Search NASA⌕ Search

SEARCH · Search NASA

Results for “Phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

WholeTraveler Anonymized Data Phase 1

Phase 1 of the WholeTraveler Study data collection consisted of an online-only survey. This survey captured data on three categories of observable variation in the population relevant to transportation decisions. First, the survey collected traditional demographic data such as age, gender, income, and education level. Second, it collected data across personality, psychological, and preference categories. This included: 1. The "Big Five" inventory personality traits: openness to new experience, conscientiousness, extroversion, agreeableness, and neuroticism; 2. Risk and time preferences; and 3. Environmental preferences. Third, the survey collected data on historical behavior patterns including: 1. Adoption of (as well as interest in) new technologies or innovations (e.g., smartphones, PEVs, solar panels, adaptive cruise control [ACC]); 2. Car ownership history and current car ownership status; 3. Recent mode use across different time scales (e.g., previous week, previous month, previous year); and 4. Timing of major life events such as starting a family as well as overall lifecycle trajectory patterns. Data from Phase 1 and Phase 2 are linked by a unique respondent identifier. Anonymized versions of the Phase 1 and Phase 2 data are both available on Livewire.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Construction Technology Initiative Program: ACTI Phase 1 ACTI Phase 2

Demonstrate technologies to significantly reduce the cost and schedule for construction of advanced reactors. Demonstrate the technology by 2026/2027 to improve the economics of deploying advanced reactors. Selected technologies will not require major R&D efforts. With prototyping and testing, the technologies will be ready for deployment at scale.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Phase 1: Duke Energy Zero Emission Resource Integration Study (ZERIS); Phase 2: Carbon-Free Resource Integration Study for Duke Energy (Final Report)

Phase 1: This statement of work makes up Phase 1 of a larger effort. During this Phase 1 effort, NREL will work with Duke Energy to analyze the impacts of integrating significant amounts of new solar power into the Duke Energy power system under a variety of different penetrations scenarios, with a maximum of ten (10) full scenarios examined. The existing fleet, particularly the nuclear generation, will be considered in the quantitative assessments and discussions. Duke Energy is looking to quantify how much solar generation its system can handle. NREL will work with Duke Energy to quantify solar potential, identify likely integration challenges and possible opportunities for wind, storage, demand side resources and other technologies. Phase 2: This Statement of Work consists of a follow-up effort (Phase 2) to a recently completed Phase 1 modeling effort. During Phase 2, NREL will work closely with Duke Energy to analyze the impacts of integrating significant amounts of variable generation resources (wind and solar) and storage into Duke Energy's system in the Carolinas. The existing fleet, particularly nuclear generation, will be considered in the quantitative assessment and discussions. This Statement of Work also includes an extension to Phase II of the Carbon-Free Resource Integration Study for Duke Energy. In this extension, NREL will work closely with Duke Energy to extend the production cost analysis developed in Phase II to 2018 weather and load data for Duke Energy's territory. This extension leverages the modeling tools and datasets developed as part of Phase II. The analysis will compare results from Phase II (using 2012 weather and load) with 2018 results to assess system operations with increased penetration of renewables and storage. Simplifying assumptions will be made for modeling Duke Energy's neighbors in the production cost model.

14 SOLAR ENERGY↗

Advanced Modular Sub-Atmospheric Hybrid Heat Engine (Phase 1 Final Report)

The Phase 1 Final Report describes the results of the work completed during the “Advanced Modular Sub-Atmospheric Hybrid Heat Engine” project. The objectives of Phase 1 work were to develop a conceptual design of the turbine-based modular hybrid heat engine (MHHE), including thermodynamic cycle analysis, define the nominal engine component boundary conditions, identify technology gaps, and develop a detailed test plan to address these gaps through bench scale testing in a potential subsequent Phase 2 project. To achieve the project objective, the following activities were performed in Phase 1 work: (1) Market analysis and primary fuel selection, (2) Conceptual design and integrated layout development, (3) Design support and key components characterization, (4) Planning to move technology to pre-commercial demonstration.

