An AI-driven framework for evaluating local and state authorities’ permitting processes

The demand for new energy infrastructure is increasing across the United States, but heterogenous permitting processes and embedded requirements across different local jurisdictions can cause project delays, increase “soft costs,” and hinder developer expansion. This study analyzes the variability in local permitting requirements across the U.S. and develops a quantitative approach to describe their clarity and effectiveness in enabling infrastructure project development. By using an Energy Language Model (ELM), a large language model (LLM) for energy technologies, we systematically gathered permitting information from nearly 300 state-, county-, and city-level documents, creating a structured dataset of requirements and procedures on an unprecedented scale and speed. Our analysis revealed that local (city and county) permitting requirement documents are underrepresented compared to state-level guidance documents, which can impede timely and cost-effective installation of new electric infrastructure. Our validation process showed that the final database has an accuracy of approximately 95%. We, further, created a new quantitative method to score permitting requirements for clarity and efficiency, with electric vehicle supply equipment as an initial use case. The average local permitting document scored a 1.8 out of 5, which we interpret as meaning that half of the requirements developers face when installing electric infrastructure are ambiguous, increasing both cost and time. We also created a “Generalized Permit Process”, highlighting common procedural steps and identifying specific opportunities for municipalities to improve their documentation. This research establishes a systematic and scalable framework for evaluating the complexities of local infrastructure permitting processes by combining LLM-powered data collection and quantitative scoring. The framework enables policymakers and developers to identify and mitigate procedural bottlenecks, with the expectation that these improvements can accelerate application review and approval, reduce project costs, and expedite connection to utility distribution grids. As a foundational approach for streamlining local project development processes, this study’s methods are intended to be extended to a wide range of energy applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY

Go slow to go fast? A review of the impacts of permitting on large-scale solar project development

State and local permitting challenges could impede the ability of large-scale solar (LSS) to meet growing electricity demand in the United States. Here, we review research that explores LSS permitting and its impacts on the pace and scale of LSS project development. Research on LSS permitting is relatively scarce, such that we support our review with research in the context of wind permitting, where appropriate. Further, few studies attempt to rigorously quantify the effects of permitting on the pace and scale of LSS project development. The available evidence allows us to identify various hypotheses and identify gaps for further research. Our review suggests that differences in permitting policies, regulations, and ordinances explain relatively little variation in LSS permitting and development outcomes across jurisdictions, except where jurisdictions implement rules designed to impede LSS. The evidence suggests LSS permitting challenges largely accrue during the implementation of permitting processes. Recent research suggests that community opposition to project development is a key driver of LSS permitting challenges, given that project opponents often use permitting processes to translate opposition into legal action. We call on future researchers to more concretely describe the LSS permitting challenge and to identify the specific actors responsible for implementing solutions.

Community opposition

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA

Expedited desalination permitting enables adaptive planning and water system cost reduction

Seawater desalination is a drought-proof water supply for coastal cities, but widespread development of desalination plants in the U.S. has been limited by both cost and the complexity of permitting processes designed to minimize environmental impact . This work estimates the value of accelerating the permitting timeline without changing environmental or social standards. On average, faster permitting reduces the frequency of desalination plant construction and operation, the overall costs of robust water system operation, the environmental impacts of drought-tolerant water supplies due to shorter duration of plant operation. Expedited permitting allows fundamental changes in how water infrastructure is deployed, facilitating a transition from anticipatory construction and continuous operation of seawater desalination capacity as a redundant drought buffer to just-in-time (i.e. adaptive) deployment of seawater desalination capacity when critical drought thresholds are crossed. We demonstrate the value of expedited desalination permitting in enabling adaptive planning and reducing water system costs using a simple case study in Santa Barbara, CA. We discuss additional forms of adaptive water infrastructure planning as enabled by faster permitting and address their challenges and opportunities. Lastly, we identify synergies between innovation in adaptive planning, innovation in expedited permitting practices, and innovation in water technology.

