Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating tactical planning, operational planning and scheduling using data-driven feasibility analysis

Supply chain operations and scheduling are well-studied problems in the literature. Although these problems are related, they are often solved sequentially. This uncoordinated approach usually leads to sub-optimal solutions. Here this paper proposes a methodology for integrating scheduling operations into the supply chain network, motivated by the available enterprise data, and feasibility analysis. Existing literature on integrated models for addressing the supply chain is reviewed and classified. Then the mathematical model formulation for each level is discussed, after which the proposed data-driven integrated framework is described. The methodology is tested on two different case studies of varying dimensions. For each case study, the solution solves a multi-objective problem with the overall aim of an optimal solution that is robust towards achieving optimal cost while keeping customer satisfaction in mind.

42 ENGINEERING↗

Guidelines, processes and tools for coastal ecosystem restoration, with examples from the United States

This paper presents a systematic approach to coastal restoration projects in five phases: planning, implementation, performance assessment, adaptive management, and dissemination of results. Twenty features of the iterative planning process are synthesized. The planning process starts with a vision, a description of the ecosystem and landscape, and goals. A conceptual model and planning objectives are developed, a site is selected using prioritization techniques, and numerical models contribute to preliminary designs as needed. Performance criteria and reference sites are selected and the monitoring program is designed. The monitoring program is emphasized as a tool to assess project performance and identify problems affecting progression toward project goals, in an adaptive management framework. Key approaches to aspects of the monitoring program are reviewed and detailed with project examples. Within the planning process, cost analysis involves budgeting, scheduling, and financing. Finally, documentation is peer reviewed prior to making construction plans and final costing.

54 ENVIRONMENTAL SCIENCES↗

Sampling and Analysis Plan for Supplemental Environmental Project: Aquatic Life Surveys

As part of a settlement agreement for nuclear waste incidents in 2014, several supplemental environment projects (SEPs) were initiated at Los Alamos National Laboratory (LANL or the Laboratory) between the U.S. Department of Energy and the state of New Mexico. One SEP from this agreement consists of performing aquatic life surveys and will be used to assess the applicability of using generic ambient water-quality criteria (AWQC) for aquatic life. AWQC are generic criteria developed by the U.S. Environmental Protection Agency (EPA) to cover a broad range of aquatic species and are not unique to a specific region or state. AWQC are established by a composition of toxicity data, called species sensitivity distributions (SSDs), and are determined by LC50 (lethal concentration of 50% of the organisms studied) acute toxicity experiments for chemicals of interest. It is of interest to determine whether aquatic species inhabiting waters on the Pajarito Plateau are adequately protected using the current generic AWQC. The focus of this study will determine which aquatic species are present in ephemeral, intermittent, and perennial waters within LANL boundaries and from reference waters adjacent to LANL. If the species identified from these waters do not generally represent species used in the SSDs, then SSDs may need to be modified and AWQC may need to be updated. This sampling and analysis plan details the sampling methodology, surveillance locations, temporal scheduling, and analytical approaches that will be used to complete aquatic life surveys. A significant portion of this sampling and analysis plan was formalized by referring to Appendix E: SEP Aquatic Life Surveys DQO (Data Quality Objectives).

54 ENVIRONMENTAL SCIENCES↗

GradientGraph

Under this SBIR Phase II, Reservoir Labs has developed G2 Analytics, a new technology that allows network operators to analyze bottleneck and flow performance with high precision. G2 delivers a new analytical approach and framework to resolve a variety of key problems found in modern communication networks, including: traffic engineering, routing, flow scheduling, network design, capacity planning, resiliency analysis, network slicing, or service level agreement (SLA) management, among others. G2 leverages the bottleneck structure of congestion-controlled communication networks, a recent mathematical discovery by the Reservoir team [RL19b, RL20a, RL20b, RL21a]. Bottleneck structures reveal how perturbations on flows and links propagate through the network, providing an analytical framework to measure (qualitatively and quantitatively) the ripple effects induced as they traverse the network. Leveraging the mathematics of bottleneck structures, Reservoir Labs is developing the G2 technology to provide network operators with a framework to design, optimize and troubleshoot network performance. This delivery includes the G2 software stack.

