Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pilot Inputs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Incipient Sensor Fault Impacts on Building Performance Through HVAC Controls: A Pilot Study

Sensors are crucial input components for HVAC controls. Studies show faults are common for buidings and HVAC systems. Sensors with faults will compromise the control perfrormance regardless how advanced of the control algorithms. Majority studies assume the sensor fault to be constant the whole year. In reality, the sensor faults might evolve or develop with time, which is essentially the incipient (i.e. evolving) fault. The incipient sensor faults impacts remain a research gap. This study aims to investigate the incipient sensor fault impacts to control sequences of multi-zone VAV boxes and AHU system following the ASHRAE Guideline 36-2018: High-Performance Sequences of Operation.

Li, Yanfei↗

Machine learning modeling and model predictive control of a closed-circuit reverse osmosis system

Closed-circuit reverse osmosis (CCRO) offers a flexible and energy-efficient alternative to conventional reverse osmosis by operating in a semi-batch mode that recycles brine, enabling higher recovery rates and reduced specific energy consumption (SEC). However, developing accurate, system-level dynamic models for CCRO remains challenging due to its nonlinear, multi-phase operation and sensitivity to variable feed water conditions. Traditional modeling approaches, such as NARMAX (nonlinear autoregressive moving average with exogenous inputs), often struggle to generalize across varying inlet feed concentrations, necessitating frequent parameter re-estimation and limiting their utility for real-time control applications. To address these limitations, we developed a long short-term memory (LSTM) neural network model trained on an extensive experimental data set from a CCRO pilot plant. The model accepts three inputs, feed flow rate, recirculation flow rate, and initial feed conductivity, and predicts three key outputs: reject conductivity, feed pump power draw, and recirculation pump power draw. We validated the LSTM model against experimental data, demonstrating its ability to distinguish between different feed conductivities and adapt to variable flow rates. Subsequently, we incorporated the LSTM model within a nonlinear model predictive control (MPC) scheme and conducted closed-loop simulations to optimize the integrated SEC (iSEC). In conclusion, the results project up to a 6% reduction in iSEC by using MPC to optimize performance over the entire experiment duration, without requiring any random excitation for data collection or parameter re-estimation.

Desalination↗

Is Clean Hydrogen Production a Good Fit for Questa? Intermediate Feasibility Study Results

NREL conducted a feasibility study for a clean hydrogen production facility that would be located in Questa, New Mexico. This slide deck presents the history of the coalition of stakeholders that received NREL technical assistance through the Department of Energy's Communities Leading Energy Action Program. It describes how hydrogen is generated and its end uses. It describes two conceptual applications explored in the feasibility analysis, a grid-tied power generation and long-term storage application and a heavy-duty vehicle fueling application. The presentation details the configuration of these to applications in the Questa pilot facility, including system components, required inputs (water, electricity, and land for pv generation), and outputs in kilograms of hydrogen, megawatt hours of power delivered, and hours of vehicle hours of operation. The presentation addresses key concerns raised by groups engaged through a public outreach process, including safety, health, and environmental issues; water use; visual impacts; and costs and alternatives.

heavy-duty vehicle fueling↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Community Input on the Need, Scope, and Development Roadmap of a Proposed National Virtual Biosecurity for Bioenergy Crops Center (NVBBCC)

Brookhaven National Laboratory (BNL) was awarded a pilot project in FY22 under the U.S. Department of Energy (DOE) Office of Science Biopreparedness Research Virtual Environment (BRaVE) initiative, to define research priorities, needs, and requirements for a national virtual center devoted to the biosecurity of bioenergy crops. The mission of the proposed center, referred to as the National Virtual Biosecurity for Bioenergy Crop Center (NVBBCC), would be to provide the scientific basis and tools to detect, characterize, model, and mitigate biothreats to bioenergy crops. This function will be essential to ensure the projected increased US reliance over the next few decades on key plant-based energy products, such as biojet fuel. The NVBBCC is envisioned as a distributed, virtual center with multiple national laboratories at its core to maximize the use of existing unique facilities and expertise across the DOE complex. A major goal of the pilot project was to develop a roadmap for establishing NVBBCC through a series of meetings to gather community input. A total of about 150 individuals, drawn from DOE laboratories, the USDA, academia, NIH, DHS and the private sector participated in six planning meetings held in FY23. Four of the meetings were focused on specific research topics (disease detection, dispersion and disease propagation, biomolecular characterization of plant-pathogen interaction, and mitigation strategies). These four meetings were followed by a meeting that focused on computational needs to support collaborative, data-intensive research within a distributed center as well as workforce development. A final meeting focused on establishing and maintaining preparedness within NVBBCC to respond to an emerging disease within bioenergy crops and how it would collaborate and coordinate with USDA and DHS.

