Determination of a Generic Human Error Probability Distribution, Part 1: A Dynamic Formulation of SPAR-H
In almost all major nuclear power plants (NPP) events include a significant human error component. As an example, in Fukushima Daiichi (2011) nuclear meltdown, the human actions related to the high-pressure injection cooling strongly affected accident evolution. Furthermore, in the Three Mile Island accident (1979) (which was initiated by a stuck open valve and thus was triggered a loss of coolant accident) the unit operators made decisions based upon false assumptions that contributed negatively to the accident. Given these premises, the ability to accurately model human interactions with plant evolution and, in particular, dynamically calculate human error probability (HEP) plays a major role in a probabilistic risk analysis (PRA). Human reliability analysis (HRA) identifies and models the causes of human errors, and quantifies HEP by applying different methodologies. HRA methods identify errors and reflect on the understanding of error-prone people and systems. There are a number of HRA methods available that assist in identifying the vulnerabilities in the system and provide guidance in determining the HEP. HEP is the probability of a human failure event (HFE), and quantification of HEPs under various situations is utilized in PRA of large complex systems. One of the more prominent HRA methods is the Standardized Plant Analysis Risk-Human Reliability Analysis (SPAR-H) method that was developed to estimate HEPs for the use in the Standardized Plant Analysis Risk (SPAR) PRA models employed in U.S. NPPs. SPAR-H is implemented in U.S. NPPs by regulators at the U.S. Nuclear Regulatory Commission (NRC) to determine the HEP based on expert estimation through the use of calculation worksheets. In SPAR-H, the nominal HEPs (NHEPs) are multiplied by performance shaping factors (PSF) multiplier values to obtain the overall error probability. PSFs encompass the human components, individual characteristics, their environment, and aspects of the task. With PSFs, the goal is to capture all factors that can affect human performance. In SPAR-H there are eight PSFs used, each having respective levels corresponding to multipliers: Available Time, Stress/Stressors, Complexity, Experience/Training, Procedures, Ergonomics/Human Machine Interface, Fitness for Duty, and Work Processes. The PSF multipliers indicate enhanced, nominal, or degraded human performance. The SPAR-H method estimates the HEP through multiplying a NHEP with PSFs. Hence, SPAR-H is a traditional HRA method that assesses human performance at a fixed, or static, point in time. In a dynamic HRA framework, human performance is assessed on a continuous time basis. SPAR-H can be used within a dynamic PRA framework through the use of simulation and stochastic models. The goal of dynamic HRA is to build a more realistic model of the human-system interaction to enhance calculation of reliability, risk and safety analysis. The progression of events in dynamic SPAR-H considers that some PSFs may experience gradual change, while other change can be sudden due to individualistic differences or rapid plant status changes. The PSF changes are caused by contextual changes in the scenario. For example, as more time passes, the realization that a task should be completed sooner may cause the operator more stress. In another example, a sudden relay of information about sickness of a family member may alter the operator's general stress level and fitness for duty. Each PSF has a different dynamic nature; PSFs like stress and complexity change more quickly over the course of a task than experience and training. While the experience of an operator changes over the course of attaining the objective, the amount that this added experience changes the HEP is very minimal. In contrast, the stress, complexity, and procedures PSFs may change quite a bit over the course of task completion.
DYNAMIC PRA OF A MULTI-UNIT PLANT
Dynamic Probabilistic Risk Analysis (PRA) methods couple stochastic methods (e.g., RAVEN, ADAPT, ADS, MCDET) with safety analysis codes (RELAP5-3D, MELCOR, MAAP) to determine risk associated to complex systems such as nuclear plants. Compared to classical PRA methods, which are based on static logic structures (e.g., Event-Trees, Fault-Trees), they can evaluate with higher resolution the safety impact of timing and sequencing of events on the accident progression. Recently, special attention has been given to nuclear plants which consist of multiple units and, in particular, on the safety impact of system dependencies, shared systems and common resources on core damage frequencies. In the literature, while classical PRA methods have been employed to model multi-unit plants, Dynamic PRA methods have never been applied to analyze a full multi-unit model. This paper presents a PRA analysis of a multi-unit plant using Dynamic PRA methods. We employ RAVEN as stochastic method coupled with RELAP5-3D. The plant under consideration consists of the three units and their associated spent fuel pools (SFPs). The studied initiating event is a seismic induced station blackout event. We will describe in detail how the multi-unit plant has been constructed and, in particular, how unit dependencies and shared resources are modeled.