Yellamraju, Sruthi↗

Heavy-duty diesel engine NO{sub x} reduction with nitrogen-enriched combustion air. Final CRADA report.

The concept of engine emissions control by modifying intake combustion gas composition from that of ambient air using gas separation membranes has been developed during several programs undertaken at Argonne. These have led to the current program which is targeted at heavy-duty diesel truck engines. The specific objective is reduction of NO{sub x} emissions by the target engine to meet anticipated 2007 standards while extracting a maximum of 5 percent power loss and allowing implementation within commercial constraints of size, weight, and cost. This report includes a brief review of related past programs, describes work completed to date during the current program, and presents interim conclusions. Following a work schedule adjustment in August 2002 to accommodate problems in module procurement and data analysis, activities are now on schedule and planned work is expected to be completed in September, 2004. Currently, we believe that the stated program requirements for the target engine can be met, based upon extrapolation of the work completed. Planned project work is designed to experimentally confirm these projections and result in a specification for a module package that will meet program objectives.

33 ADVANCED PROPULSION SYSTEMS↗

Work Plan for the Site-wide SSHAC Level 3 Probabilistic Seismic Hazard Analysis at INL

This work plan provides the overall framework, key activities, key tasks, and schedule for the execution of a probabilistic seismic hazard analysis at Idaho National Laboratory (INL). The probabilistic seismic hazard analysis will follow processes and procedures appropriate for the Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 study provided in U. S. Nuclear Regulatory Commission guidance, NUREG-2213. The SSHAC Level 3 probabilistic seismic hazard analysis (PSHA) is being conducted as an INL site-wide effort. The work plan was developed and revised by participants who will perform the SSHAC Level 3 PSHA. The work plan also includes the quality assurance requirements commensurate with American Society of Mechanical Engineers Nuclear Quality Assurance NQA 1 2008/2009 and 2011 Addendum for design nuclear facilities under the U.S. Department of Energy and U. S. Nuclear Regulatory Commission. The scope of the SSHAC Level 3 PSHA is designed to produce the mean-centered definition of the seismic hazard with the appropriate treatment of uncertainties supported by the associated technical justifications. The SSHAC Level 3 study will properly implement and completely document the activities of evaluation, integration, and documentation. The evaluation process will consider data, models, and methods proposed by the larger technical community that are relevant to the PSHA at INL. The integration process will build seismic-source and ground-motion characterization models that represent the center, body, and range of technically defensible interpretations, taking into consideration the outcomes of the evaluation process. Key tasks and activities—such as a project kickoff meeting, three workshops, four formal working meetings, and a briefing meeting with the Participatory Peer Review Panel—will occur for the seven-member technical integration teams to construct seismic-source and ground-motion-characterization models. Both preliminary and final hazard-input documents will be developed to perform sensitivity analyses and the final PSHA, respectively. The entire study will be thoroughly documented in draft and final reports. The Participatory Peer Review Panel will review the SSHAC Level 3 study from start to finish, including the draft and final INL Site-wide PSHA reports, so they can provide a closure letter documenting the study’s adherence to SSHAC processes and technical adequacy of the final products.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Use of 3.0-T MRI for Stereotactic Radiosurgery Planning for Treatment of Brain Metastases: A Single-Institution Retrospective Review