42 ENGINEERING↗

ICE Calculator 2: Final Report for Phase 1 and 2 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

ICE 2.0 Phase 2 Final Report In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE Calculator 2 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE Calculator 2 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 and 2 of the ICE Calculator 2 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 2 was sponsored by six utilities: Empire District Electric Company, Evergy Missouri, Pacific Gas & Electric, San Diego Gas & Electric, Southern California Edison, and Union Electric. Phase 1 and 2 involved 15 customer interruption cost survey activities representing a total of 30 electricity distribution service territories. ICE Calculator Version 2.0 and 2.2 Comparison This memorandum describes–at a high-level–the improvements in interruption cost estimates for the version 2.2 of the ICE Calculator (released February 2026) compared to version 2.0 (released in April 2025). Version 2.2 of the ICE Calculator corresponds to Phase 2 of the initiative, while version 2.0 corresponds to Phase 1. The improvements in version 2.2 result from both a significant increase in the number of customer responses that have been collected and the identification of seven additional factors that help estimate customer interruption costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Towards a Workforce Roadmap for Distributed Wind: Phase 1 - Identifying Needs and Barriers

Despite recent policy, research efforts, and resources available for utility-scale and offshore wind workforce development, the distributed wind (DW) industry has yet to make similar advances to address its workforce challenges. This report initiates the phased development of a DW workforce roadmap to provide a foundation for roadmap development. Phase 1, contained in this report, uses desk-based research on clean energy workforce approaches and a DW interested-party survey to discuss needs and barriers hindering the workforce from expanding. Findings are summarized into goals and solutions for Phase 2 of roadmap development, which identifies actors responsible for implementing solutions identified in Phase 1. Phase 1 results suggest that the sector's small size and limited growth motivate the short-term need for skilled workers or candidates with well-rounded and multifaceted abilities. Long-term expansion plans must diversify positions while capitalizing on existing utility-scale wind and offshore workforce efforts, as well as other renewable sector best practices where possible. The findings in this report can advance workforce development in the DW sector by aligning interested industry parties around common goals to address challenges. Training providers, installers, operators, manufacturers, federal agencies, national laboratories, academic partners, and labor unions can utilize the findings to help promote sustainable growth of the DW sector.

17 WIND ENERGY↗

A Data-Agnostic, Continuous Machine Learning Framework for Application in High Energy Physics and Beyond: Phase 1 Final Scientific/Technical Report

This Phase 1 effort has focused on the development of continual learning frameworks for use in machine learning, specifically in the applied context of High Energy Physics (HEP). Machine learning (ML) is a transformative technology by which computers, typically through the use of neural networks, are able to perform tasks with proficiency that rivals or surpasses that of human users. Model Degradation & Catastrophic Forgetting are two undesired phenomena which can occur in ML where the performance of a model degrades when either deployed on novel data streams, or trained on novel data which are sufficiently different than the data the models were initially trained on. A natural example where these sorts of effects can be observed is in the performance of detectors in harsh environments, where the detector signature may change over the lifetime of the detector as it ages and deteriorates — precisely what occurs in the experiments conducted in HEP. Real world HEP data is therefore an excellent test-ground and use-case for Continual Learning paradigms, which are techniques used in ML to counteract these problems. Ensemble learning is one such technique, where multiple smaller models are trained on subsets of the overall data and are ensembled together during inference. The intuition behind this technique is that, although there are shifts in the distributions which govern the incoming data streams, these shifts are not expected to be homogeneous or global. If a sufficient diversity in solutions within the various sub-models has been achieved, then at least one sub-model is expected to retain its performance within the overall ensemble. One further strength of this approach is that the architectures of the various models do not need to be identical, and in fact even different modalities of data can naturally be combined in this way. This work focused on applying ensemble learning techniques to derive results using two main datasets, anomaly detection in HEP data & time-series forecasting in semiconductor manufacturing data. Semiconductor manufacturing involves data with surprising similarity to that of HEP (e.g. wafer maps look very similar to digi-occupancy maps) and Cerium Lab’s prominence within the semiconductor industry makes semiconductor manufacturing a natural opportunity for commercialization of this work. Our efforts have led to two strong results. The first is that we evaluated the proposed ensembling techniques using previously proposed machine learning architectures for use in anomaly detection, namely AutoEncoder based models and their derivatives. We also developed new architectures which have not been evaluated in this context before. In fact, this work marks the first use of Vision Transformers for anomaly detection in HEP. Second, we demonstrated that ensemble learning significantly improves model performance in scenarios prone to degradation, validating its effectiveness across both HEP and semiconductor datasets. These results further support ensemble learning as a powerful strategy for mitigating catastrophic forgetting and maintaining robust performance in evolving data environments.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Phase 1 NuScale SMR FOAK Nuclear Demonstration Readiness Project (Final Scientific/Technical Report)