AN UPDATED ECONOMIC MODEL FOR LEVEL-3 PRA CONSEQUENCE ANALYSIS USING MACCS2.
Abstract not provided.
MEASURING RISK IMPORTANCE IN A DYNAMIC PRA FRAMEWORK
Risk importance measures are indexes that are used to rank systems, structures and components (SSCs) using risk-informed methods. The most used/known measures are: Risk Reduction Worth (RRW), Risk Achievement Worth (RAW), Birnbaum (B) and Fussell-Vesely (FV). Once obtained from classical Probabilistic Risk Analysis (PRA) analyses, these risk measures can be effectively employed to optimize component testing and maintenance. In contrast to classical PRA methods, Dynamic PRA methods couple stochastic methods with safety analysis codes to determine risk associate to complex systems such as nuclear plants. Compared to classical PRA methods, they can evaluate with higher resolution the safety impact of timing and sequencing of events on the accident progression. The objective of this paper is to present a series of algorithms that can be used to determine classical risk importance measures (RRW, RAW, B and FV) along with newly developed ones from a Dynamic PRA analysis.
SAPHIRE 8 Software Project Plan
This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: • Incorporation of SPAR models for the SDP interface. • Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. • Continue the current activities for code maintenance, documentation, and user support for the code.
Hazard and risk analysis framework for nuclear power plant–based integrated energy systems
Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.
Probabilistic risk analysis toward cost-effective 3S (safety, safeguards, security) implementation
Probabilistic Risk Analysis (PRA) has been introduced for several decades in safety and nuclear advanced countries have already used this methodology in their own regulatory systems. However, PRA has not been developed in safeguards and security so far because of inherent difficulties in intentional and malicious acts. In this paper, probabilistic proliferation and risk analysis based on random process is applied to hypothetical reprocessing process and physical protection system in nuclear reactor with the Markov model that was originally developed by the Proliferation Resistance and Physical Protection Working Group (PRPPWG) in Generation IV International Framework (GIF). Through the challenge to quantify the security risk with a frequency in this model, integrated risk notion among 3S to pursue the cost-effective installation of those countermeasures is discussed in a heroic manner.
Reduced Order Model Implementation in the Risk-Informed Safety Margin Characterization Toolkit
The RISMC project aims to develop new advanced simulation-based tools to perform Probabilistic Risk Analysis (PRA) for the existing fleet of U.S. nuclear power plants (NPPs). These tools numerically model not only the thermo-hydraulic behavior of the reactor primary and secondary systems but also external events temporal evolution and components/system ageing. Thus, this is not only a multi-physics problem but also a multi-scale problem (both spatial, µm-mm-m, and temporal, ms-s-minutes-years). As part of the RISMC PRA approach, a large amount of computationally expensive simulation runs are required. An important aspect is that even though computational power is regularly growing, the overall computational cost of a RISMC analysis may be not viable for certain cases. A solution that is being evaluated is the use of reduce order modeling techniques. During the FY2015, we investigated and applied reduced order modeling techniques to decrease the RICM analysis computational cost by decreasing the number of simulations runs to perform and employ surrogate models instead of the actual simulation codes. This report focuses on the use of reduced order modeling techniques that can be applied to any RISMC analysis to generate, analyze and visualize data. In particular, we focus on surrogate models that approximate the simulation results but in a much faster time (µs instead of hours/days). We apply reduced order and surrogate modeling techniques to several RISMC types of analyses using RAVEN and RELAP-7 and show the advantages that can be gained.
Linking classical PRA models to a dynamic PRA
Here, this paper presents a series of methods designed to incorporate classical Probabilistic Risk Assessment (PRA) models such as Event Trees (ETs) and Fault Trees (FTs) into dynamic PRA. In contrast to classical PRA, dynamic PRA couples stochastic methods with system simulators to determine the risks associated with complex systems such as nuclear power plants. Compared with classical PRA methods, they can evaluate with higher resolution the safety impact of timing and sequencing of events on the progression of the accident. As part of a dynamic PRA analysis, it is not uncommon that parts of the system to be analyzed might not require a computationally expensive simulation model. These parts could be in fact modeled by employing classical PRA models (e.g., a FT). Here, we present a set of methods and tools that can be used to link the most common classical PRA models (ETs, FTs, reliability block diagrams and Markov models) to simulation codes such as RELAP5-3D: creating a “hybrid PRA.” In order to show the potential of such an hybrid PRA we employ this method to verify ET modeling assumptions (e.g., success criteria) using a large break loss of coolant accident initiating event as a test case. In this respect, we link a set of FTs from the original PRA to the RELAP5-3D code and perform a hybrid PRA. The FTs are employed to model the control logic of several safety systems and to propagate component failures throughout the system. Provided the generated dynamic PRA data, we show how conservative assumptions in the original PRA can be identified and how such original PRA can be modified by updating success criteria captured by the set of RELAP5-3D simulation runs.