Purpose: To investigate the efficacy of 3.0-T magnetic resonance imaging (MRI) for detecting brain metastases for stereotactic radiosurgery (SRS) planning. Methods and Materials: All adult patients scheduled for SRS treatment for brain metastases at our institution between October 2005 and January 2008 were eligible for analysis. All patients underwent radiosurgery treatment planning 3.0-T MRI on the day of scheduled radiosurgery and a diagnostic 1.5-T MRI in the days or weeks prior to radiosurgery for comparison. Both scans were interpreted by neuroradiologists who reported their findings in the radiology reports. We performed a retrospective review of the radiology reports to determine the number of brain metastases identified using each MRI system. Results: Of 254 patients scheduled for treatment from October 2005 to January 2008, 138 patients had radiology reports that explicitly described the number of metastases identified on both scans. With a median interval of 17 days (range, 1-82) between scans, the number of metastases detected using 1.5-T MRI system ranged from 1 to 5 and from 1 to 8 using the 3.0 T-MRI system. Twenty-two percent of patients were found to have a greater number of metastases with the 3.0 T-MRI system. The difference in number of metastases detected between the two scans for the entire cohort ranged from 0 to 6. Neither histology (p = 0.52 by chi-sq test) nor time between scans (p = 0.62 by linear regression) were significantly associated with the difference in number of metastases between scans. Conclusions: The 3.0-T MRI system appears to be superior to a 1.5-T MRI system for detecting brain metastases, which may have significant implications in determining the appropriate treatment modality. Our findings suggest the need for a prospectively designed study to further evaluate the use of a 3.0 T-MRI system for stereotactic radiosurgery planning in the treatment of brain metastases.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Component Importance and Interdependence Analysis for Transmission, Distribution and Communication Systems

For critical infrastructure restoration planning, the real-time scheduling and coordination of system restoration efforts, the key in decision-making is to prioritize those critical components that are out of service during the restoration. For this purpose, there is a need for component importance analysis. While it has been investigated extensively for individual systems, component importance considering interdependence among transmission, distribution and communication (T&D&C) systems has not been systematically analyzed and widely adopted. In this study, we propose a component importance assessment method in the context of interdependence between T&D&C networks. Analytic methods for multilayer networks and a set of metrics have been applied for assessing the component importance and interdependence between T&D&C networks based on their physical characteristics. The proposed methodology is further validated with integrated synthetic Illinois regional transmission, distribution, and communication (T&D&C) systems, the results reveal the unique characteristics of component/node importance, which are strongly affected by the network topologies and cross-domain node mapping.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Extracting and Generating PV Soiling Profiles for Analysis, Forecasting, and Cleaning Optimization

The identification and prediction of the daily soiling profiles of a photovoltaic site is essential to plan the optimal cleaning schedule. In this article, we analyze and propose various methods to extract and generate photovoltaic soiling profiles, in order to improve the analysis and the forecast of the losses. New soiling rate extraction methods are proposed to reflect the seasonal variability of the soiling rates and, for this reason, are found to identify the most convenient cleaning day with the highest accuracy for the investigated sites. Also, we present an approach that could be used to predict future soiling losses through the implementation of stochastic weather generation algorithms whose ability to identify in advance the best cleaning schedule is also successfully tested. The methods presented in this article can optimize the operation and maintenance schedule and could make it possible, in the future, to predict soiling losses through analysis based only on environmental parameters, such as rainfall and particulate matter, without the need of long-term soiling data.

14 SOLAR ENERGY↗

Materials for Advanced Ultrasupercritical Steam Turbines Task 4: Cast Superalloy Development