The overarching objective of the Phase 1 NuScale SMR First-of-a-Kind (FOAK) Nuclear Demonstration Readiness Project was to enhance competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale small modular reactor (SMR). The scope of this Phase 1 project continued to advance the licensing and design maturity, particularly in those areas related to supporting customer readiness, supply chain integration, cost competitiveness, and cost confidence. This investment provided by the Government has accelerated development of these designs and technologies so that the existing domestic fleet of nuclear power plants remains viable and the most mature in the nuclear industry. The intent is to have the new, advanced U.S. designs be deployed as early 2026, and be globally competitive. As a part of the First-of-a-Kind Nuclear Demonstration Readiness Project, NuScale has been developing an advanced reactor design, leading the path for other development projects or complex technology advancements for existing plants that have significant technical and licensing risk. The NuScale Power team (NuScale) is advancing licensing, engineering, supply chain development, testing, and other required activities to enhance the innovation and competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale SMR. Specifically, NuScale is performing the following activities in Phase 1. Fully supporting the NRC review of the NuScale DCA to ensure approval of a final safety evaluation report by the end of 2020. Improving plant cost confidence and cost competitiveness through design and supply chain advancement, incorporation of constructability best practices, and margin recovery to increase plant power output. Accelerating design maturity, technology development, and operational program readiness to support a customer commitment for plant deployment. The Department of Energy (DOE) Office of Scientific and Technical Information (OSTI), a unit of the Office of Science, fulfills agency-wide responsibilities to collect, preserve, and disseminate both unclassified and classified scientific and technical information (STI) emanating from DOE-funded research and development (R&D) activities at DOE national laboratories and facilities and at universities and other institutions nationwide. This scientific and technical report provides summaries of the analyses and research that was performed by NuScale under this project that achieves the objective of disseminating information to the nuclear industry to ensure the innovations realized are shared for the benefit of the industry at large.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Ultra-high Q cavity-based search for the Dark Photon: new exclusion limit from Dark SRF phase 1 and step forward for phase 2

We present here the first results of Dark SRF, a light-shining-through-wall (LSW) experiment that leverages ultra-high quality factor superconducting radio frequency (SRF) cavities to search for dark photons. The use of Nb SRF cavities combined with a strict calibration and measurement protocol increased sensitivity to dark photons by several orders of magnitude compared to other LSW experiments, as demonstrated by our new limit that excluded a broad range of previously unstudied dark photon mass and mixing angle.In addition to the results of the search conducted in liquid helium using 1.3GHz SRF cavities, we also present the first steps of the second phase of the experiment, which will take place in a dilution refrigerator using 2.6GHz SRF cavities. These experiments are part of a wider effort of the Superconducting Quantum Materials and Systems (SQMS) Center to employ ultra-high Q SRF cavities to search for Beyond the SM particles and wavelike dark matter.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Reduced Complexity Model Intercomparison Project Phase 1: introduction and evaluation of global-mean temperature response

