Search NASA⌕ Search

SEARCH · Search NASA

Results for “POLLUTION CONTROL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Corrosion Effects of Calcium Chloride Injection for Mercury Control on the Pollution Control Equipment

In response to the Clean Air Mercury Rule (CAMR) of 2005, Black Hills Power (BHP) initiated testing of a calcium chloride (CaCl{sub 2}) injection method in their Wygen 1 (Gillette, WY) coal-fired power plant to help lower mercury emissions. In 2006, Babcock & Wilcox (B&W) was contracted to test their CaCl{sub 2} technology in-situ by adding a CaCl{sub 2} solution onto the raw, pre-pulverized coal during normal operation of Wygen 1. Follow-up tests were conducted by BHP in 2007. Data were collected from these two time periods and analyzed by a collaborative investigation team from Western Research Institute (WRI) and the University of Wyoming (UW) to see if there were any effects on the current air pollution control systems. During a CaCl{sub 2} injection period in 2007, corrosion was monitored in the flue and recycle ash system by placing corrosion coupons in strategic locations to test if corrosion was enhanced by the CaCl{sub 2} injection. While the CaCl{sub 2} produced a reduction in stack mercury levels, there was some evidence of beneficial impacts on the removal of SO{sub 2} from the flue gas during CaCl{sub 2} injection. Data on NOx remained inconclusive. It was also discovered that corrosion was enhanced significantly in the Spray Drier Absorber (SDA) vessel and corresponding outlet ductwork during CaCl{sub 2} injections. Further studies are being carried out in the field and lab to better understand the corrosive effects of CaCl{sub 2} to help formulate operation controls to manage the increased corrosion rates.

01 COAL, LIGNITE, AND PEAT↗

Greenidge Multi-Pollutant Control Project

The Greenidge Multi-Pollutant Control Project was conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electric generating units (EGUs). There are about 400 units in the United States with capacities of 50-300 MW that currently are not equipped with selective catalytic reduction (SCR), flue gas desulfurization (FGD), or mercury control systems. Many of these units, which collectively represent more than 55 GW of installed capacity, are difficult to retrofit for deep emission reductions because of space constraints and unfavorable economies of scale, making them increasingly vulnerable to retirement or fuel switching in the face of progressively more stringent environmental regulations. The Greenidge Project sought to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs by offering a combination of deep emission reductions, low capital costs, small space requirements, applicability to high-sulfur coals, mechanical simplicity, and operational flexibility. The multi-pollutant control system includes a NO{sub x}OUT CASCADE{reg_sign} hybrid selective non-catalytic reduction (SNCR)/in-duct SCR system for NO{sub x} control and a Turbosorp{reg_sign} circulating fluidized bed dry scrubbing system (with a new baghouse) for SO{sub 2}, SO{sub 3}, HCl, HF, and particulate matter control. Mercury removal is provided as a co-benefit of the in-duct SCR, dry scrubber, and baghouse, and by injection of activated carbon upstream of the scrubber, if required. The multi-pollutant control system was installed and tested on the 107-MW{sub e}, 1953-vintage AES Greenidge Unit 4 by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. About 44% of the funding for the project was provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and the remaining 56% was provided by AES Greenidge. Project goals included reducing high-load NO{sub x} emissions to {le} 0.10 lb/mmBtu; reducing SO{sub 2}, SO{sub 3}, HCl, and HF emissions by at least 95%; and reducing Hg emissions by at least 90% while the unit fired 2-4% sulfur eastern U.S. bituminous coal and co-fired up to 10% biomass. This report details the final results from the project. The multi-pollutant control system was constructed in 2006, with a total plant cost of $349/kW and a footprint of 0.4 acre - both substantially less than would have been required to retrofit AES Greenidge Unit 4 with a conventional SCR and wet scrubber. Start-up of the multi-pollutant control system was completed in March 2007, and the performance of the system was then evaluated over an approximately 18-month period of commercial operation. Guarantee tests conducted in March-June 2007 demonstrated attainment of all of the emission reduction goals listed above. Additional tests completed throughout the performance evaluation period showed 96% SO{sub 2} removal, 98% mercury removal (with no activated carbon injection), 95% SO{sub 3} removal, and 97% HCl removal during longer-term operation. Greater than 95% SO{sub 2} removal efficiency was observed even when the unit fired high-sulfur coals containing up to 4.8 lb SO{sub 2}/mmBtu. Particulate matter emissions were reduced by more than 98% relative to the emission rate observed prior to installation of the technology. The performance of the hybrid SNCR/SCR system was affected by problems with large particle ash, ammonia slip, and nonideal combustion characteristics, and high-load NO{sub x} emissions averaged 0.14 lb/mmBtu during long-term operation. Nevertheless, the system has reduced the unit's overall NO{sub x} emissions by 52% on a lb/mmBtu basis. The commercial viability of the multi-pollutant control system was demonstrated at AES Greenidge Unit 4. The system, which remains in service after the conclusion of the project, has enabled the unit to satisfy its permit requirements while continuing to operate profitably. As a result of the success at AES Greenidge Unit 4, three additional deployments of the Turbosorp{reg_sign} technology had been announced by the end of the project.

