Search NASA⌕ Search

SEARCH · Search NASA

Results for “Phase III”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase) (Final Report)

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership (RCSP) Initiative. The public/private consortium, funded through the MRCSP, brings together nearly 40 industry partners in 10 contiguous states in Mid-West and North-East regions. Battelle, as the project lead, oversees research & development, operations, and coordinates activities among various partners. Since its founding, MRCSP has made significant progress towards advancing CCS and CCUS technologies for participating states in the region. Between 2008 to 2020, Phase III of the MRCSP program focused on the development of large-scale injection tests. This report is part of a series of topical reports prepared under the MRCSP Phase III. The MRCSP Final Technical Report summarizes the research conducted while monitoring large-scale injection tests at a CO 2 -EOR facility in Northern Michigan. The project successfully injected more than one million metric tons of CO 2 into depleted oil fields in the Northern Niagaran Pinnacle Reef Trend (NNPRT) for enhanced oil recovery (EOR). These commercial-scale tests provided valuable real-world knowledge that has been used to refine technologies and methods, reduce uncertainties, and demonstrate safety and effectiveness of CCUS technologies to increase public acceptance. The Final Technical Report provides an overview of Phase III efforts including advancing the understanding of the regional geology, storage capacities, deployment of many monitoring and modeling techniques and its efficacy, and technical demonstration of large-scale CO 2 injection, containment, and associated storage in the NNPRT region. Specific topical reports on the subjects covered in the Final Technical Report are also available through EDX/OSTI.

01 COAL, LIGNITE, AND PEAT↗

Southeast Regional Carbon Sequestration Partnership Phase III Overview of Accomplishments (SECARB Phase III Final Report)

The Southeast Regional Carbon Sequestration Program (SECARB) is a carbon management program established in 2003 and managed by the Southern States Energy Board (SSEB). SECARB is one of seven regional carbon sequestration partnerships formed by the Department of Energy (DOE). The seven partnerships form a national network of more than 400 organizations covering 43 states and four Canadian provinces with expertise in the areas of carbon capture, transportation, and storage. The SECARB program was funded by DOE and cost-sharing partners. The primary goal of SECARB was to identify major sources of carbon emissions, characterize the geology of a 13-state region, determine the most promising options for commercial deployment of carbon dioxide (CO 2 ) sequestration technologies in the South, and validate the technology options through carefully executed field testing through 2017. This report summarizes significant Phase III accomplishments and is organized by task as established within the SECARB Phase III Statement of Project Objectives (SOPO). This document does not provide an exhaustive overview of individual tasks. Rather, this report provides an overview of programmatic accomplishments and a timeline of events. Where applicable, hyperlinks to specific project deliverables are provided.

54 ENVIRONMENTAL SCIENCES↗

Los Angeles International Airport Runway Incursion Studies: Phase III--Center-Taxiway Simulation

Phase III of the Los Angeles International Airport Runway Incursion Studies was conducted, under an agreement with HNTB Corporation, at the NASA Ames FutureFlight Central (FFC) facility in June 2003. The objective of the study was the evaluation of a new center-taxiway concept at LAX. This study is an extension of the Phase I and Phase II studies previously conducted at FFC. This report presents results from Phase III of the study, in which a center-taxiway concept between runways 25L and 25R was simulated and evaluated. Phase III data were compared objectively against the Baseline data. Subjective evaluations by participating LAX controllers were obtained with regard to workload, efficiency, and safety criteria. To facilitate a valid comparison between Baseline and Phase III data, the same scenarios were used for Phase III that were tested during Phases I and II. This required briefing participating controllers on differences in airport and airline operations between 2001 and today.

Madson, Michael D.↗

OC6 Phase III Definition Document

The objective of Phase III of the Offshore Code Comparison Collaboration, Continued, with Correlation and unCertainty (OC6) project was to evaluate the accuracy of aerodynamic load predictions by offshore wind modeling tools for a floating offshore wind turbine as it experiences large surge-translational and pitch-rotational motion, as would occur during normal operation. A variety of models were examined in the project, with the goal of performing a three-way validation between engineering-level tools, higher-fidelity tools, and measurement data from two wind tunnel experimental campaigns. This document provides the necessary information to model and simulate the system studied in the OC6 Phase III project. This information is not only useful for project participants, but also future modelers who want to replicate this work for verification and validation purposes.