adaptive planning

SolarAPP+ Performance Review: Final Technical Report

The National Renewable Energy Laboratory (NREL) and its project partners have developed the novel Solar Automated Permit Processing plus (SolarAPP+) software platform that provides a flexible, web-based PV-permitting tool for residential systems that can be integrated with existing and complementary software platforms. The main objective of this research is to analyze the implementation of SolarAPP+. Analysis was conducted by identifying the benefits, tradeoffs, and overall performance of SolarAPP+, including achieving its goals of delivering automated, code compliant systems, influencing permitting cycle times, and improving application submittals and/or inspection performance. The NREL team published the results of this analysis in annual SolarAPP+ Performance Review technical reports.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Getting Electric Vehicle Ready in Indian Country

As electric vehicles (EV) become more common, Tribes can guide how charging infrastructure is planned, approved, and built on Tribal lands. Tribes can prepare for future infrastructure projects by updating codes, zoning, parking rules, and permitting process, as well as improving electrical infrastructure and broadband access.

33 ADVANCED PROPULSION SYSTEMS

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY

NEPATEC2.0: NEPA Text Corpus v2.0

The National Environmental Policy Act of 1969, as amended (NEPA), is a major environmental law in the United States, requiring Federal agencies to consider and document potential environmental impacts before deciding on a proposed action. Modernization of NEPA and permitting processes faces significant challenges due to the lack of standardized formats and interoperable systems for organizing and sharing NEPA-related information across agencies. Much of the information gathered during NEPA reviews is written into documents such as categorical exclusions, environmental assessments, and environmental impact statements, then filed in predominately independent agency file stores that may or may not be publicly accessible. The application of metadata and data standards, such as those recommended by the Council on Environmental Quality (CEQ), to NEPA documents offers a shared vocabulary and structure for key entities like projects, processes, and documents that can streamline information exchange and enhance collaboration across systems. In this work, we publicly release NEPATEC2.0, an expanded corpus of NEPA documents with associated metadata. NEPATEC2.0 encompasses approximately 120,000 documents from 60,000 projects prepared by more than 60 different agencies. Modeled to align with CEQ metadata standards, NEPATEC2.0 promotes consistency in environmental reviews and supports the ongoing effort to modernize permitting technologies by facilitating more transparent, efficient, and data-driven decision-making. Importantly, NEPATEC2.0 demonstrates the possibilities and limitations of large language model-based prompting to extract information from NEPA documents at scale.

environmental review

NEPATEC v2.0: Standardized Metadata and Text Corpus of National Environmental Policy Act Documents

The National Environmental Policy Act of 1969, as amended (NEPA), is a major environmental law in the United States, requiring Federal agencies to consider and document potential environmental impacts before deciding on a proposed action. Modernization of NEPA and permitting processes faces significant challenges due to the lack of standardized formats and interoperable systems for organizing and sharing NEPA-related information across agencies. Much of the information gathered during NEPA reviews is written into documents such as categorical exclusions, environmental assessments, and environmental impact statements, then filed in predominately independent agency file stores that may or may not be publicly accessible. The application of metadata and data standards, such as those recommended by the Council on Environmental Quality (CEQ), to NEPA documents offers a shared vocabulary and structure for key entities like projects, processes, and documents that can streamline information exchange and enhance collaboration across systems. In this work, we publicly release NEPATEC2.0, an expanded corpus of NEPA documents with associated metadata. NEPATEC2.0 encompasses approximately 120,000 documents from 60,000 projects prepared by more than 60 different agencies. Modeled to align with CEQ metadata standards, NEPATEC2.0 promotes consistency in environmental reviews and supports the ongoing effort to modernize permitting technologies by facilitating more transparent, efficient, and data-driven decision-making. Importantly, NEPATEC2.0 demonstrates the possibilities and limitations of large language model-based prompting to extract information from NEPA documents at scale.