01 COAL, LIGNITE, AND PEAT↗

Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

01 COAL, LIGNITE, AND PEAT↗

Life-cycle-assessment of the historical development of air pollution control and energy recovery in waste incineration

Incineration of municipal solid waste is a debated waste management technology. In some countries it is the main waste management option whereas in other countries it has been disregarded. The main discussion point on waste incineration is the release of air emissions from the combustion of the waste, but also the energy recovery efficiency has a large importance. The historical development of air pollution control in waste incineration was studied through life-cycle-assessment modelling of eight different air pollution control technologies. The results showed a drastic reduction in the release of air emissions and consequently a significant reduction in the potential environmental impacts of waste incineration. Improvements of a factor 0.85-174 were obtained in the different impact potentials as technology developed from no emission control at all, to the best available emission control technologies of today (2010). The importance of efficient energy recovery was studied through seven different combinations of heat and electricity recovery, which were modelled to substitute energy produced from either coal or natural gas. The best air pollution control technology was used at the incinerator. It was found that when substituting coal based energy production total net savings were obtained in both the standard and toxic impact categories. However, if the substituted energy production was based on natural gas, only the most efficient recovery options yielded net savings with respect to the standard impacts. With regards to the toxic impact categories, emissions from the waste incineration process were always larger than those from the avoided energy production based on natural gas. The results shows that the potential environmental impacts from air emissions have decreased drastically during the last 35 years and that these impacts can be partly or fully offset by recovering energy which otherwise should have been produced from fossil fuels like coal or natural gas.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Power plant air pollutant control 'Mega' symposium

Topics covered carbon management technologies, mercury (FGD-based controls, sorbents, TOXECON, additives and SO{sub 3} countermeasures 0, NOx (combined controls, SCR), SO{sub 2}, SO{sub 3}, multi-pollutant controls, particulates, and coal combustion products. The poster papers are also included.

01 COAL, LIGNITE, AND PEAT↗

Oil shale derived pollutant control materials and methods and apparatuses for producing and utilizing the same

Pollution control substances may be formed from the combustion of oil shale, which may produce a kerogen-based pyrolysis gas and shale sorbent, each of which may be used to reduce, absorb, or adsorb pollutants in pollution producing combustion processes, pyrolysis processes, or other reaction processes. Pyrolysis gases produced during the combustion or gasification of oil shale may also be used as a combustion gas or may be processed or otherwise refined to produce synthetic gases and fuels.

