An assessment of PERT as a technique for schedule planning and control

The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.

Sibbers, C. W.↗

General purpose aft cargo carrier study, volume 1

The Space Transportation System (STS) documents were reviewed to determine their applicability to the Aft Cargo Carrier (ACC). The ACC requirements were developed to assure that the appropriate STS requirements were met. Payload accommodations/interface was discussed. The configuration, structural details, and subsystems of the ACC design are described. Mission analysis, planning schedules, and cost are summarized.

Source record↗

Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

Drummond, Mark↗

Analyzing Launch Operations using the Spaceport Throughput Analysis Resource (STAR)

NASA’s Kennedy Space Center (KSC) and Cape CanaveralSpace Force Station (CCSFS) are the world’s preeminent multi-user spaceport, providing facilities and launch capabilities to the agency, NASA’s commercial partners, and other government agencies. KSC works to ensure an environment in which NASA’s programs and other users can safely and effectively carry out their operations. Approximately 100 launches are expected to take place in 2024. KSC needs to meet the needs of customers who request launches based on their own schedules, but who may not be aware of KSC-wide resource limitations and external constraints on launch operations. KSC-wide resources include telecommunications, range tracking, commodities such as Helium and Nitrogen, and special equipment needed to support launches. External constraints include seasonal launch operations. Since space vehicles are complex and launch operations are uncertain, unexpected events can also cause delays in operations. The Spaceport Throughput AnalysisResource (STAR) assesses whether a specific set of pro-posed launches and associated activities can be performed given the resources KSC currently has available, and external constraints imposed on KSC operations. STAR integrates short-horizon scheduling and simulation of launches using a monte-carlo approach driven by configurable probabilities of different classes of event outcomes, including de-lays and worst-case use of resources. The resulting analyses inform stakeholders of key constraints preventing customers from being able to perform their missions as desired, and give insight into how to improve spaceport throughput. The rest of the paper is organized as follows. In 2 we de-scribe the problem STAR is intended to solve. In Section3 we formally describe the scheduling problem ingredients. In Section 4 we describe how manifests are simulated. InSection 5 we describe the constraints problem that is solved when rescheduling. In Section 6 we describe what information is recorded during manifest simulation in order to evaluate delays. In Section 7 we describe the specific problem solved for KSC. In Section 8 we describe the challenges of knowledge engineering for STAR.

Planning Scheduling Analysis↗

Automatic planning concept - An analysis of optimum scheduling

Study considers resource costs, mission constraints, and experiment results as linear functions, insofar as possible, in an effort to develop optimum scheduling by the use of linear programming. It involves a mathematical approach in which a number of constraints are considered operative.

Rebelein, P. R.↗

A review of European applications of artificial intelligence to space

The purpose is to describe the applications of Artificial Intelligence (AI) to the European Space program that are being developed or have been developed. The results of a study sponsored by the Artificial Intelligence Research and Development program of NASA's Office of Advanced Concepts and Technology (OACT) are described. The report is divided into two sections. The first consists of site reports, which are descriptions of the AI applications seen at each place visited. The second section consists of two summaries which synthesize the information in the site reports by organizing this information in two different ways. The first organizes the material in terms of the type of application, e.g., data analysis, planning and scheduling, and procedure management. The second organizes the material in terms of the component technologies of Artificial Intelligence which the applications used, e.g., knowledge based systems, model based reasoning, procedural reasoning, etc.

Drummond, Mark↗

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating tactical planning, operational planning and scheduling using data-driven feasibility analysis

Supply chain operations and scheduling are well-studied problems in the literature. Although these problems are related, they are often solved sequentially. This uncoordinated approach usually leads to sub-optimal solutions. Here this paper proposes a methodology for integrating scheduling operations into the supply chain network, motivated by the available enterprise data, and feasibility analysis. Existing literature on integrated models for addressing the supply chain is reviewed and classified. Then the mathematical model formulation for each level is discussed, after which the proposed data-driven integrated framework is described. The methodology is tested on two different case studies of varying dimensions. For each case study, the solution solves a multi-objective problem with the overall aim of an optimal solution that is robust towards achieving optimal cost while keeping customer satisfaction in mind.

42 ENGINEERING↗

Design study of the deepsky ultraviolet survey telescope

Preliminary mechanical design and specifications are presented for a wide field ultraviolet telescope and detector to be carried as a Spacelab payload. Topics discussed include support structure stiffness (torsional and bending), mirror assembly, thermal control, optical alignment, attachment to the instrument pointing pallet, control and display, power requirements, acceptance and qualification test plans, cost analysis and scheduling. Drawings are included.

Page, N. A.↗

Mission Operations Centers (MOCs): Integrating key spacecraft ground data system components

In an environment characterized by decreasing budgets, limited system development time, and user needs for increased capabilities, the Mission Operations Division (MOD) at the National Aeronautics and Space Administration Goddard Space Flight Center initiated a new, cost-effective concept in developing its spacecraft ground data systems: the Mission Operations Center (MOC). In the MOC approach, key components are integrated into a comprehensive and cohesive spacecraft planning, monitoring, command, and control system with a single, state-of-the-art graphical user interface. The MOD is currently implementing MOC's, which feature a common, reusable, and extendable system architecture, to support the X-Ray Timing Explorer (XTE), Tropical Rainfall Measuring Mission (TRMM), and Advanced Composition Explorer (ACE) missions. As a result of the MOC approach, mission operations are integrated, and users can, with a single system, perform real-time health and safety monitoring, real-time command and control, real-time attitude processing, real-time and predictive graphical spacecraft monitoring, trend analysis, mission planning and scheduling, command generation and management, network scheduling, guide star selection, and (using an expert system) spacecraft monitoring and fault isolation. The MOD is also implementing its test and training simulators under the new MOC management structure. This paper describes the MOC concept, the management approaches used in developing MOC systems, the technologies employed and the development process improvement initiatives applied in implementing MOC systems, and the expected benefits to both the user and the mission project in using the MOC approach.