54 ENVIRONMENTAL SCIENCES

Residential and Small Commercial Solar Photovoltaic and Storage Permitting, Inspection, and Interconnection Timelines: A Retrospective Review (2017-2023)

This report is part of the ongoing Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE) project, led by the National Renewable Energy Laboratory (NREL). The SolarTRACE project utilizes time-stamped project-level data provided by installer-partners to assess nationwide and AHJ- and utility-level PI&I and other solar PV adoption timelines since 2017. Our dataset now covers 22% of residential solar and 33% of residential storage installs in the U.S. since 2017. This report provides an update to our previous 2022 report (Cruce et al., 2022b) and includes: updated 2017 2023 project timelines for residential rooftop solar PV up to 20kW; updated tracking of permitting process changes at nearly 4,000 AHJs nationwide; and first-ever reporting of timelines for residential PV+storage projects up to 20kW.

14 SOLAR ENERGY

Stations Tool for Automated Permitting (S-TAP) User Manual

The Stations Tool for Automated Permitting (S-TAP) is a spreadsheet-based plan review questionnaire designed to help automate and expedite the electric vehicle supply equipment (EVSE) permitting process. This manual goes into detail on the development of the tool and guidance for use cases of the tool.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Evolution of storage monitoring – update in response to commercial and regulatory drivers

Carbon Capture and Storage (CCS) is in transition from first-of-a kind projects and research-orientated pilots to commercially-motivated applications. Monitoring results from many newly developed and planned large scale commercial projects are limited; however, it is worthwhile to assess their evolution and consider new strategies as part of an effort to assess and document best practices. Commercial monitoring is targeted to activities that comply with regulatory drivers and de-risk investments. Commercial monitoring also supports accounting that storage has occurred and is tied to project financing. It deals with long time frames and large volumes injected into multiple wells and multiple projects in favorable areas. We see developing trends toward reproducible workflows that systematically reduce risks and clarify expectations for oversight and long-term surveillance. Monitoring techniques showing increasing trends include injection zone pressure as a history-matching and compliance tool. To reduce cost and environmental impact of time-lapse seismic data collection, deploying new approaches and tools, such as use of fibre and installed sources are increasingly applied. Concern over the risk of induced seismicity by regulatory bodies and the general public has increased, which has also resulted in increased monitoring. Some techniques used in the early research phases have been sidelined or used only in restricted applications. For example, geochemical analyses in the injection zone as well as the environment are now being deployed less than it was in research-oriented programs, except in the US where it is required by the permitting process. Expectations of frequent area-wide near surface monitoring have also decreased.

25 ENERGY STORAGE

Techno-economic assessment of distributed wellhead RO water treatment for nitrate removal and salinity reduction: A field study in small disadvantaged communities

Techno-economic analysis of distributed wellhead water treatment and desalination (DWTD) systems was carried out based on a three-year field study in three small, disadvantaged communities (DACs) to evaluate the reliability and affordability of upgrading their impaired well water. The local water supplies of the three study DACs, located in Salinas Valley, California, were contaminated with nitrate at levels (~ 12–87 mg/L NO$^{-}_{3}$ - N) ) above the California maximum contaminant level (MCL) of 10 mg/L NO$^{-}_{3}$ - N , and had elevated water salinity (~600–1,600 mg/L total dissolved solids(TDS)) above its secondary MCL (SMCL) of 500 mg/L TDS. Well water nitrate removal and salinity reduction were accomplished via reverse osmosis (RO) based DWTD systems that operated autonomously, supported by remote monitoring and supervisory cyberinfrastructure. Reliable DWTD operation provided treated water quality, with respect to nitrate and salinity, in the range of 0.5–6.3 mg/L NO$^{-}_{3}$ - N and 57–161 mg/L TDS, respectively, which were well below the respective MCL and SMCL. The levelized cost of water treatment was in the range of ~$$2/m 3 - $$2.9/m 3 which aligns with typical residential water costs in California and in the study region, and monthly residential water costs (39 dollars-74 dollars/residential unit/month) were also within the range in California. The study showcased the DWTD approach as a viable and potentially scalable solution for upgrading impaired local potable water supply of communities lacking centralized water delivery infrastructure. However, streamlined permitting processes and standardized regulatory frameworks are critical to promoting wider adoption and maximizing the socio-economic benefits of the DWT approach. Moreover, DACs are likely to require government subsidies in order to cover the CapEx of DWTD systems in addition to upgrade of site infrastructure.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Uinta Basin CarbonSAFE II: Storage Complex Feasibility (Final Report)

