Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRE-LAUNCH”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Evaluation of Anomaly Detection Capability for Ground-Based Pre-Launch Shuttle Operations

This chapter will provide a thorough end-to-end description of the process for evaluation of three different data-driven algorithms for anomaly detection to select the best candidate for deployment as part of a suite of IVHM (Integrated Vehicle Health Management) technologies. These algorithms were deemed to be sufficiently mature enough to be considered viable candidates for deployment in support of the maiden launch of Ares I-X, the successor to the Space Shuttle for NASA's Constellation program. Data-driven algorithms are just one of three different types being deployed. The other two types of algorithms being deployed include a "nile-based" expert system, and a "model-based" system. Within these two categories, the deployable candidates have already been selected based upon qualitative factors such as flight heritage. For the rule-based system, SHINE (Spacecraft High-speed Inference Engine) has been selected for deployment, which is a component of BEAM (Beacon-based Exception Analysis for Multimissions), a patented technology developed at NASA's JPL (Jet Propulsion Laboratory) and serves to aid in the management and identification of operational modes. For the "model-based" system, a commercially available package developed by QSI (Qualtech Systems, Inc.), TEAMS (Testability Engineering and Maintenance System) has been selected for deployment to aid in diagnosis. In the context of this particular deployment, distinctions among the use of the terms "data-driven," "rule-based," and "model-based," can be found in. Although there are three different categories of algorithms that have been selected for deployment, our main focus in this chapter will be on the evaluation of three candidates for data-driven anomaly detection. These algorithms will be evaluated upon their capability for robustly detecting incipient faults or failures in the ground-based phase of pre-launch space shuttle operations, rather than based oil heritage as performed in previous studies. Robust detection will allow for the achievement of pre-specified minimum false alarm and/or missed detection rates in the selection of alert thresholds. All algorithms will also be optimized with respect to an aggregation of these same criteria. Our study relies upon the use of Shuttle data to act as was a proxy for and in preparation for application to Ares I-X data, which uses a very similar hardware platform for the subsystems that are being targeted (TVC - Thrust Vector Control subsystem for the SRB (Solid Rocket Booster)).

Martin, Rodney Alexander↗

QS ATMS Calibration Data Book Government Version: Pre-Launch Version

The Advanced Technology Microwave Sounder (ATMS) SN301 is an instrument onboard the QuickSounder Satellite System, QuickSounder mission (renamed QS). Throughout this document the mission may be referred to as QuickSounder or QS. The purpose of this document is to provide information needed to interpret and process QS ATMS science data. The contents of the data book incorporate results from pre-launch subsystem-level and instrument-level testing as well as post-launch testing performed during instrument commissioning. Major milestones include instrument thermal vacuum (TVAC) testing in May 2024 and observatory TVAC testing in 2026. QS launch will be no earlier than Feb. 15, 2027.

Microwave Radiometer↗

Computer simulation of Saturn 5 response to pre-launch wind loads

A digital computer program is described which was developed to estimate Saturn 5 response to prelaunch wind conditions at Cape Kennedy. The program computes displacement and bending moment statistics as a function of parameters defining the atmospheric environment. A sample problem is provided to illustrate utilization of the program.

Coffin, T.↗

Pre-Launch Mission Operation Report: San Marco B

On or about April 23, 1967, the Italian Space Commission of the National Council of Research (I.S.C.) will launch the San Marco B satellite from the I.S.C. launch range located off the coast of Kenya, Africa. It is planned that the spacecraft will be placed into an equatorial orbit by the four-stage Scout vehicle, number S-153. The San Marco program is a joint NASA-I.S.C. effort being carried out in accordance with a Memorandum of Understanding dated 31 May 1962. Under this agreement the I .S.C. has established the equatorial launch site, has designed and fabricated the satellite, and will conduct the launch operation. The NASA has provided the Scout launch vehicle, training for I.S.C. personnel, technical consultation,and tracking and data acquisition for the operational satellite.

Source record↗

Launching of the telstar satellite

The launching of the Telstar satellite from Cape Canaveral is described, with emphasis on the pre-launch testing and test facilities.

LAUNCHING FACILITY↗

IMP-I spacecraft final magnetic tests

The increased IMP-I spacecraft spin axis moment resulting from excessive field exposures during environmental testing substantiated the need for a final pre-launch magnetic deperm and measurement. By performing a dc rotation deperm it was possible to reduce this moment below the previous initial test post deperm magnitude. In addition, the magnetic field disturbance at the flight magnetometer diminished to below 0.1 nanotesla (gamma) in all directions.

Harris, C. A.↗

Nuclear Electric Propulsion mission operations.

