Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRAS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Probabilistic Resource Adequacy Suite (PRAS)

Powered By PRAS features the Probabilistic Resource Adequacy Suite (PRAS), an open-source, research-oriented collection of tools for analyzing the resource adequacy of bulk power systems. PRAS performs low-fidelity, high-speed simulations of multi-region power system operations, considering hundreds of thousands of years of unplanned resource outages to quantify the risk and potential nature of energy supply shortfalls in probabilistic terms.

demand↗

Materials Data on PrAs by Materials Project

PrAs is Halite, Rock Salt structured and crystallizes in the cubic Fm-3m space group. The structure is three-dimensional. Pr3+ is bonded to six equivalent As3- atoms to form a mixture of corner and edge-sharing PrAs6 octahedra. The corner-sharing octahedral tilt angles are 0°. All Pr–As bond lengths are 3.05 Å. As3- is bonded to six equivalent Pr3+ atoms to form a mixture of corner and edge-sharing AsPr6 octahedra. The corner-sharing octahedral tilt angles are 0°.

36 MATERIALS SCIENCE↗

Materials Data on PrAs by Materials Project

PrAs is Tetraauricupride structured and crystallizes in the tetragonal P4/mmm space group. The structure is three-dimensional. Pr3+ is bonded in a body-centered cubic geometry to eight equivalent As3- atoms. All Pr–As bond lengths are 3.22 Å. As3- is bonded in a body-centered cubic geometry to eight equivalent Pr3+ atoms.

36 MATERIALS SCIENCE↗

CSR in the Probabilistic Resource Adequacy Suite (PRAS): Fast Interregional Transmission Models for Renewable Integration Studies

NREL's Probabilistic Resource Adequacy Suite (PRAS) was developed for use in renewable integration studies, to assess the resource adequacy of large interconnected power systems with potentially significant interregional transfers of power. This presentation provides an overview of the tool and the methods it uses to solve multi-regional transmission and storage dispatch problems in a computationally-efficient manner.

composite system reliability↗

Probabilistic Resource Adequacy Suite (PRAS)

The Probabilistic Resource Adequacy Suite (PRAS) provides an open-source, research-oriented collection of tools for analysing the resource adequacy of a bulk power system. The simulation methods offered support everything from classical convolution-based analytical techniques through to high-performance sequential Monte Carlo methods supporting multi-region composite reliability assessment, including simulation of energy-limited resources such as storage.

Stephen, Gord↗

Probabilistic Resource Adequacy Suite (PRAS) v0.6 Model Documentation

The Probabilistic Resource Adequacy Suite, or PRAS, is a software package for studying power system resource adequacy. It allows the user to simulate power system operations under a wide range of operating conditions, in order to study the system’s risk of failing to meet demand due to a resource shortfall, and identify the time periods and regions in which that risk occurs. This reports documents version 0.6 of the tool.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Resource Adequacy Suite (PRAS) v0.8 Model Documentation

The Probabilistic Resource Adequacy Suite, or PRAS, is a software package for studying power system resource adequacy. It allows the user to simulate power system operations under a wide range of operating conditions, in order to study the system's risk of failing to meet demand due to a resource shortfall, and identify the time periods and regions in which that risk occurs. This reports documents version 0.8 of the tool.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Treatment of uncertainties associated with PRAs in risk-informed decision making (NUREG1855).