04 OIL SHALES AND TAR SANDS↗

Air pollution control systems in WtE units: An overview

Highlights: • The paper describes in brief terms the development of gas cleaning in waste incineration. • The main technologies for pollutant removal are described including their basic mechanisms. • Their respective efficiencies and their application are discussed. • A cautious outlook regarding future developments is made. - Abstract: All WtE (waste-to-energy) plants, based on combustion or other thermal processes, need an efficient gas cleaning for compliance with legislative air emission standards. The development of gas cleaning technologies started along with environment protection regulations in the late 1960s. Modern APC (air pollution control) systems comprise multiple stages for the removal of fly ashes, inorganic and organic gases, heavy metals, and dioxins from the flue gas. The main technologies and devices used for abatement of the various pollutants are described and their basic principles, their peculiarities, and their application are discussed. Few systems for cleaning of synthesis gas from waste gasification plants are included. Examples of APC designs in full scale plants are shown and cautious prospects for the future development of APC systems are made.

54 ENVIRONMENTAL SCIENCES↗

Fate of mercury collected from air pollution control devices

Mercury that enters a coal-fired power plant originates from the coal that is burned and leaves through the output streams, which include stack emissions and air pollution control (APC) residues (either in solid or liquid form). This article describes recent findings on the fate and environmental stability of mercury in coal combustion residues (CCRs) such as fly ash and solid products from flue gas desulfurization (FGD) scrubbers when either disposed or reused in agricultural, commercial, or engineering applications. 19 refs., 4 figs., 5 tabs.

01 COAL, LIGNITE, AND PEAT↗

Detecting tropospheric composition and climate responses to US air pollution controls in the context of internally-arising variability

Since the 1970s, air pollutant emissions controls in the United States (US) have lowered concentrations of ozone (O 3 ) and aerosols, which have opposing radiative effects on surface temperature. Using a pair of initial-condition ensembles generated by a fully-coupled chemistry-climate model, we simulate the “world avoided” by US air pollution controls. In this counterfactual world, we find tropospheric column O 3 increases, robust to natural internal variability, extending across the Northern Hemisphere. Robust aerosol increases, dominated by sulfate, remain localized near the US. Wintertime Northwest Atlantic cloud droplet number concentration is particularly sensitive to US aerosol. While an ensemble mean US surface cooling signal (−0.4 °C) implies that aerosol-driven cooling prevails over any O 3 -induced warming, we find that large regional internal variability will confound its detection in any single transient realization. Larger signal-to-noise ratios for composition versus climate variables underscore the greater detectability of emissions-driven changes in tropospheric composition compared to their associated climate impacts.

54 ENVIRONMENTAL SCIENCES↗

Win–Win strategies to promote air pollutant control policies and non-fossil energy target regulation in China

The rapid growth of energy consumption in China has led to increased emissions of air pollutants. As a response, in its 12th Five Year Plan the Chinese government proposed mitigation targets for SO2 and NOx emissions. Herein we have investigated mitigation measures taken in different sectors and their corresponding impacts on the energy system. Additionally, as non-fossil energy development has gained traction in addressing energy and environmental challenges in China, we further investigated the impact of non-fossil energy development on air pollutant emissions, and then explored interactions and co-benefits between these two types of policies. An extended Global Change Assessment Model (GCAM) was used in this study, which includes an additional air pollutant emissions control module coupling multiple end-of-pipe (EOP) control technologies with energy technologies, as well as more detailed end-use sectors in China. We find that implementing EOP control technologies would reduce air pollution in the near future, but with little room left to implement these EOP technologies, other cleaner and more efficient technologies are also effective. These technologies would reduce final energy consumption, increase electricity’s share in final energy, and increase the share of non-fossil fuels in primary energy and electricity consumption. Increasing non-fossil energy usage at China’s proposed adoption rate would in turn also reduce SO2 and NOx emissions, however, the reductions from this policy alone still lag behind the targeted requirements of air pollutant reduction. Fortunately, a combination of air pollutant controls and non-fossil energy development could synergistically help realize the respective individual targets, and would result in lower costs than would addressing these issues separately.