17 WIND ENERGY↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

OC6 Phase III: Validation of Wind Turbine Aerodynamic Loading During Surge/Pitch Motion

The objective of Phase III of the Offshore Code Comparison Collaboration, Continued, with Correlation and unCertainty (OC6) project was to validate the accuracy of aerodynamic load predictions by offshore wind modeling tools for a floating offshore wind turbine as it experiences large surge-translational and pitch-rotational motion, as would occur during normal operation. The test data considered were generated at Politecnico di Milano – a wind tunnel with a robotic excitation system to emulate wave loading on the wind turbine. Testing was performed using a scaled version of the DTU 10-MW reference model, and motion was prescribed as harmonic oscillations in the surge and pitch directions, independently. A variety of models were examined in the project, performing a three-way validation between engineering-level tools, higher-fidelity tools, and measurement data from two wind tunnel experimental campaigns. The Load Cases (LC) considered in this testing are as follows: LC 1.X - Steady Wind LC 2.X - Unsteady Wind - Surge Motion LC 3.X - Unsteady Wind - Pitch Motion Details on the results of the OC6 Phase III campaign can be found in the following reference: Bergua R., et al. OC6 project Phase III: validation of the aerodynamic loading on a wind turbine rotor undergoing large motion caused by a floating support structure, Wind Energ. Sci., 8, 465–485, https://doi.org/10.5194/wes-8-465-2023, 2023.

17 WIND ENERGY↗

Subgroup analysis of efficacy and safety of orantinib in combination with TACE in Japanese HCC patients in a randomized phase III trial (ORIENTAL)

A randomized, phase III trial of orantinib in combination with transcatheter arterial chemoembolization (TACE) did not prolong overall survival (OS) over placebo (ORIENTAL study). A subgroup analysis was conducted to evaluate the efficacy and safety of orantinib in Japanese patients enrolled in the ORIENTAL study. The data of Japanese patients from this study were analyzed. The overall survival (OS), time to progression (TTP), and time to TACE failure (TTTF) were compared between orantinib and placebo arms using stratified log-rank test. Since TTTF in patients with Barcelona Clinic Liver Cancer stage B (BCLC-B) showed favor outcome in this study, the OS and TTTF according to BCLC staging system were also analyzed. The subgroup analysis consisted of 219 and 213 patients in the orantinib and placebo arms. Median OS was 32.5 vs 33.0 months (p = 0.906), median TTP was 4.7 vs 3.1 months (p = 0.011), and median TTTF was 25.3 vs 18.2 months (p = 0.160) in the orantinib and placebo groups, respectively. Patients with BCLC-B in the orantinib and placebo groups showed a median OS of 33.7 and 30.1 months, respectively (p = 0.260), while the corresponding median TTTF were 25.3 and 14.0 months (p = 0.125). The Japanese population safety profile was similar to all over population in the ORIENTAL study. No significant differences were observed in the OS and TTTF though the TTP was significantly improved in the orantinib arm. The OS and TTTF showed a tendency to be prolonged following orantinib treatment of Japanese HCC patients with BCLC-B in the ORIENTAL study.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 6.0 Deliverable – CarbonSAFE Phase III Readiness

The OASIS CarbonSAFE Phase II Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on understanding the potential of the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations for geologic storage of CO 2 . These formations were investigated as part of SECARB-USA (DE-FE0031830) and Project OASIS through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was conducted to help select the site for Westover #2 as part of SECARB-USA (DE-FE0031830), and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and to identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment. While this document endeavors to provide readers with a high-level overview of Project OASIS activities and its suitability for subsequent CarbonSAFE Phases, such as a Phase III effort. Other project deliverables and milestones will provide more details on individual subjects.