Reduced-complexity climate models (RCMs) are critical in the policy and decision making space, and are directly used within multiple Intergovernmental Panel on Climate Change (IPCC) reports to complement the results of more comprehensive Earth system models. To date, evaluation of RCMs has been limited to a few independent studies. Here we introduce a systematic evaluation of RCMs in the form of the Reduced Complexity Model Intercomparison Project (RCMIP). We expect RCMIP will extend over multiple phases, with Phase 1 being the first. In Phase 1, we focus on the RCMs' global-mean temperature responses, comparing them to observations, exploring the extent to which they emulate more complex models and considering how the relationship between temperature and cumulative emissions of CO2 varies across the RCMs. Our work uses experiments which mirror those found in the Coupled Model Intercomparison Project (CMIP), which focuses on complex Earth system and atmosphere–ocean general circulation models. Using both scenario-based and idealised experiments, we examine RCMs' global-mean temperature response under a range of forcings. We find that the RCMs can all reproduce the approximately 1°C of warming since pre-industrial times, with varying representations of natural variability, volcanic eruptions and aerosols. We also find that RCMs can emulate the global-mean temperature response of CMIP models to within a root-mean-square error of 0.2°C over a range of experiments. Furthermore, we find that, for the Representative Concentration Pathway (RCP) and Shared Socioeconomic Pathway (SSP)-based scenario pairs that share the same IPCC Fifth Assessment Report (AR5)-consistent stratospheric-adjusted radiative forcing, the RCMs indicate higher effective radiative forcings for the SSP-based scenarios and correspondingly higher temperatures when run with the same climate settings. In our idealised setup of RCMs with a climate sensitivity of 3°C, the difference for the ssp585–rcp85 pair by 2100 is around 0.23°C(±0.12°C) due to a difference in effective radiative forcings between the two scenarios. Phase 1 demonstrates the utility of RCMIP's open-source infrastructure, paving the way for further phases of RCMIP to build on the research presented here and deepen our understanding of RCMs.

54 ENVIRONMENTAL SCIENCES↗

ICE Calculator 2.0: Final Report for Phase 1 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE 2.0 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE 2.0 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 of the ICE 2.0 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 1 involved 11 customer interruption cost survey activities representing a total of 24 electricity distribution service territories, 23 of them located in the Eastern and Midwestern regions of the U.S. and one located in the Pacific Northwest. ICE 2.0 vs. 1.0 Comparison This memorandum compares customer power interruption costs estimated using the recently updated Interruption Cost Estimate (ICE) Calculator (“ICE 2.0”) to the original ICE Calculator (“ICE 1.0”). ICE 1.0 was developed in 2009 based on 15 independent power interruption cost surveys conducted by 10 electric utilities between 1989 and 2012. ICE 2.0 was developed in 2025 through a national initiative based on a consistent set of power interruption cost surveys and 11 surveying efforts conducted across 24 electric utility service territories between 2022 and 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Gen 3 Particle Pilot Plant (G3P3) -- High-Temperature Particle System for Concentrating Solar Power (Phases 1 and 2)

The U.S. Department of Energy Solar Energy Technologies Office initiated the Generation 3 Concentrating Solar Power (CSP) program to achieve higher operating temperatures (>700 °C) to enable next-generation CSP high-temperature power cycles such as the supercritical CO 2 (sCO2) Brayton Cycle. Three teams were selected to pursue high-temperature gas, liquid, and solid pathways for the heat-transfer media. Phases 1 and 2, which lasted from 2018 – 2020, consisted of design, modeling, and testing activities to further de-risk each of the technologies and develop a design for construction, commissioning, and operation of a pilot-scale facility in Phase 3 (2021 – 2024). This report summarizes the activities in Phases 1 and 2 for the solid-particle pathway led by Sandia National Laboratories. In Phases 1 and 2, Sandia successfully de-risked key elements of the proposed Gen 3 Particle Pilot Plant (G3P3) by improving the design, operation, and performance of key particle component technologies including the receiver, storage bins, particle-to-sCO2 heat exchanger, particle lift, and data acquisition and controls. Modeling and testing of critical components have led to optimized designs that meet desired performance metrics. Detailed drawings, piping and instrumentation diagrams, and process flow diagrams were generated for the integrated system, and structural analyses of the assembled tower structure were performed to demonstrate compliance with relevant codes and standards. Instrumentation and control systems of key subsystems were also demonstrated. Together with Bridgers & Paxton, Bohannan Huston, and Sandia Facilities, we have completed a 100% G3P3 tower design package with stamped engineering drawings suitable for construction bid in Phase 3.

14 SOLAR ENERGY↗

Hydrochlorination of Uranium Dioxide in a Molten Salt Mixture - Phase 1: Tube Furnace Cross Flow Experiments