Air pollution↗

E Tunnel Wastewater Disposal System Quarterly Monitoring Report Nevada National Security Site, Nevada Water Pollution Control Permit NEV 96021, Third Quarter 2018

This report includes the results of the E Tunnel Wastewater Disposal System (ETDS) inspections and monitoring for July, August, and September 2018. Monitoring and sampling activities were performed in accordance with the requirements of Water Pollution Control Permit NEV 96021, Revision 1, effective October 1, 2013. Monthly monitoring was conducted on July 16, August 13, and September 13, 2018. Operating personnel measured the instantaneous flow rate (see Table 1), log hydrogen ion activity (pH), temperature, and specific conductance of the discharge water (see Table 2). Monthly inspections also included an assessment of the general condition of the berms, including ponding (the water levels relative to the overflow pipes); any tunneling or burrowing into the berms; soil conditions on and around the berms, including erosion or sloughing of the interior or exterior slopes of the berms; seeps at the toe of the berms; the presence of any deep-rooting botanicals on the berms; and the physical condition of fencing (see Tables 3 through 7). Monthly rainfall quantities are presented in Table 8.

54 ENVIRONMENTAL SCIENCES↗

Air pollution control strategies directly limiting national health damages in the US

Exposure to fine particulate matter (PM 2.5 ) from fuel combustion significantly contributes to global and US mortality. Traditional air pollution control strategies typically focus on emission reductions for specific air pollutants or sectors to maintain air pollutant concentrations within acceptable levels. Here we directly set national PM 2.5 mortality cost reduction targets within a global human-earth system model with US state-level energy systems, identifying endogenously the control actions, sectors, and locations that most cost-effectively reduce PM 2.5 mortality. Our results show that substantial health benefits can be cost-effectively achieved by using electricity to replace sources with high primary PM 2.5 emission intensities, including industrial coal, building biomass, and industrial liquids. Increasing the stringency of PM 2.5 reduction targets expedites the phaseout of high emission intensity sources, leading to larger declines in major air pollutant emissions, but very limited co-benefits in reducing CO 2 emissions. Control strategies achieve the greatest mortality cost reductions in the East North Central and Middle Atlantic states.

54 ENVIRONMENTAL SCIENCES↗

Toxecon Retrofit for Mercury and Mulit-Pollutant Control on Three 90-MW Coal-Fired Boilers

This U.S. Department of Energy (DOE) Clean Coal Power Initiative (CCPI) project was based on a cooperative agreement between We Energies and the DOE Office of Fossil Energy's National Energy Technology Laboratory (NETL) to design, install, evaluate, and demonstrate the EPRI-patented TOXECON{trademark} air pollution control process. Project partners included Cummins & Barnard, ADA-ES, and the Electric Power Research Institute (EPRI). The primary goal of this project was to reduce mercury emissions from three 90-MW units that burn Powder River Basin coal at the We Energies Presque Isle Power Plant in Marquette, Michigan. Additional goals were to reduce nitrogen oxide (NO{sub x}), sulfur dioxide (SO{sub 2}), and particulate matter emissions; allow reuse and sale of fly ash; advance commercialization of the technology; demonstrate a reliable mercury continuous emission monitor (CEM) suitable for use at power plants; and demonstrate recovery of mercury from the sorbent. Mercury was controlled by injection of activated carbon upstream of the TOXECON{trademark} baghouse, which achieved more than 90% removal on average over a 44-month period. During a two-week test involving trona injection, SO{sub 2} emissions were reduced by 70%, although no coincident removal of NOx was achieved. The TOXECON{trademark} baghouse also provided enhanced particulate control, particularly during startup of the boilers. On this project, mercury CEMs were developed and tested in collaboration with Thermo Fisher Scientific, resulting in a reliable CEM that could be used in the power plant environment and that could measure mercury as low as 0.1 {micro}g/m{sup 3}. Sorbents were injected downstream of the primary particulate collection device, allowing for continued sale and beneficial use of captured fly ash. Two methods for recovering mercury using thermal desorption on the TOXECON{trademark} PAC/ash mixture were successfully tested during this program. Two methods for using the TOXECON{trademark} PAC/ash mixture in structural concrete were also successfully developed and tested. This project demonstrated a significant reduction in the rate of emissions from Presque Isle Units 7, 8, and 9, and substantial progress toward establishing the design criteria for one of the most promising mercury control retrofit technologies currently available. The Levelized Cost for 90% mercury removal at this site was calculated at $77,031 per pound of mercury removed with a capital cost of $63,189 per pound of mercury removed. Mercury removal at the Presque Isle Power Plant averages approximately 97 pounds per year.