09 BIOMASS FUELS↗

An Algorithm for Atom-Centered Lossy Compression of the Atomic Orbital Basis in Density Functional Theory Calculations

Large atomic-orbital (AO) basis sets of at least triple and preferably quadruple-ζ (QZ) size are required to adequately converge Kohn–Sham density functional theory (DFT) calculations toward the complete basis set limit. However, incrementing the cardinal number by one nearly doubles the AO basis dimension, and the computational cost scales as the cube of the AO dimension, so this is very computationally demanding. Here, in this work, we develop and test a threshold-based natural atomic orbital (NAO) scheme in which ϵ-NAOs are obtained as eigenfunctions of atomic blocks of the density matrix in a one-center orthogonalized representation. This enables compression of the AO basis that is optimal for a given threshold, 10 –ϵ , by discarding NAOs with occupation numbers below that threshold. Extensive pilot test calculations using the Hartree–Fock functional and taking the converged density matrix as input suggest that a threshold of 10 –5 can yield a compression factor (ratio of AO to compressed ϵ-NAO dimension) between 2.5 and 4.5 for the QZ pc-3 basis. The errors in relative energies are typically less than 0.1 kcal/mol when the compressed basis is used instead of the uncompressed basis. Between 10 and 100 times smaller errors (i.e., usually less than 0.01 kcal/mol) can be obtained with a threshold 10 –7 , while the compression factor is typically between 2 and 2.5.

basis sets↗

Design of Experiments for Dynamic Test Runs in Solvent-Based CO 2 Capture Pilot Plants

Test runs in the pilot plants consume significant resources, and therefore, the learning from test runs should be maximized. Test runs conducted in the pilot plants are often steady state. It takes several hours for reaching steady-state in the pilot plants, and thus, the duration of the test runs needs to be long even for collecting few steady-state data points. On the other hand, a large number of measurements can be collected through dynamic test runs in a short span of time. This paper presents a systematic design of dynamic experiments (DoDEs) for identifiability of model parameters, which is achieved by persistently exciting the inputs signals. A pseudorandom binary sequence (PRBS) is designed as the input signal for DoDE due to its efficiency in obtaining sufficient spectral content. However, due to the long sequence size of the PRBS signal, a Schroeder-phase input signal, which is a multisine signal, is also designed. Tests for both types of signals are run in the Pilot Solvent Test Unit (PSTU) at the National Carbon Capture Center in Wilsonville, Alabama. The transient data are used to solve dynamic data reconciliation and parameter estimation problem. The estimated parameters are found to be not only superior to those estimated from using data collected from hundreds of steady-state test runs in a nonreactive (air–water) system, but the parameters could be estimated by using the dynamic data collected for about 24 h from the pilot plant for the MEA-H 2 O–CO 2 system.

CO2 capture↗

LA100 Equity Strategies. Chapter 9: Equitable Community Solar Access and Benefits

The LA100 Equity Strategies project integrates community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. This chapter focuses on community solar as a means to provide equitable access to local solar and storage benefits in Los Angeles. Specifically, NREL identified potential community solar sites that could host 30 kilowatts (kW)1 of solar or more and evaluated economic and equity metrics under various program design options. Analysis included a Baseline scenario (business-as-usual) and an Equity scenario, which modeled program enhancements to increase access and benefits to low-income customers. Both scenarios modeled the economics of solar and storage under the LADWP Feed-in Tariff (FiT) program (LADWP 2023b) and the LADWP Feed-in-Tariff Plus Pilot program (LADWP 2023d) compared to a community solar financial model. This research was guided by input from the community engagement process, and associated equity strategies are presented in alignment with that guidance.

14 SOLAR ENERGY↗

Predicting Anaerobic Membrane Bioreactor Performance Using Flow-Cytometry-Derived High and Low Nucleic Acid Content Cells

Having a tool to monitor the microbial abundances rapidly and to utilize the data to predict the reactor performance would facilitate the operation of an anaerobic membrane bioreactor (AnMBR). This study aims to achieve the aforementioned scenario by developing a linear regression model that incorporates a time-lagging mode. The model uses low nucleic acid (LNA) cell numbers and the ratio of high nucleic acid (HNA) to LNA cells as an input data set. First, the model was trained using data sets obtained from a 35 L pilot-scale AnMBR. The model was able to predict the chemical oxygen demand (COD) removal efficiency and methane production 3.5 days in advance. Subsequent validation of the model using flow cytometry (FCM)-derived data (at time t – 3.5 days) obtained from another biologically independent reactor did not exhibit any substantial difference between predicted and actual measurements of reactor performance at time t. Further cell sorting, 16S rRNA gene sequencing, and correlation analysis partly attributed this accurate prediction to HNA genera (e.g., Anaerovibrio and unclassified Bacteroidales) and LNA genera (e.g., Achromobacter, Ochrobactrum, and unclassified Anaerolineae). In summary, our findings suggest that HNA and LNA cell routine enumeration, along with the trained model, can derive a fast approach to predict the AnMBR performance.