Mission operations are presented for comet rendezvous and outer planet exploration missions conducted by unmanned Nuclear Electric Propulsion (NEP) system employing in-core thermionic reactors for electric power generation. The selected reference mission are Comet Halley rendezvous and a Jupiter orbiter at 5.9 planet radii, the orbit of the moon Io. Mission operations and options are defined from spacecraft assembly through mission completion. Pre-launch operations and related GSE requirements are identified. Shuttle launch and subsequent injection to earth escape by the Centaur d-1T are discussed, as well as power plant startup and heliocentric mission phases.

Prickett, W. Z.↗

Mission operations for unmanned nuclear electric propulsion outer planet exploration with a thermionic reactor spacecraft.

Mission operations are presented for comet rendezvous and outer planet exploration NEP spacecraft employing in-core thermionic reactors for electric power generation. The selected reference missions are the Comet Halley rendezvous and a Jupiter orbiter at 5.9 planet radii, the orbit of the moon Io. The characteristics of the baseline multi-mission NEP spacecraft are presented and its performance in other outer planet missions, such as Saturn and Uranus orbiters and a Neptune flyby, are discussed. Candidate mission operations are defined from spacecraft assembly to mission completion. Pre-launch operations are identified. Shuttle launch and subsequent injection to earth escape by the Centaur D-1T are discussed, as well as power plant startup and the heliocentric mission phases. The sequence and type of operations are basically identical for all missions investigated.

Spera, R. J.↗

Investigation of environmental indices from the Earth Resources Technology Satellite

The author has identified the following significant results. Land use, quality, and air quality trends are being deduced from both ERTS-1 MSS and computer compatible tapes. The data analysis plan and the preliminary data analysis phase were conducted in January 1973. Results from these two phases are: (1) Method of analysis has been selected and checked out. (2) Land use for two dates have been generated for one test site. (3) Water quality for one date has been produced partially. (4) Air quality for three has been produced and compared with ground truth. (5) One of the two DCP stations is in operation; the second station will be installed in March 1973. Land use classification exceeds pre-launch expectations. Water quality (turbidity) is not progressing as expected. Finally, mesoscale air quality results have shown correlation with NOAA/EPA turbidity network. If air quality correlations continue to show favorable results, a rapid means of global turbidity may be available from ERTS-1 MSS observations.

Greeley, R. S.↗

Space shuttle guidance, navigation, and control design equations. Volume 3: Guidance

Space shuttle guidance, navigation, and control design equations are presented. The space-shuttle mission includes three relatively distinct guidance phases which are discussed; atmospheric boost, which is characterized by an adaptive guidance law; extra-atmospheric activities; and re-entry activities, where aerodynamic surfaces are the principal effectors. Guidance tasks include pre-maneuver targeting and powered flight guidance, where powered flight is defined to include the application of aerodynamic forces as well as thruster forces. A flow chart which follows guidance activities throughout the mission from the pre-launch phase through touchdown is presented. The main guidance programs and subroutines used in each phase of a typical rendezvous mission are listed. Detailed software requirements are also presented.

Source record↗

User's guide to the Mission Analysis Evaluation and Space Trajectory Operations program (MAESTRO)

The MAESTRO system is a mission analysis tool designed to present to the user information necessary to make the various decisions required in the design and execution of a spaceflight mission. The system was designed so that it can be used in both the pre-launch mission planning phase of a mission and during the flight as an in-flight decision making tool. A description of each of the following modes is presented: (1) trajectory propagation mode; (2) retro-fire determination mode; (3) midcourse analysis determination mode; (4) Monte Carlo mode; (5) verification mode; (6) orbit stability mode; and (7) post injection trim mode. A description of the inputs necessary to run the program mode is given along with a sample case.

Lutzky, D.↗

Apollo program flight summary report: Apollo missions AS-201 through Apollo 16, revision 11

A summary of the Apollo flights from AS-201 through Apollo 16 is presented. The following subjects are discussed for each flight: (1) mission primary objectives, (2) principle objectives of the launch vehicle and spacecraft, (3) secondary objectives of the launch vehicle and spacecraft, (4) unusual features of the mission, (5) general information on the spacecraft and launch vehicle, (6) space vehicle and pre-launch data, and (7) recovery data.

Holcomb, J. K.↗

A summary of major NASA launchings, 1 October 1958 - 30 September 1973

This report was compiled from several different sources. Documents consulted included: Operations Summaries, post-launch Flash Flight Reports, Final Field Reports, Mission Operations Reports (both pre-launch and post-launch), and Satellite Situation Reports. Other major references were publications of the NASA Historical Office, such as: Aeronautics and Astronautics 1916-1960; Aeronautical and Astronautical Events of 1961-1962; Aeronautics and Astronautics (yearly editions since 1963); and NASA's Pocket Statistics (published monthly.) The report is divided into projects within broad mission categories, with each project being treated chronologically. Mission results have been categorized as: successful (S); unsuccessful (U); or, partially successful (P). These are arbitrary classifications, made after a comparison of objectives and actual results.

Source record↗