01 COAL, LIGNITE, AND PEAT↗

Mercury Specie and Multi-Pollutant Control

This project was awarded to demonstrate the ability to affect and optimize mercury speciation and multi-pollutant control using non-intrusive advanced sensor and optimization technologies. The intent was to demonstrate plant-wide optimization systems on a large coal fired steam electric power plant in order to minimize emissions, including mercury (Hg), while maximizing efficiency and maintaining saleable byproducts. Advanced solutions utilizing state-of-the-art sensors and neural network-based optimization and control technologies were proposed to maximize the removal of mercury vapor from the boiler flue gas thereby resulting in lower uncontrolled releases of mercury into the atmosphere. Budget Period 1 (Phase I) - Included the installation of sensors, software system design and establishment of the as-found baseline operating metrics for pre-project and post-project data comparison. Budget Period 2 (Phase II) - Software was installed, data communications links from the sensors were verified, and modifications required to integrate the software system to the DCS were performed. Budget Period 3 (Phase III) - Included the validation and demonstration of all control systems and software, and the comparison of the optimized test results with the targets established for the project site. This report represents the final technical report for the project, covering the entire award period and representing the final results compared to project goals. NeuCo shouldered 61% of the total project cost; while DOE shouldered the remaining 39%. The DOE requires repayment of its investment. This repayment will result from commercial sales of the products developed under the project. NRG's Limestone power plant (formerly owned by Texas Genco) contributed the host site, human resources, and engineering support to ensure the project's success.

01 COAL, LIGNITE, AND PEAT↗

Element composition and mineralogical characterisation of air pollution control residue from UK energy-from-waste facilities

Highlights: • 66 elements, including “critical strategic elements” were determined in UK EfW APC residues. • Metal pollutants (Zn, Pb, As, Cd, Cu, Mo, Sb, Sn, Se, Ag and In) are enriched in APC residues. • Metal pollutants were widely associated with fine deposits of highly soluble CaCl{sub x}OH{sub 2−x}. • Specific metal (Zn, Pb, Cu)-bearing minerals were also detected in APC residues. - Abstract: Air pollution control (APC) residues from energy-from-waste (EfW) are alkaline (corrosive) and contain high concentrations of metals, such as zinc and lead, and soluble salts, such as chlorides and sulphates. The EPA 3050B-extractable concentrations of 66 elements, including critical elements of strategic importance for advanced electronics and energy technologies, were determined in eight APC residues from six UK EfW facilities. The concentrations of Ag (6–15 mg/kg) and In (1–13 mg/kg), as well as potential pollutants, especially Zn (0.26–0.73 wt.%), Pb (0.05–0.2 wt.%), As, Cd, Cu, Mo, Sb, Sn and Se were found to be enriched in all APC residues compared to average crustal abundances. Results from a combination of scanning electron microscopy with energy dispersive X-ray spectroscopy and also powder X-ray diffraction, thermal analysis and Fourier transform infrared spectroscopy give an exceptionally full understanding of the mineralogy of these residues, which is discussed in the context of other results in the literature. The present work has shown that the bulk of the crystalline phases present in the investigated APC residues include Ca-based phases, such as CaCl{sub x}OH{sub 2−x}, CaCO{sub 3}, Ca(OH){sub 2}, CaSO{sub 4}, and CaO, as well as soluble salts, such as NaCl and KCl. Poorly-crystalline aragonite was identified by FTIR. Sulphur appears to have complex redox speciation, presenting as both anhydrite and hannebachite in some UK EfW APC residues. Hazardous elements (Zn and Pb) were widely associated with soluble Ca- and Cl-bearing phases (e.g. CaCl{sub x}OH{sub 2−x} and sylvite), as well as unburnt organic matter and aluminosilicates. Specific metal-bearing minerals were also detected in some samples: e.g., Pb present as cerussite; Zn in gahnite, zincowoodwardite and copper nickel zinc oxide; Cu in tenorite, copper nickel zinc oxide and fedotovite. Aluminium foil pieces were present and abundantly covered by fine phases, particularly in any cracks, probably in the form of Friedel’s salt.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