This document provides guidance on how to treat uncertainties associated with probabilistic risk assessment (PRA) in risk-informed decisionmaking. The objectives of this guidance include fostering an understanding of the uncertainties associated with PRA and their impact on the results of PRA and providing a pragmatic approach to addressing these uncertainties in the context of the decisionmaking. In implementing risk-informed decisionmaking, the U.S. Nuclear Regulatory Commission expects that appropriate consideration of uncertainty will be given in the analyses used to support the decision and in the interpretation of the findings of those analyses. To meet the objective of this document, it is necessary to understand the role that PRA results play in the context of the decision process. To define this context, this document provides an overview of the risk-informed decisionmaking process itself. With the context defined, this document describes the characteristics of a risk model and, in particular, a PRA. This description includes recognition that a PRA, being a probabilistic model, characterizes aleatory uncertainty that results from randomness associated with the events of the model. Because the focus of this document is epistemic uncertainty (i.e., uncertainties in the formulation of the PRA model), it provides guidance on identifying and describing the different types of sources of epistemic uncertainty and the different ways that they are treated. The different types of epistemic uncertainty are parameter, model, and completeness uncertainties. The final part of the guidance addresses the uncertainty in PRA results in the context of riskinformed decisionmaking and, in particular, the interpretation of the results of the uncertainty analysis when comparing PRA results with the acceptance criteria established for a specified application. In addition, guidance is provided for addressing completeness uncertainty in risk-informed decision making. Such consideration includes using a program of monitoring, feedback, and corrective action.

99 GENERAL AND MISCELLANEOUS↗

Managing Solar Photovoltaic Integration in the Western United States: Resource Adequacy Considerations

This study examines the impact of reserve margin-based reliability assessment, as commonly used in capacity expansion models, on planning resource-adequate power systems under high penetrations of solar photovoltaics (PV). As a generation resource, PV is operationally different from the conventional dispatchable resources for which most capacity expansion models were designed. The question this study attempts to answer is whether large amounts of PV on a system (in this case, the Western Interconnection of North America) would bias the results of conventional reserve margin-based capacity expansion modeling towards an over- or under-provisioning of resource adequacy. This analysis used NREL’s Resource Planning Model (RPM) for capacity expansion modeling and NREL’s Probabilistic Resource Adequacy Suite (PRAS) for resource adequacy assessment. RPM uses a reserve margin requirement to enforce resource adequacy. PRAS, a collection of tools for studying the resource adequacy of power systems and the adequacy contributions of individual resources on a probabilistic basis, was used to compute multiple resource adequacy metrics across a number of simulated scenarios and system representations with differing regional detail. In all cases, including high PV penetrations (up to 33% annual generation from PV, interconnection-wide), RPM was able to produce resource-adequate systems as measured by normalized expected unserved energy and loss-of-load expectation results from PRAS. The accuracy of reserve margin approaches depends heavily on the underlying assumptions informing the capacity credit assigned to variable and energy-limited resources, particularly when such resources are abundant in the modeled system. RPM’s standard methodology for estimating variable and flexible resources’ capacity contributions, which is based on the top 100 hours of net load, did not appear to systematically undervalue or overvalue variable generation relative to a more rigorous equivalent firm capacity assessment using PRAS, although both over- and under-valuations were observed in specific scenarios. In the worst cases, the top 100 hour method underestimated the equivalent firm capacity of PV by two percentage points, and overestimated the equivalent firm capacity of PV by five percentage points. Calculating capacity contributions based on the top 10 hours of net load systematically underestimated equivalent firm capacities at more modest PV penetrations, but was often a better approximation of equivalent firm capacity than the existing 100-hour approach in scenarios with higher PV penetrations.

14 SOLAR ENERGY↗

Development and application of the dynamic system doctor to nuclear reactor probabilistic risk assessments.