42 ENGINEERING↗

Clean Energy to Communities: Technical Assistance for Region Five, MN

The Region Five Development Commission (“R5DC”) serves five counties in Minnesota, USA and received an Energizing Rural Communities Prize through the U.S. Department of Energy. Currently, R5DC is piloting projects in the City of Motley, for which two energy audits have been conducted. R5DC is seeking input regarding which options to pursue based on these two audits, as well a framework for future audits to be as effective and helpful as possible. This report defines a framework for future audits for R5DC, by providing an overview of the requirements for different levels of audits and identifying available resources for conducting energy audits.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technical and Economic Evaluation of the First Ever Polymer Flood Field Pilot to Enhance the Recovery of Heavy Oils on Alaska's North Slope via Machine Assisted History Matching

Polymer flooding has become globally established as a potential enhanced oil recovery method for heavy oils. To determine whether this technology may be useful in developing the substantial heavy oil resources on the Alaska North Slope, a polymer flood field pilot commenced at the Milne Point Unit in August 2018. This study seeks to evaluate the results of the field pilot on a technical and economic basis. A reservoir simulation model is constructed and calibrated to predict the oil recovery performance of the pilot through machine-assisted reservoir simulation techniques. To replicate the early water breakthrough observed during waterflooding, transmissibility contrasts are introduced into the simulation model, forcing viscous fingering effects. In the ensuing polymer flood, these transmissibility contrasts are reduced to replicate the restoration of injection conformance during polymer flooding. Transmissibility contrasts are later reinstated to replicate fracture overextension interpreted in one of the producing wells. The calibrated simulation models produced at each stage of the history matching process are used to forecast oil recovery. These forecasts are used as input for economic analysis, incremental to waterflooding expectations. The simulation forecasts indicate that polymer flooding significantly increases the heavy oil production for this field pilot compared to waterflooding alone, yielding attractive project economics. However, meaningful variations between simulation scenarios demonstrate that a simulation model is only valid for prediction if flow behavior in the reservoir remains consistent with that observed during the history matched period. Critically, this means that a simulation model calibrated for waterflooding may not fully capture the technical and economic benefits of an enhanced oil recovery process such as polymer flooding. Subsequently, the simulation model and economic model are used in conjunction to conduct a sensitivity analysis for polymer flood design parameters, from which recommendations are provided for both the continued operation of the current field pilot and future polymer flood designs. The results demonstrate that a higher polymer concentration can be injected due to the development of fractures in the reservoir. The throughput rate should remain high without exceeding operating constraints. A calculated point-forward polymer utilization parameter demonstrates the decreasing efficiency of the polymer flood at later times in the pattern life. Future projects will benefit from starting polymer injection earlier in the pattern life. A pattern with tighter horizontal well spacing will observe a greater incremental benefit from polymer flooding.

Keith, Cody↗

Estimation of pipe failure frequencies in the absence of operational experience data: A pilot study

Probabilistic failure metrics such as leak frequency and rupture frequency are commonly used to characterize piping reliability. The methodologies for calculating the failure metrics rely on a complex set of input parameters. Operating experience data and experimental data play an important role in informing the different input parameters. The paper describes results and conclusions of a coordinated research project to benchmark three different reliability models using a four-step procedure: reference case definition of relevance to advanced reactor designs, input parameter calibration, validation of results, and application of different methodologies upon completion of the calibration and validation steps. The reference case is a weld consisting of nickel-base alloy 152/52 and located within a primary pressure boundary of an advanced reactor. This alloy is a class of structural materials known to be highly resistant to stress corrosion cracking. Synergies between the different methods are noted and the importance of a multi-disciplinary approach to input parameter development is underscored. A key conclusion is that the three methods are equally suitable for estimating failure frequencies. In any specific application, a selection of the most practical or effective computational tool can be considered. The comparison of alternative models confirms and helps to gain confidence in the computed failure frequency estimates. The study was part of a coordinated research project organized by the International Atomic Energy Agency.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Annual Transuranic Waste Inventory Report – 2022 (Data Cutoff Date 12/31/2021)