E-Tunnel wastewater discharge permit quarterly monitoring report. Water pollution control permit Nev 96021, third quarter 2020

Monitoring and sampling activities are performed at the E-Tunnel Wastewater Disposal System (ETDS ) in accordance with the requirements of Water Pollution Control (WPC) Permit NEV 96021, Revision 1, which is effective October 1, 2013. Although the end date of the WPC permit is September 30, 2018, the Nevada Division of Environmental Protection (NDEP), in a letter dated September 21, 2018, provided guidance that indicated the WPC Permit NEV 96021, Revision 1, is in effect until NDEP notifies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office otherwise. This QMR includes the results of monthly inspections and monitoring for July, August, and September 2020. Monthly inspections and monitoring were conducted on July 21, August 19, and September 16, 2020. Inspections include a visual assessment of the berms, ponding, water levels relative to the overflow pipes, tunneling or burrowing into the berms, soil conditions on and around the berms, erosion or sloughing of the slopes of the berms, seeps at the toe of the berms, deep-rooting botanicals on the berms, and fencing. Monthly monitoring includes measurement s of the instantaneous flow rate, hydrogen ion activity (pH), and specific conductance of the ETDS discharge. The report will be submitted to the State of Nevada.

54 ENVIRONMENTAL SCIENCES↗

Method oil shale pollutant sorption/NO.sub.x reburning multi-pollutant control

A method of decreasing pollutants produced in a combustion process. The method comprises combusting coal in a combustion chamber to produce at least one pollutant selected from the group consisting of a nitrogen-containing pollutant, sulfuric acid, sulfur trioxide, carbonyl sulfide, carbon disulfide, chlorine, hydroiodic acid, iodine, hydrofluoric acid, fluorine, hydrobromic acid, bromine, phosphoric acid, phosphorous pentaoxide, elemental mercury, and mercuric chloride. Oil shale particles are introduced into the combustion chamber and are combusted to produce sorbent particulates and a reductant. The at least one pollutant is contacted with at least one of the sorbent particulates and the reductant to decrease an amount of the at least one pollutant in the combustion chamber. The reductant may chemically reduce the at least one pollutant to a benign species. The sorbent particulates may adsorb or absorb the at least one pollutant. A combustion chamber that produces decreased pollutants in a combustion process is also disclosed.

01 COAL, LIGNITE, AND PEAT↗

E Tunnel Wastewater Disposal System Quarterly Monitoring Report Nevada National Security Site, Nevada Water Pollution Control Permit NEV 96021, Second Quarter 2018

This report includes the results of the E Tunnel Wastewater Disposal System (ETDS) inspections and monitoring for April, May and June 2018. Monitoring and sampling activities were performed in accordance with the requirements of Water Pollution Control Permit NEV 96021, Revision 1, effective October 1, 2013.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