This LDRD project has produced a tool that makes probabilistic risk assessments (PRAs) of nuclear reactors - analyses which are very resource intensive - more efficient. PRAs of nuclear reactors are being increasingly relied on by the United States Nuclear Regulatory Commission (U.S.N.R.C.) for licensing decisions for current and advanced reactors. Yet, PRAs are produced much as they were 20 years ago. The work here applied a modern systems analysis technique to the accident progression analysis portion of the PRA; the technique was a system-independent multi-task computer driver routine. Initially, the objective of the work was to fuse the accident progression event tree (APET) portion of a PRA to the dynamic system doctor (DSD) created by Ohio State University. Instead, during the initial efforts, it was found that the DSD could be linked directly to a detailed accident progression phenomenological simulation code - the type on which APET construction and analysis relies, albeit indirectly - and thereby directly create and analyze the APET. The expanded DSD computational architecture and infrastructure that was created during this effort is called ADAPT (Analysis of Dynamic Accident Progression Trees). ADAPT is a system software infrastructure that supports execution and analysis of multiple dynamic event-tree simulations on distributed environments. A simulator abstraction layer was developed, and a generic driver was implemented for executing simulators on a distributed environment. As a demonstration of the use of the methodological tool, ADAPT was applied to quantify the likelihood of competing accident progression pathways occurring for a particular accident scenario in a particular reactor type using MELCOR, an integrated severe accident analysis code developed at Sandia. (ADAPT was intentionally created with flexibility, however, and is not limited to interacting with only one code. With minor coding changes to input files, ADAPT can be linked to other such codes.) The results of this demonstration indicate that the approach can significantly reduce the resources required for Level 2 PRAs. From the phenomenological viewpoint, ADAPT can also treat the associated epistemic and aleatory uncertainties. This methodology can also be used for analyses of other complex systems. Any complex system can be analyzed using ADAPT if the workings of that system can be displayed as an event tree, there is a computer code that simulates how those events could progress, and that simulator code has switches to turn on and off system events, phenomena, etc. Using and applying ADAPT to particular problems is not human independent. While the human resources for the creation and analysis of the accident progression are significantly decreased, knowledgeable analysts are still necessary for a given project to apply ADAPT successfully. This research and development effort has met its original goals and then exceeded them.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Applications of the International Space Station Probabilistic Risk Assessment Model

Recently the International Space Station (ISS) has incorporated more Probabilistic Risk Assessments (PRAs) in the decision making process for significant issues. Future PRAs will have major impact to ISS and future spacecraft development and operations. These PRAs will have their foundation in the current complete ISS PRA model and the current PRA trade studies that are being analyzed as requested by ISS Program stakeholders. ISS PRAs have recently helped in the decision making process for determining reliability requirements for future NASA spacecraft and commercial spacecraft, making crew rescue decisions, as well as making operational requirements for ISS orbital orientation, planning Extravehicular activities (EVAs) and robotic operations. This paper will describe some applications of the ISS PRA model and how they impacted the final decision. This paper will discuss future analysis topics such as life extension, requirements of new commercial vehicles visiting ISS.

Grant, Warren↗

RELIABILITY MODELS OF AGING PASSIVE COMPONENTS INFORMED BY MATERIALS DEGRADATION METRICS TO SUPPORT LONG-TERM REACTOR OPERATIONS

Paper describes a methodology for the synthesis of nuclear power plant service data with expert-elicited materials degradation information to estimate the future failure rates of passive components. This method should be an important resource to long-term plant operations and reactor life extension. Conventional probabilistic risk assessments (PRAs) are not well suited to addressing long-term reactor operations. Since passive structures and components are among those for which replacement can be least practical, they might be expected to contribute increasingly to risk in an aging plant; yet, passives receive limited treatment in PRAs. Furthermore, PRAs produce only snapshots of risk based on the assumption of time-independent component failure rates. This assumption is unlikely to be valid in aging systems. The treatment of aging passive components in PRA presents challenges. Service data to quantify component reliability models are sparse, and this is exacerbated by the greater data demands of age-dependent reliability models. Another factor is that there can be numerous potential degradation mechanisms associated with the materials and operating environment of a given component. This deepens the data problem since risk-informed management of component aging will demand an understanding of the long-term risk significance of individual degradation mechanisms. In this paper we describe a Bayesian methodology that integrates metrics of materials degradation susceptibility with available plant service data to estimate age-dependent passive component reliabilities. Integration of these models into conventional PRA will provide a basis for materials degradation management informed by predicted long-term operational risk.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Review of Quantitative Software Reliability Methods