The purpose of this Annual Transuranic Waste Inventory Report (ATWIR) – 2022 is to document the inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2021. This report also notes major changes to the inventory since the ATWIR-2021, which had a data cutoff date of December 31, 2020. This updated inventory information is available to the U.S. Department of Energy (DOE) TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports the DOE Carlsbad Field Office (CBFO) input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act evaluations), performance assessments, planned changes, and other design changes as needed for the WIPP project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The SMART Cables Initiative for Ocean and Geophysical Observing [Slides]

SMART Cables are becoming a reality, and have the potential to revolutionize submarine oceanographic and geophysical sensing. Pilot / demonstration projects are underway to test the technology and explore the feasibility of incorporating both in-repeater standardized sensor packets but also ancillary sensor types on external, branching nodes. The projects currently in planning will set the standard and influence the norms for the future of SMART systems. The interest of all potential stakeholders and users, and input as to needs and concerns, is welcomed as testing proceeds.

54 ENVIRONMENTAL SCIENCES↗

Modeling Approach for the Aluminum-clad Dry Storage Pilot using HFIR Fuel

To confirm that the dry storage of aluminum-clad research reactor spent nuclear fuel (ASNF) will remain within the safety envelope after applied drying schemes and that the resulting evolution of the gas space composition, temperature, and pressure conditions are understood, a dry storage pilot project is being established. The pilot will incorporate an instrumented lid for discrete interval or for on-demand gas composition and temperature monitoring of two DOE Standard Canisters (DSCs) loaded with three High Flux Isotope Reactor (HFIR) inner cores per DSC. Each DSC would be subjected to a separate alternative candidate drying scheme. Canisters will undergo 1 to 5 years of monitoring, including internal temperature and gas sampling to track pressure and composition changes. This report outlines the approach for modeling the ASNF-in-canister behavior in terms of evolving gas space conditions for the ASNF dry storage pilot using HFIR fuel. The ASNF has an adherent surface oxyhydroxide layer comprised of boehmite/bayerite that generates hydrogen when subjected to irradiation. Three-dimensional multi-physics computational fluid dynamics simulations will be executed to compute the thermal field within the DSC and provide inputs to a chemical model employed to compute pressure buildup as hydrogen is generated in the system. Implemented in Cantera, the chemical model solves gas phase and aluminum oxyhydroxide surface-mediated radiolysis reactions. Gas phase reactions are sourced from Wittman and Hanson (2015), whereas surface-mediated reactions are incorporated by fitting experimental data using an optimization algorithm (Abboud, 2023). Water radiolysis reactions from Wren and Ball (2001) are adopted with modifications as described in Abboud (2023c). Understanding the effect of the hydrogen buildup over time is important for long-term storage safety considerations. Modeling results will include the canister pressure, temperature, and composition evolution from the initial helium backfill with the addition of radiolytically-evolved chemical species (e.g., hydrogen and oxygen). The specific HFIR cores for the pilot program have not yet been selected, and the overall design is still in development. The CFD-chemical model used for this work will be based on prior models with necessary updates to allow for improved accuracy and efficiency. The experimental data obtained from the HFIR demonstration will be used to improve and validate the computational models to predict the ASNF-in-canister behavior.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Report for FE0032098: Improving the cost-effectiveness of algal CO2 utilization by synergistic integration with power plant and wastewater treatment operations

The overall goal of this project was to demonstrate an engineering-scale open raceway pond algae cultivation system (approximately 180 m²), including the integration of technologies that utilized carbon dioxide (CO₂) from a coal-fired power plant and wastewater-derived nutrient inputs for cost-effective and environmentally friendly biomass production. The key advantages associated with the innovative algae cultivation system and its integration with wastewater treatment functions, as described herein, had been demonstrated in previous bench- and pilot-scale work by the project team partners. This project combined those approaches to maximize practical benefits and available synergies, resulting in a significant reduction in the net cost of producing algal biomass products. The primary target algal species for the project was Spirulina, which served as a high-protein content ingredient for food and animal feed. Spirulina was selected because it had already been approved by the FDA, was in use as a food ingredient, and commanded prices of up to $30/kg. It had a typical protein content of 50–75%, comparable to other high-protein concentrates, featured high digestibility without requiring pretreatment, and offered a high conversion ratio in animal feed applications. In addition, Spirulina had a relatively high content of the blue pigment phycocyanin, which could be extracted as a high-value co-product prior to using the remaining biomass for nutritional purposes.

Schideman, Lance [University of Illinois]↗