In 2023, Metatomic® Inc., a South Carolina based company, was awarded a Gateway for Advanced Innovation in Nuclear (GAIN) research voucher for a proposed series of experiments aimed at demonstrating the viability of a spent nuclear fuel (SNF) recycling process patented by Met atomic® Inc. For the GAIN voucher, Metatomic® Inc. selected Savannah River National Laboratory (SRNL) as a partner in executing the proposed proof-of-concept experiments. This report outlines the proof-of-concept experiments performed by SRNL for Metatomic® Inc. during Phase 1 (of 2) experimentation. The Phase 1 hydrochlorination experiments consisted of weighing UO2 into alumina crucibles with a eutectic mixture of NaCl and CsCl, heating the uranium/salt mixture to a varied temperature (550, 650, or 750 °C), and flowing anhydrous hydrogen chloride (AHCl) gas across the surface of the uranium-bearing molten salt mixture. The hydrochlorination process conditions were maintained for 4-5 hours and the percent conversion for each batch of UO2 was determined using a suite of analytical characterization techniques. The degree of UO2 conversion was found to be greatest at the highest tested temperature, ultimately achieving 32.9% conversion of UO2 to water soluble uranium-chloro species (e.g., UO2Cl2, UCl4) after exposure to AHCl for 4.25 hours at 750 °C.

Nguyen, Vinh T. [Savannah River National Laborator↗

Long-Term Results of a Phase 1 Dose-Escalation Trial and Subsequent Institutional Experience of Single-Fraction Stereotactic Ablative Radiation Therapy for Liver Metastases

We report long-term outcomes from our phase 1 dose-escalation study to determine the maximum tolerated dose of single-fraction liver SABR pooled with our subsequent single institutional experience with patients treated postprotocol at the highest dose level (40 Gy) established from the phase 1 study.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Wind Plant Performance Prediction Benchmark Phase 1 (Technical Report)

Financial risk resulting from the uncertainty associated with developing, owning, and operating wind power plants remains a barrier to reducing the levelized cost of energy (LCOE). On average, modern wind power plants in the U.S. underperform their expected annual energy output by 3.5-4.5% , with many underperforming by over 10%. To compensate for this uncertainty, investors require a larger return on investment (ROI) and apply "knock-down" factors that mask much of the underlying sources of uncertainty. Wind energy projects thus have reduced access to low-cost capital. Furthermore, operating wind plants often take a simple approach to estimating operations & maintenance (O&M) costs (e.g. straight-line estimates based on similar plants), which can eat into profits. To overcome these issues, the wind industry must improve the models they use for estimating wind plant performance and operations. An industry consortium (IC) requested that the National Renewable Energy Laboratory (NREL) lead a Department of Energy (DOE) working group to benchmark the accuracy of wind power plant energy predictions against real operational data. The IC was also motivated by DOE and NREL's potential to characterize systematic energy underperformance, identify sources of uncertainty, and explore root causes. The Wind Plant Performance Prediction (WP3) project was created out of this request, and this report represents the successful completion of Phase 1 of the WP3 project. During the project, wind plant owners provided both pre-construction and operational data to NREL. The pre-construction data was provided to wind resource assessment (WRA) consultants so they could conduct energy yield assessments (EYA). NREL took all of the completed EYAs, along with the operational data, and conducted an operational assessment to benchmark the EYA results against actual operational data. Given the large amounts of sensitive data required for this effort, as well as historical opposition to sharing data within industry, successful completion of Phase 1 represents an unprecedented milestone for industry data sharing. To improve the accuracy and confidence of pre-construction EYAs, wind plant owners and investors need better, more certain, energy yield predictions. The WP3 Benchmark Project is an industry-driven response to this reality. For the first time, industry has taken the important step of working together at scale, sharing valuable operational data with DOE and NREL in order to investigate the sources of bias and uncertainty in these energy estimates. This IC provides wind plant preconstruction and operational data to NREL in an organized and documented fashion and provides guidance and feedback as needed. The IC also provides introspection of the design of experiment, key metrics of success, data challenges, analysis best practices, and quality of results.

17 WIND ENERGY↗

Materials Scorecards, Phase 1: Advanced Materials and Manufacturing Technology

This report presents preliminary material score cards (Phase 1) based on a survey of industry experts and the limited literature available on the state of advanced manufacturing of materials for nuclear applications. Seven reactor types were considered, and the data is presented in tabular form. The caveat is that the scores are based on limited data and expert judgement. Considerable work remains to be done to prioritize materials for advanced manufacturing to support existing and advanced reactors. A central database of processing conditions, resulting microstructure, post processing, properties, and performance of these materials is needed to support the accelerated adoption of advanced manufacturing by the industry.

36 MATERIALS SCIENCE↗