The current U.S. Nuclear Regulatory Commission (NRC) licensing process for digital systems rests on deterministic engineering criteria. In its 1995 probabilistic risk assessment (PRA) policy statement, the Commission encouraged the use of PRA technology in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data. Although many activities have been completed in the area of risk-informed regulation, the risk-informed analysis process for digital systems has not yet been satisfactorily developed. Since digital instrumentation and control (I&C) systems are expected to play an increasingly important role in nuclear power plant (NPP) safety, the NRC established a digital system research plan that defines a coherent set of research programs to support its regulatory needs. One of the research programs included in the NRC's digital system research plan addresses risk assessment methods and data for digital systems. Digital I&C systems have some unique characteristics, such as using software, and may have different failure causes and/or modes than analog I&C systems; hence, their incorporation into NPP PRAs entails special challenges. The objective of the NRC's digital system risk research is to identify and develop methods, analytical tools, and regulatory guidance for (1) including models of digital systems into NPP PRAs, and (2) using information on the risks of digital systems to support the NRC's risk-informed licensing and oversight activities. For several years, Brookhaven National Laboratory (BNL) has worked on NRC projects to investigate methods and tools for the probabilistic modeling of digital systems, as documented mainly in NUREG/CR-6962 and NUREG/CR-6997. However, the scope of this research principally focused on hardware failures, with limited reviews of software failure experience and software reliability methods. NRC also sponsored research at the Ohio State University investigating the modeling of digital systems using dynamic PRA methods. These efforts, documented in NUREG/CR-6901, NUREG/CR-6942, and NUREG/CR-6985, included a functional representation of the system's software but did not explicitly address failure modes caused by software defects or by inadequate design requirements. An important identified research need is to establish a commonly accepted basis for incorporating the behavior of software into digital I&C system reliability models for use in PRAs. To address this need, BNL is exploring the inclusion of software failures into the reliability models of digital I&C systems, such that their contribution to the risk of the associated NPP can be assessed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Expansion of Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Electrolysis Hydrogen Production Plants

This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Power Operation and Generation (FPOG) program that presented generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors to support the co-location of a high temperature hydrogen electrolysis facility (HTEF). Probabilistic and deterministic hazards assessments and risk analyses are leveraged throughout this report. Several improvements and new analyses are included in this report. First, higher amounts of detail in the specifications of the generic HTEFs are used to produce scaled results for a 100, 500, and 1000 MW nominal hydrogen production facility. An additional hazard assessment of 1000 kg of hydrogen storage is performed. The facility hazards and footprint are assessed to determine the safe distance required for placement near the nuclear power plant (NPP). Second, specific designs for corresponding HESs for the different levels of support required by the HTEFs are analyzed in the PRA model. Third, a hazards analysis of the specified HTEFs leads not only to effects of the quantified risk assessment for the NPP, but also qualitative hazards assessment for the community. Finally, a seismic analysis and a high winds analysis have each been added to the PRA. The results investigate the applicability of the potential licensing approaches which do not require a full United States (U.S.) Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic and include listed assumptions. The HTEF design built for this project has further eliminated many conservative assumptions from the prior PRAs in this series. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 7.7%. The PRA results for core damage frequency and large early release frequency support the use of NRC Regulation Guide 1.174 as further risk information that supports a change without a full licensing amendment review. The hazard analyses and PRA confirm the need for engineered blast barriers of storage tanks and the common production header leaving the HTEF. The hazards analyses and PRA also confirm with high confidence that using the assumptions of design in this report that the safety case for licensing an HES addition and an HTEF sited with its unprotected high-pressure stage components 187 meters from the NPP’s transmission towers (the most fragile structure, system, and component) is strong.

08 HYDROGEN↗

PRA (Probabilistic Risk Assessments) Participation versus Validation

Probabilistic Risk Assessments (PRAs) are performed for projects or programs where the consequences of failure are highly undesirable. PRAs primarily address the level of risk those projects or programs posed during operations. PRAs are often developed after the design has been completed. Design and operational details used to develop models include approved and accepted design information regarding equipment, components, systems and failure data. This methodology basically validates the risk parameters of the project or system design. For high risk or high dollar projects, using PRA methodologies during the design process provides new opportunities to influence the design early in the project life cycle to identify, eliminate or mitigate potential risks. Identifying risk drivers before the design has been set allows the design engineers to understand the inherent risk of their current design and consider potential risk mitigation changes. This can become an iterative process where the PRA model can be used to determine if the mitigation technique is effective in reducing risk. This can result in more efficient and cost effective design changes. PRA methodology can be used to assess the risk of design alternatives and can demonstrate how major design changes or program modifications impact the overall program or project risk. PRA has been used for the last two decades to validate risk predictions and acceptability. Providing risk information which can positively influence final system and equipment design the PRA tool can also participate in design development, providing a safe and cost effective product.