The primary objective of this CarbonSAFE Phase II project was to establish the technical and commercial feasibility of a commercial-scale CO 2 geological storage complex for Deseret Power Electric Cooperative Bonanza Power Plant and other CO 2 sources in the northeast Uinta Basin, Utah, with the goal to securely store at least 50 million metric tons of captured CO 2 and accelerate CO 2 capture, utilization, and storage (CCUS) deployment. The project team established high-potential technical and commercial feasibility for a storage site within the east Uinta Basin (Utah), in the Cretaceous sandstones (Frontier, Dakota, and Buckhorn), Entrada Sandstone, Nugget Sandstone, and/or Weber Sandstone southwest of the Bonanza coal-fired power plant. This project collected and analyzed state-of-the-art data to characterize the storage complex consistent with Environmental Protection Agency (EPA) permitting standards. The team conducted extensive analog studies, outcrop mapping, and data sampling, which largely contributed to understanding the subsurface lithology and facies. Existing data were obtained and assessed from Utah Division of Oil, Gas, and Mining (DOGM), Utah Geological Survey (UGS), Colorado Geological Survey (CGS), U.S. Geological Survey (USGS), and EPA. These data were analyzed using state-of-the-art CCUS technologies for Societal Considerations, Site Characterization, Modeling and Simulations, Risk Assessment, Management and Monitoring, potential Underground Injection Control (UIC) Class VI Well Permitting, and Technical/Economic Feasibility. Through these high-resolution data collection and feasibility studies, this project was expected to provide a reference for initiating Underground Injection Control (UIC) and other commercial-scale geological storage permitting processes in the Western United States, ultimately contributing to the nation's decarbonization goals through low-risk, cost-effective commercial-scale carbon capture, utilization, and storage (CCUS) projects.

42 ENGINEERING

Energy Storage Siting and Permitting Outreach Workshop Report

On March 24th, 2026, under the sponsorship of the U.S. Department of Energy’s Office of Electricity, Pacific Northwest National Laboratory (PNNL) staff hosted the Energy Storage Siting & Permitting Outreach Workshop at PNNL’s Grid Storage Launchpad (GSL) facility in Richland, Washington. The workshop convened a cohort of state and regional stakeholders from across the country to build a shared understanding of energy storage technologies, regulatory frameworks, and best practices for engaging in the permitting process. Participants left with a deeper understanding of energy storage technologies, grid uses and benefits, interconnection and regulatory processes, battery safety standards and risk management, and local engagement strategies and approaches. The workshop concluded with a guided tour of the GSL for hands-on exposure to energy storage research and development. The workshop had 17 external participants. The attendees represented a range of backgrounds, including state and local governments, nonprofits or other local organizations, project developers, and utility stakeholders.

Battery Energy Storage

Exposing Process‐Level Biases in a Global Cloud Permitting Model With ARM Observations

The emergence of global convective‐permitting models (GCPMs) represents a significant advancement in climate modeling, offering improved representation of deep convection and complex precipitation patterns. In this study, we evaluate the performance of the Simple Cloud‐Resolving E3SM Atmosphere Model (SCREAM) using its doubly periodic configuration (DP‐SCREAM) against large eddy simulations and modern observational data sets from the Atmospheric Radiation Measurement program. We introduce several new transitional cloud regime cases, such as the transition from shallow to deep convection and from stratocumulus to cumulus, as well as cold‐air outbreak scenarios. The results reveal both strengths and limitations of SCREAM, particularly in the accurate simulation of cloud transitions and midlevel convection, with varying degrees of sensitivity to horizontal and vertical resolution. Despite improvements at higher resolutions, key biases remain, including the abrupt transition from shallow to deep convection and the lack of congestus clouds. These findings underscore the need for further refinement in turbulence parameterizations and vertical grid resolution in GCPMs.

Bogenschutz, Peter A. [Lawrence Livermore National