20 FOSSIL-FUELED POWER PLANTS↗

NASA's Centennial Challenge for 3D-Printed Habitat: Phase II Outcomes and Phase III Competition Overview

The 3D-Printed Habitat Challenge is part of NASA's Centennial Challenges Program. NASA's Centennial Challenges seek to accelerate innovation in aerospace technology development through public competitions. The 3D-Printed Habitat Challenge, launched in 2015, is part of the Centennial Challenges portfolio and focuses on habitat design and development of large-scale additive construction systems capable of fabricating structures from in situ materials and/or mission recyclables. The challenge is a partnership between NASA, Caterpillar (primary sponsor), Bechtel, Brick and Mortar Ventures, and Bradley University. Phase I of the challenge was an architectural concept competition in which participants generated conceptual renderings of habitats on Mars which could be constructed using locally available resources. Phase II asked teams to develop the printing systems and material formulations needed to translate these designs into reality. Work under the phase II competition, which concluded in August 2017 with a head to head competition at Caterpillar's Edward Demonstration Facility in Peoria, Illinois, is discussed, including the key technology development outcomes resulting from this portion of the competition. The phase III competition consists of both virtual and construction subcompetitions. Virtual construction asks teams to render high fidelity architectural models of a habitat and all the accompanying information required for construction of the pressure retaining and load bearing portions of the structure. In construction phase III, teams are asked to scale up their printing systems to produce a 1/3 scale habitat on-site at Caterpillar. The levels of the phase III construction competition (which include printing of a foundation and printing and hydrostatic testing of a habitat element) are discussed. Phase III construction also has an increased focus on autonomy, as these systems are envisioned for robotic precursor missions which would buildup infrastructure prior to the arrival of crew. Results of the phase III competition through July 2017 (which includes virtual construction level 1) are discussed. This Centennial Challenge enables an assessment of the scaleability and efficacy of various processes, material systems, and designs for planetary construction. There are also near-term terrestrial applications, from disaster response to affordable housing and infrastructure refurbishment, for these technologies.

Prater, T. J.↗

Phase III Simplified Integrated Test (SIT) results - Space Station ECLSS testing

During 1989, phase III testing of Space Station Freedom Environmental Control and Life Support Systems (ECLSS) began at Marshall Space Flight Center (MSFC) with the Simplified Integrated Test. This test, conducted at the MSFC Core Module Integration Facility (CMIF), was the first time the four baseline air revitalization subsystems were integrated together. This paper details the results and lessons learned from the phase III SIT. Future plans for testing at the MSFC CMIF are also discussed.

Roberts, Barry C.↗

Irradiation and PIE of alloys X-750 and XM-19 (EPRI Phase III)

The Nuclear Science User Facilities (NSUF) based at Idaho National Laboratory (INL), along with the Electric Power Research Institute (EPRI), formed an agreement to test representative alloys used as reactor structural materials as a pilot program to establish guidelines for future NSUF research programs. This report contains results from the portion of this program established as Phase III (of three phases), entailing irradiation and post-irradiation examination of select alloys typical of boiling water reactor (BWR) internal structural materials. Phases I and II are the subject of separate reports and represent baseline material test results and irradiation experiment design, respectively. The intent of this Phase III research program is to determine properties for the materials of interest after being irradiated at the Advanced Test Reactor (ATR) to three different target fast (E>1MeV) fluences: 5.0 x 10¹⁹ n/cm², 2.0 x 10²⁰ n/cm², and 1.0 x 10²¹ n/cm². These correspond to irradiation damage levels (displacements per atom [dpa]) of approximately 0.08, 0.30, and 1.4 dpa, which represent comparable levels to (a) a previous study which looked at X-750 irradiated to ~1 x 10¹⁹ n/cm², comparable to the lowest fluence; (b) approximately a medium level of fluence for BWR components; and (c) extended life (60 – 80 years) for BWR components. The materials chosen for this research are the nickel-based alloy X-750 and austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co., and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research Center (GE-GRC), and parts were provided to INL for use in this pilot project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Irradiation and PIE of alloys X-750 and XM-19 (EPRI Phase III)