DeMott, Diana↗

DEGRADATION SUSCEPTIBILITY METRICS AS THE BASES FOR BAYESIAN RELIABILITY MODELS OF AGING PASSIVE COMPONENTS AND LONG-TERM REACTOR RISK

Conventional probabilistic risk assessments (PRAs) are not well-suited to addressing long-term reactor operations. Since passive structures, systems and components are among those for which refurbishment or replacement can be least practical, they might be expected to contribute increasingly to risk in an aging plant. Yet, passives receive limited treatment in PRAs. Furthermore, PRAs produce only snapshots of risk based on the assumption of time-independent component failure rates. This assumption is unlikely to be valid in aging systems. The treatment of aging passive components in PRA does present challenges. First, service data required to quantify component reliability models are sparse, and this problem is exacerbated by the greater data demands of age-dependent reliability models. A compounding factor is that there can be numerous potential degradation mechanisms associated with the materials, design, and operating environment of a given component. This deepens the data problem since the risk-informed management of materials degradation and component aging will demand an understanding of the long-term risk significance of individual degradation mechanisms. In this paper we describe a Bayesian methodology that integrates the metrics of materials degradation susceptibility being developed under the Nuclear Regulatory Commission's Proactive Management of Materials of Degradation Program with available plant service data to estimate age-dependent passive component reliabilities. Integration of these models into conventional PRA will provide a basis for materials degradation management informed by the predicted long-term operational risk.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Developing new theoretical models of the formation of atomic collision cascades and subcascades in irradiated solids

A new theoretical model is developed for the investigation of atomic collision cascades and subcascades in irradiated solids consisting of atoms of a single type. The model is based on an analytical description of the elastic collisions between moving atoms knocked out of the crystal lattice sites and the immobile atoms of the lattice. The description is based on the linear kinetic Boltzmann equation describing the retardation of primary recoil atoms (PRAs) in irradiated solids. The laws of conservation for the total number and the kinetic energy of moving atoms, which follow from the kinetic Boltzmann equation, are analyzed using the proposed model. An analytical solution is obtained for the stationary kinetic Boltzmann equation, which describes the retardation of PRAs for a given source responsible for their production. A kinetic equation for the moving atoms and the corresponding laws of conservation are also analyzed with allowance for the binding energy of atoms at the crystal lattice sites. A criterion for determining the threshold energy of subcascade formation in irradiated solids is formulated. Based on this criterion, the threshold energy of subcascade formation is calculated using the Thomas-Fermi potential. Formulas are presented for determining the mean size and number of subcascades formed in a solid as functions of the PRA energy.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Top-down and bottom-up definitions of human failure events in human reliability analysis

In the probabilistic risk assessments (PRAs) used in the nuclear industry, human failure events (HFEs) are determined as a subset of hardware failures, namely those hardware failures that could be triggered by human action or inaction. This approach is top-down, starting with hardware faults and deducing human contributions to those faults. Elsewhere, more traditionally human factors driven approaches would tend to look at opportunities for human errors first in a task analysis and then identify which of those errors is risk significant. The intersection of top-down and bottom-up approaches to defining HFEs has not been carefully studied. Ideally, both approaches should arrive at the same set of HFEs. This question is crucial, however, as human reliability analysis (HRA) methods are generalized to new domains like oil and gas. The HFEs used in nuclear PRAs tend to be top-down—defined as a subset of the PRA—whereas the HFEs used in petroleum quantitative risk assessments (QRAs) often tend to be bottom-up—derived from a task analysis conducted by human factors experts. The marriage of these approaches is necessary in order to ensure that HRA methods developed for top-down HFEs are also sufficient for bottom-up applications.

02 PETROLEUM↗