RAVEN AS A TOOL FOR DYNAMIC PROBABILISTIC RISK ASSESSMENT: SOFTWARE OVERVIEW
RAVEN is a software tool under development at the Idaho National Laboratory (INL) that acts as the control logic driver and post-processing tool for the newly developed Thermo-Hydraylic code RELAP- 7. The scope of this paper is to show the software structure of RAVEN and its utilization in connection with RELAP-7. A short overview of the mathematical framework behind the code is presented along with its main capabilities such as on-line controlling/monitoring and Monte-Carlo sampling. A demo of a Station Black Out PRA analysis of a simplified Pressurized Water Reactor (PWR) model is shown in order to demonstrate the Monte-Carlo and clustering capabilities.
Conversion of Questionnaire Data
During the survey, respondents are asked to provide qualitative answers (well, adequate, needs improvement) on how well material control and accountability (MC&A) functions are being performed. These responses can be used to develop failure probabilities for basic events performed during routine operation of the MC&A systems. The failure frequencies for individual events may be used to estimate total system effectiveness using a fault tree in a probabilistic risk analysis (PRA). Numeric risk values are required for the PRA fault tree calculations that are performed to evaluate system effectiveness. So, the performance ratings in the questionnaire must be converted to relative risk values for all of the basic MC&A tasks performed in the facility. If a specific material protection, control, and accountability (MPC&A) task is being performed at the 'perfect' level, the task is considered to have a near zero risk of failure. If the task is performed at a less than perfect level, the deficiency in performance represents some risk of failure for the event. As the degree of deficiency in performance increases, the risk of failure increases. If a task that should be performed is not being performed, that task is in a state of failure. The failure probabilities of all basic events contribute to the total system risk. Conversion of questionnaire MPC&A system performance data to numeric values is a separate function from the process of completing the questionnaire. When specific questions in the questionnaire are answered, the focus is on correctly assessing and reporting, in an adjectival manner, the actual performance of the related MC&A function. Prior to conversion, consideration should not be given to the numeric value that will be assigned during the conversion process. In the conversion process, adjectival responses to questions on system performance are quantified based on a log normal scale typically used in human error analysis (see A.D. Swain and H.E. Guttmann, 'Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications,' NUREG/CR-1278). This conversion produces the basic event risk of failure values required for the fault tree calculations. The fault tree is a deductive logic structure that corresponds to the operational nuclear MC&A system at a nuclear facility. The conventional Delphi process is a time-honored approach commonly used in the risk assessment field to extract numerical values for the failure rates of actions or activities when statistically significant data is absent.
Analysis of VTR Primary Pump Coastdown
Simulations were performed to evaluate how different flow coastdown rates impact transient results. These simulations were performed with a preliminary SAS4A/SASSYS-1 model of the VTR to assess the advantages and disadvantages of delaying a pump trip following a control rod scram. When the control rods are inserted into the core by the reactor protection system, fission power will drop quickly. Pumps should be tripped soon after to avoid decreasing the power-to-flow ratio too much and preventing thermal shock of components in and above the core. The primary motivation for this report is characterizing the temperatures of these components with various delays between the control rods scramming and the primary pumps tripping. In the simulations with a control rod scram and a delayed pump trip, even if one of the pump coastdown mechanisms fails, a faster pump trip and coastdown is preferable. This can be achieved both by shortening the delay between the scram and trip as well as by decreasing the inertia provided by the coastdown mechanism. Based on the results of these simulations, there is no benefit to delaying when the pumps trip following a control rod scram. In other scenarios, however, a slow flow coastdown rate is preferable. Results from unprotected loss of flow simulations are presented to demonstrate that a slower coastdown reduces how much temperatures increase within the core. An initial flow halving time of between five and seven seconds was predicted to produce peak in-core temperatures with sufficient margins to the limiting criteria. For halving times less than five seconds, peak temperatures significantly reduce margins. For halving times greater than seven seconds in the unprotected loss of flow cases, the resulting peak temperatures are lower, but this leads to unfavorable results for the previous cases with a control rod scram. In order to achieve an acceptable balance between cases with and without a preceding control rod scram, the results presented in this report support an initial flow halving time in the five-to-seven second range, although ongoing PRA analysis could produce results that support a coastdown beyond this range.