The Nuclear Science User Facilities (NSUF) based at Idaho National Laboratory (INL), along with the Electric Power Research Institute (EPRI), formed an agreement to test representative alloys used as reactor structural materials as a pilot program to establish guidelines for future NSUF research programs. This report contains results from the portion of this program established as Phase III (of three phases), entailing irradiation and post-irradiation examination of select alloys typical of boiling water reactor (BWR) internal structural materials. Phases I and II are the subject of separate reports and represent baseline material test results and irradiation experiment design, respectively. The intent of this Phase III research program is to determine properties for the materials of interest after being irradiated at the Advanced Test Reactor (ATR) to three different target fast (E>1MeV) fluences: 5.0 x 10¹⁹ n/cm², 2.0 x 10²⁰ n/cm², and 1.0 x 10²¹ n/cm². These correspond to irradiation damage levels (displacements per atom [dpa]) of approximately 0.08, 0.30, and 1.4 dpa, which represent comparable levels to (a) a previous study which looked at X-750 irradiated to ~1 x 10¹⁹ n/cm², comparable to the lowest fluence; (b) approximately a medium level of fluence for BWR components; and (c) extended life (60 – 80 years) for BWR components. The materials chosen for this research are the nickel-based alloy X-750 and austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co., and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research Center (GE-GRC), and parts were provided to INL for use in this pilot project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Verification of a Numerical Model of the Offshore Wind Turbine from the Alpha Ventus Wind Farm Within OC5 Phase III: Preprint

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project, is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project analyzes the Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. This paper shows results of the verification of the OWT models (code-to-code comparison). A subsequent publication will focus on their validation (comparison of simulated results to measured physical system response data). Based on the available data, the participants of Phase III set up numerical models of the OWT in their simulation tools. It was necessary to verify and to tune these models. The verification and tuning were performed against an OWT model available at the University of Stuttgart - Stuttgart Wind Energy (SWE) and documentation provided by Senvion and OWEC Tower. A very good match was achieved between the results from the reference SWE model and models set up by OC5 Phase III participants.

17 WIND ENERGY↗

Hypersonic Research Facilities Study - Volume IV, Part 1: Phase III Final Studies Flight Research Facilities

The Phase III analyses of Flight Research Facilities performed as a portion of the Hypersonic Research Facilities (HYFAC) Study are presented herein. Two attractive flight research vehicle concepts, geared to the development needs of future (1980-2n00) operational hypersonic aircraft systems, are defined. The inherent research capability of each concept is further expanded by incorporating provisions within the basic vehicle design to accommodate the testing of several additional research options. The design feasibility of this approach to achieving increased research flexibility is examined. Near term propulsion systems are employed as the basic power plants to shorten acquisition time, reduce development costs, and provide high confidence in attaining the performance capability desired, Performance is determined for each basic vehicle and for the vehicles when incorporating several optional research packages. Total program cost estimates are developed for each vehicle and for the various research options. This study provides the necessary framework for the formulation of an attractive and needed flight research program which is a key element in the systematic development of an overall advanced research plan.

Source record↗

Space Phase III - The commercial era dawns

After the 'Phase I' of space activities, the period bounded by Sputnik and Apollo, 'Phase II', has been entered, a phase in which concerns over the use and the protection of space assets which support national security predominate. However, it is only when the commercial motive becomes prominent that human activity in new regions truly prospers and enters periods of exponential growth. It is believed that there are increasing signs that such a period, called 'Space Phase III', may be coming soon. A description is presented of developments and results upon which this conclusion is based. Since 1980, there have been three developments of great importance for the future of space activities. Six highly successful flights have demonstrated that the Space Shuttle concept works. A series of Soviet missions are related to the emergence of a capability to construct and service modular space stations. Successful tests of the European Ariane 1 indicate an end to U.S. monopoly with respect to the provision of launch services to the Western World.

Allnutt, R. F.↗

Acoustic Detection of Faults and Degradation in a High-Bypass Turbofan Engine during VIPR Phase III Testing

The Vehicle Integrated Propulsion Research (VIPR) Phase III project was executed at Edwards Air Force Base, California, by the National Aeronautics and Space Administration and several industry, academic, and government partners in the summer of 2015. One of the research objectives was to use external radial acoustic microphone arrays to detect changes in the noise characteristics produced by the research engine during volcanic ash ingestion and seeded fault insertion scenarios involving bleed air valves. Preliminary results indicate the successful acoustic detection of suspected degradation as a result of cumulative exposure to volcanic ash. This detection is shown through progressive changes, particularly in the high-frequency content, as a function of exposure to greater cumulative quantities of ash. Additionally, detection of the simulated failure of the 14th stage stability bleed valve and, to a lesser extent, the station 2.5 stability bleed valve, to their fully-open fail-safe positions was achieved by means of spectral comparisons between nominal (normal valve operation) and seeded fault scenarios.

noise spectra↗