicortex) using three different methods: the cumulative labeling method (CLM), the percent labeled mitoses (PLM) method, and a comparison of the time needed for the PLM to ascend from 0 to 100% with the time needed for the PLM to descend from 100 to 0%. These 3 different techniques provide different perspectives on the cytokinetic parameters. Theoretically, CLM gives an estimate for a maximum value of the total length of the cell cycle (TC), whereas PLM gives an estimate of a minimum value of TC. The difference between these two estimates indicates that the range for TC is +/-1% of the mean TC for periarchicortex, +/-7% for neocortex, and +/-8% for archicortex. This was confirmed by a lengthening of the PLM descent time in comparison with its ascent time. The sharpness of the transitions and the flatness of the plateau of the PLM curves indicate that 99% of the proliferating cells are within this narrow estimated range for TC; hence, only approximately 1% deviate outside of a relatively restricted range from the average TC of the population. In the context of the possible existence within the cortical PVE of two populations with markedly dissimilar cell cycle kinetics from the mean, one such population must comprise approximately 99% of the total population, and the other, if it exists, is only approximately 1% of the total. This seems to be true for all three cortical regions. The narrow range of TC indicates a homogeneity in the cell cycle length for proliferating cells in three different cortical regions, despite the fact that progenitor cells of different lineages may be present. It further predicts the existence of almost synchronous interkinetic nuclear movements of the proliferating cells in the ventricular zone during early development of the cerebral cortex.

Non-NASA Center↗

Product Lifecycle Management and the Quest for Sustainable Space Explorations

Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Engineering Directorate at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center, total lifecycle costs are important variables for critical decision-making. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful concept to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This paper will demonstrate how the Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions. It has been 30 years since the United States fielded the Space Shuttle. The next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. The outcome is a better use of scarce resources, along with more focus on stakeholder and customer requirements, as a new portfolio of enabling tools becomes second nature to the workforce. This paper will use the design and manufacturing processes, which have transitioned to digital-based activities, to show how PLM supports the comprehensive systems engineering and integration function. It also will go through a launch countdown scenario where an anomaly is detected to show how the virtual vehicle created from paperless processes will help solve technical challenges and improve the likelihood of launching on schedule, with less hands-on labor needed for processing and troubleshooting.

Caruso, Pamela W.↗

A Commercial Building Plug Load Management System that Uses Internet of Things Technology to Automatically Identify Plugged-In Devices and Their Locations

Plug and process loads (PPLs) account for a large portion of U.S. commercial building energy use. There is a huge potential to reduce whole building consumption by targeting PPLs for energy savings measures or implementing some form of plug load management (PLM). Despite this potential, there has yet to be a widely adopted commercial PLM technology. This paper describes the Automatic Type and Location Identification System (ATLIS), a PLM system framework with automatic and dynamic load detection (ADLD). ADLD gives PLM systems the ability to automatically identify devices as they are plugged into the outlets of a building. The ATLIS framework takes advantage of smart, connected devices to identify device locations in a building, meter and control their power, and communicate this information to a central database. ATLIS includes five primary capabilities: location identification, communication, control, energy metering, and data storage. A laboratory proof of concept (PoC) demonstrated all but the energy metering capability, and these capabilities were validated using a series of system tests. The PoC was able to identify when a device was plugged into an outlet and the location of the device in the building. When a device was moved, the PoC's dashboard and database were automatically updated with the new location. The PoC implemented controls to devices from the system dashboard so that devices maintained correct schedules regardless of where they were plugged in within the building. ATLIS's primary technology application is improved PLM, but other applications include asset management, energy audits, and interoperability for grid-interactive efficient buildings. An ATLIS-based system could also be used to direct power to critical devices, such as ventilators, during a brownout or blackout. Such a framework is an opportunity to make PLM more widespread and reduce the amount of energy consumed by PPLs in current and future commercial buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