Nuclear safety Enhanced: A Deep dive into current and future RAVEN applications
As the horizon of nuclear energy expands with the advent of small modular reactors, IV generation reactors, and fusion reactors, there is a growing perspective that the licensing process could benefit from a more comprehensive approach. Moving beyond traditional deterministic and PRA analysis might pave the way for a novel safety analysis paradigm propelled by the increasing computational power at our disposal. This paper explores different methodologies that can improve the outcomes of nuclear safety analysis. These range from uncertainty quantification techniques, aimed at enhancing the precision of safety margins, to deploying dynamic event trees by driving system code simulations, capturing the potential evolutions of severe accidents. These methodologies introduce innovative dimensions to safety analysis, considering the consequences of postulated events and the dynamics of accident sequences. However, they also bring forth challenges, especially in managing the complexity and sheer volume of potential scenarios. The paper touches upon some strategies to counter these challenges, emphasizing the importance of adaptability and continuous evolution in the face of emerging nuclear safety concerns. Additionally, the paper sheds light on the need for advanced tools to apply these methodologies. Among these tools is RAVEN, an open-source software designed for parametric and probabilistic analyses. Its core components, including distribution, sampler, and reduced order model, enable various applications, from risk assessment and mitigation to dynamic learning and plant control logic simulations.
Decision Analysis Methods For the Analysis of Nuclear Terrorism Threats with Imperfect Information
Protection of commercial nuclear fuel cycles against adversary groups who may attempt to steal weapons-usable material is an issue of interest to the U.S. Department of Energy, Office of Nuclear Energy. The wide array of potential nuclear fuel cycle configurations and the security measures that could be deployed to protect them pose a daunting system design problem. In general, there are billions of potential design configurations. Moreover, the design choices are not independent – the effectiveness of one design feature or security measure can affect the desirability of other design choices. To explore this issue, we develop a mixed-integer optimization problem that solves a complex decision tree to allocate security resources across a commercial nuclear fuel cycle configuration. A nominal UREX+ reprocessing facility is used to demonstrate how the model allocates resources across a particular fuel cycle facility and shows how the problem can be scaled up to include other facilities and design features in the fuel cycle. In our model, the defender first chooses a set of safeguards to implement in order to mitigate the risk of a terrorist theft from various unit operations in the reprocessing facility. The attacker observes the defender’s strategy choice and executes an attack to acquire material, including the possibility of declining to attack at all. The model considers the terrorist as an intelligent adversary with a set of attack strategies known to the defender. The strategic choices made by both the defender and attacker affect the probability of a successful attack by the terrorist and in turn affect the distribution of consequences to the defender. We use a decision tree to illustrate the interactions among costs, decisions, correlated uncertainties, and outcomes, and then show how to formulate the problem as a mixed-integer program with an equivalent solution. The novel features of our formulation include the following. First, as discussed above, we use a sequential game-theoretic formulation (a Stackelberg game). This formulation assumes the attacker can observe the defender’s actions before the attack is executed. Many previous game-theoretic studies have assumed attacker and defender act simultaneously without knowledge of the other’s strategy choice. We believe the sequential game formulation is more applicable for knowledgeable insider adversaries, the focus of this study. Second, we build on our previous work that has developed a methodology to reflect the correlation among probability distributions represented as discrete chance nodes in a decision tree. We illustrate how this methodology can be applied to two chance nodes in a decision tree that relate the quality of the materials that might be stolen or diverted by an adversary with the yield of a weapon that might be constructed from that material. In a decision tree, the dependence of the yield on the quality of the material could be modeled with conditional probabilities of the weapon yield given the quality of the materials obtained. For three outcome discretizations, this would require the assessment of nine conditional probabilities from domain experts as part of the model building effort. In contrast, our methodology will allow this same representation of the tree based on the assessment of the correlation between these two chance nodes by the experts, which we believe is a much easier and more reliable assessment task. The advantage of this approach increases as the number of dependent chance nodes grows in a decision tree representation of this problem. Third, we extend this approach to the approximation of the dependence between discrete binary events such as success or failure represented by binary chance nodes in a decision tree or in the special case of a probabilistic risk analysis (PRA) based on an event tree. This extension is a novel application in this domain, and uses Monte Carlo simulation to determine the appropriate conditional probabilities on the binary chance nodes when the number of correlated uncertainties is more than two. Fourth, we show how these decision trees or probability trees can be formulated and solved as equivalent integer programming (IP) problems. The advantages of the IP representation include the opportunity to use the computing power associated with powerful optimization solver algorithms available on high speed computers to solve very large versions of these trees, and the ability to include several such models of different facilities into a much larger IP with connecting constraints that represent budget restrictions, number of available inspection opportunities in a given time window, or other dependencies among these facilities. Policy makers can use the resulting model to inform their decisions about how to assess terrorism risk and to safeguard the commercial nuclear fuel cycle.
