Search NASASearch

SEARCH · Search NASA

Results for “PPAP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Wire Arc Additive Manufacturing of Lightweight High Pressure Die Casting Tooling

Oak Ridge National Laboratory (ORNL) and Mercury Marine partnered to develop and test methods for additively manufactured tooling for aluminum die casting applications under CRADA agreement NFE-20-08193. Tooling is the largest capital expense for high production casting projects. The lead time for tooling is often measured in months with a typical project taking 9-12 months to realize Production Part Approval Process (PPAP) ready die cast samples. This project demonstrated the technical viability of rapidly produced steel components for high pressure die casting tooling via Wire Arc Additive Manufacturing (WAAM). A 410 stainless steel tool was redesigned and optimized with conformal cooling channels and additively manufactured. The finished tool was tested and used to produce over 4000 parts, which well surpassed expectations. A secondary objective was to evaluate the durability of multi-material additively manufactured (AM) components with conformal cooling. A large multi-material tool (H13 and 410SSNiMo) was manufactured using the same methods showing potential reductions in used material and cost. However, the H13 section sustained material cracking. Further analysis showed that the potential cause was the CTE mismatch of the two materials at higher temperatures. It is also suggested that the material mix can be used if the steel processing temperature does not exceed 600 ̊C.This project has shown high potential for using the WAAM technology for creating AM parts for aluminum dies casting. However, the multi-material approach requires extended study and tests.

99 GENERAL AND MISCELLANEOUS

Wire Arc Additive Manufacturing of Lightweight High Pressure Die Casting Tooling

Oak Ridge National Laboratory (ORNL) and Mercury Marine partnered to develop and test methods for additively manufactured tooling for aluminum die casting applications under CRADA agreement NFE- 20-08193. Tooling is the largest capital expense for high production casting projects. The lead time for tooling is often measured in months with a typical project taking 9-12 months to realize Production Part Approval Process (PPAP) ready die cast samples. This project demonstrated the technical viability of rapidly produced steel components for high pressure die casting tooling via Wire Arc Additive Manufacturing (WAAM). A 410 stainless steel tool was redesigned and optimized with conformal cooling channels and additively manufactured. The finished tool was tested and used to produce over 4000 parts, which well surpassed expectations. A secondary objective was to evaluate the durability of multi-material additively manufactured (AM) components with conformal cooling. A large multi-material tool (H13 and 410SSNiMo) was manufactured using the same methods showing potential reductions in used material and cost. However, the H13 section sustained material cracking. Further analysis showed that the potential cause was the CTE mismatch of the two materials at higher temperatures. It is also suggested that the material mix can be used if the steel processing temperature does not exceed 600 ˚C. This project has shown high potential for using the WAAM technology for creating AM parts for aluminum dies casting. However, the multi-material approach requires extended study and tests.

36 MATERIALS SCIENCE