Harbaugh, Randy↗

Space-based solar power conversion and delivery systems study. Volume 2: Engineering analysis of orbital systems

Program plans, schedules, and costs are determined for a synchronous orbit-based power generation and relay system. Requirements for the satellite solar power station (SSPS) and the power relay satellite (PRS) are explored. Engineering analysis of large solar arrays, flight mechanics and control, transportation, assembly and maintenance, and microwave transmission are included.

Source record↗

Guidelines, processes and tools for coastal ecosystem restoration, with examples from the United States

This paper presents a systematic approach to coastal restoration projects in five phases: planning, implementation, performance assessment, adaptive management, and dissemination of results. Twenty features of the iterative planning process are synthesized. The planning process starts with a vision, a description of the ecosystem and landscape, and goals. A conceptual model and planning objectives are developed, a site is selected using prioritization techniques, and numerical models contribute to preliminary designs as needed. Performance criteria and reference sites are selected and the monitoring program is designed. The monitoring program is emphasized as a tool to assess project performance and identify problems affecting progression toward project goals, in an adaptive management framework. Key approaches to aspects of the monitoring program are reviewed and detailed with project examples. Within the planning process, cost analysis involves budgeting, scheduling, and financing. Finally, documentation is peer reviewed prior to making construction plans and final costing.

54 ENVIRONMENTAL SCIENCES↗

Mission planning and analysis division development plan for STS-2 through STS-4

The baseline products, schedules, and resource requirements for the Mission Planning and Analysis Division's support of Space Transportation System flights 2, 3, and 4 are presented. Major functions addressed are: orbiter software, Mission Control Center software, flight design, flight operations support, simulation tools, and postflight analysis.

Source record↗

A dynamic satellite simulation testbed based on CLIPS and CLIPS-derived tools

We were motivated to define and build a sophisticated satellite simulation capability for the evaluation at a satellite operations automated environment called IntelliSTAR. This architecture, and associated prototype, addresses the entire spacecraft operations cycle including planning, scheduling, task execution, and analysis. It is aimed at increasing the autonomous capability of current and future spacecraft. It utilizes advanced software techniques to address incomplete and conflicting data for making decisions. It also encompasses critical response time requirements, complex relationships among multiple systems, and dynamically changing objectives. Given the extreme scope of activities that are targeted, a sophisticated, flexible, and dynamic simulation environment was required to drive this prototype. In particular the derived requirements for evaluating the IntelliSTAR prototype include realistic and dynamic environment, easily reconfigurable, and multiple levels of fidelity.

Gathmann, Thomas P.↗

Sampling and Analysis Plan for Supplemental Environmental Project: Aquatic Life Surveys

As part of a settlement agreement for nuclear waste incidents in 2014, several supplemental environment projects (SEPs) were initiated at Los Alamos National Laboratory (LANL or the Laboratory) between the U.S. Department of Energy and the state of New Mexico. One SEP from this agreement consists of performing aquatic life surveys and will be used to assess the applicability of using generic ambient water-quality criteria (AWQC) for aquatic life. AWQC are generic criteria developed by the U.S. Environmental Protection Agency (EPA) to cover a broad range of aquatic species and are not unique to a specific region or state. AWQC are established by a composition of toxicity data, called species sensitivity distributions (SSDs), and are determined by LC50 (lethal concentration of 50% of the organisms studied) acute toxicity experiments for chemicals of interest. It is of interest to determine whether aquatic species inhabiting waters on the Pajarito Plateau are adequately protected using the current generic AWQC. The focus of this study will determine which aquatic species are present in ephemeral, intermittent, and perennial waters within LANL boundaries and from reference waters adjacent to LANL. If the species identified from these waters do not generally represent species used in the SSDs, then SSDs may need to be modified and AWQC may need to be updated. This sampling and analysis plan details the sampling methodology, surveillance locations, temporal scheduling, and analytical approaches that will be used to complete aquatic life surveys. A significant portion of this sampling and analysis plan was formalized by referring to Appendix E: SEP Aquatic Life Surveys DQO (Data Quality Objectives).

54 ENVIRONMENTAL SCIENCES↗

Design and architecture of the Mars relay network planning and analysis framework

In this paper we describe the design and architecture of the Mars Network planning and analysis framework that supports generation and validation of efficient planning and scheduling strategy. The goals are to minimize the transmitting time, minimize the delaying time, and/or maximize the network throughputs. The proposed framework would require (1) a client-server architecture to support interactive, batch, WEB, and distributed analysis and planning applications for the relay network analysis scheme, (2) a high-fidelity modeling and simulation environment that expresses link capabilities between spacecraft to spacecraft and spacecraft to Earth stations as time-varying resources, and spacecraft activities, link priority, Solar System dynamic events, the laws of orbital mechanics, and other limiting factors as spacecraft power and thermal constraints, (3) an optimization methodology that casts the resource and constraint models into a standard linear and nonlinear constrained optimization problem that lends itself to commercial off-the-shelf (COTS)planning and scheduling algorithms.

Mars relay network planning analysis↗

Milestone 4: Test plan for Reusable Hydrogen Composite Tank System (RHCTS). Task 3: Composite tank materials

This document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.

Greenberg, H. S.↗