Resilient Grid Operational Strategies
Extreme weather-related disturbances, such as hurricanes, are a leading cause of grid outages historically. Although physical asset hardening is perhaps the most common way to mitigate the impacts of severe weather, operational strategies may be deployed to limit the extent of societal and economic losses associated with weather-related physical damage.1 The purpose of this study is to examine bulk power-system operational strategies that can be deployed to mitigate the impact of severe weather disruptions caused by hurricanes, thereby increasing grid resilience to maintain continuity of critical infrastructure during extreme weather. To estimate the impacts of resilient grid operational strategies, Los Alamos National Laboratory (LANL) developed a framework for hurricane probabilistic risk analysis (PRA). The probabilistic nature of this framework allows us to estimate the probability distribution of likely impacts, as opposed to the worst-case impacts. The project scope does not include strategies that are not operations related, such as transmission system hardening (e.g., undergrounding, transmission tower reinforcement and substation flood protection) and solutions in the distribution network.
UKy-CAER Heat Integrated Transformative CO 2 Capture Process in Pulverized Coal Power Plants
The goal of this Phase II Topical Report is to summarize the work for public domain conducted on project DE-FE0031583. Building upon the Design Basis completed during Phase I and in accordance with the Statement of Project Objectives (SOPO), the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) along with team members has completed the Front End Engineering Design (FEED) for its advanced, versatile post-combustion CO 2 capture system (CCS) at the 10 MWe large pilot scale to be installed at the Wyoming (WY) Integrated Test Center (ITC), using a heat integrated process with split-rich fed, two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance and lower the cost of CO 2 capture. The proposed project (Phases I-III) involves the design, fabrication, installation, testing and evaluation of a large pilot scale facility that will demonstrate the UK CAER transformative CCS integrated with an operating power plant. The work performed in Phase I, detailed in the Phase I Topical Report that was submitted in March 2019, included formation of a project team, securing the host site, and completing pre-FEED design basis, a cost estimation, a preliminary techno-economic analysis (TEA) and an environmental information volume (EIV). The work performed in Phase II, detailed in this Phase II Topical Report, includes completion of FEEDs, completion of a process risk analysis (PRA), obtaining necessary permits, updating the EIV and TEA, updating the cost and schedule estimate for the Phase III scope of work (SOW) and securing the necessary cost share. Updated information is provided on the current status of the UK CAER CCS technology and the project is ready to begin immediately detailed design, construction and operation of the proposed pilot.
High Energy Arcing Fault (HEAF): Sandia National Laboratories 2023 Report
High Energy Arcing Faults (HEAFs) are hazardous events in which an electrical arc leads to the rapid release of energy in the form of heat, vaporized metal, and mechanical force. In Nuclear Power Plants (NPPs), these events are often accompanied by loss of essential power and complicated shutdowns. To confirm the probabilistic risk analysis (PRA) methodology in NUREG/CR-6850, which was formulated based on limited observational data, the NRC led an international experimental campaign from 2014 to 2016. The results of these experiments uncovered an unexpected hazard posed by aluminum components in or near electrical equipment and the potential for unanalyzed equipment failures. Sandia National Laboratories (SNL), in support of the NRC work, collaborated with NIST, BSI, KEMA, and NRC to support the full-scale HEAF test campaign in 2023. SNL provided high speed and real time from visible and infrared video/data of tests that collected data from copper and aluminum busses from switchgears and bus-ducts. Part of SNL work was to place cameras with high-speed data collection capability at different vantage points that provide the NRC a more complete and granular view of the test events.