The Steam Turbine critical stationary structural components are high integrity Large Shell and Valve Casing heavy section Castings, containing high temperature steam under high pressures. Hence to support the development of advanced materials technology for use in an AUSC steam turbine capable of operating with steam conditions of 760°C (1400°F) and 35 Mpa (5000 psia), Casting alloy selection and evaluation of mechanical, metallurgical properties and castability with robust manufacturing methods are mandated. Alloy down select from Phase 1 based on producability criteria and creep rupture properties tested by NETL-Albany and ORNL directed the consortium to investigate cast properties of Haynes 282 and Haynes 263. The goals of Task 4 in Phase 2 are to understand a broader range of mechanical properties, the impact of manufacturing variables on those properties. Scale up the size of heats to production levels to facilitate the understanding of the impact of heat and component weight, on metallurgical and mechanical behavior. GE Power & Water Materials and Processes Engineering for the Phase 2, Task 4.0 Castings work, systematically designed and executed casting material property evaluation, multiple test programs. Starting from 15 lbs. cylinder castings to world’s first 17,000 lbs. poured weight, heavy section large steam turbine partial valve Haynes 282 super alloy casting. This has demonstrated scalability of the material for steam Turbine applications. Activities under Task 4.0, Investigated and characterized various mechanical properties of Cast Haynes 282 and Cast Nimonic 263. The development stages involved were: 1) Small Cast Evaluation: 4 inch diam. Haynes 282 and Nimonic 263 Cylinders. This provided effects of liquidus super heat range and first baseline mechanical data on cast versions of conventional vacuum re-melted and forged Ni based super alloys. 2) Step block castings of 300 lbs. and 600 lbs. Haynes 282 from 2 foundry heats were evaluated which demonstrated the importance of proper heat treat cycles for Homogenization, and Solutionizing parameters selection and implementation. 3) Step blocks casting of Nimonic 263: Carried out casting solidification simulation analysis, NDT inspection methods evaluation, detailed test matrix for Chemical, Tensile, LCF, stress rupture, CVN impact, hardness and J1C Fracture toughness section sensitivity data and were reported. 4) Centrifugal Casting of Haynes 282, weighing 1400 lbs. with hybrid mold (half Graphite and half Chromite sand) mold assembly was cast using compressor casing production tooling. This test provided Mold cooling rates influence on centrifugally cast microstructure and mechanical properties. Graphite mold section out performs sand mold across all temperatures for 0.2% YS; %Elongation, %RA, UTS at 1400°F. Both Stress-LMP and conditional Fracture toughness plots data were in the scatter band of the wrought alloy. 5) Fundamental Studies on Cooling rates and SDAS test program. Evaluated the influence of 6 mold materials Silica, Chromite, Alumina, Silica with Indirect Chills, Zircon and Graphite on casting solidification cooling rates. Actual Casting cooling rates through Liquidus to Solidus phase transition were measured with 3 different locations based thermocouples placed in each mold. Compared with solidification simulation cooling rates and measurement of SDAS, microstructure features were reported. The test results provided engineered casting potential methods, applicable for heavy section Haynes 282 castings for optimal properties, with foundry process methods and tools. 6) Large casting of Haynes 282 Drawings and Engineering FEM models and supplemental requirements with applicable specifications were provided to suppliers for the steam turbine proto type feature valve casing casting. Molding, melting and casting pouring completed per approved Manufacturing Process Plan during 2014 Q4. The partial valve casing was successfully cast after casting methods were validated with solidification simulation analysis and the casting met NDT inspection and acceptance criteria. Heat treated and sectioned to extract trepan samples at different locations comparing with cast on coupons test data. Material properties requisite for design, such as tensile, creep/rupture, LCF, Fracture Toughness, Charpy V-notch chemical analysis testing were carried out. The test results will be presented in the final report. The typical Haynes 282 large size Steam Turbine production casting from Order to Delivery foundry schedule with the activity break up is shown in Figures 107 and 108. • From Purchase Order placement to Casting pouring ~ 26 weeks. 1. Sales and commercial review 3 2. Engineering Drawings/models review 4 3. Pattern and core box manufacturing 6 4. Casting process engineering review 4 5. FEM and solidification simulation analysis 4 6. Gating & Feeder Attachments, Ceramic tiling 2 7. Molding and coremaking production scheduling 6 8. Melting planning and schedule 3 9. Pouring, cooling and shake out 2 • From Pouring to casting Delivery ~ 29 weeks 10. Shot blast and riser cutting, gates removal 3 11. Homogenizing , solutionizing HT furnace prep 4 12. Grinding, Fettling 2 13. Aging HT Cycle, cooling 2 14. VT and LPT NDT inspections 2 15. Radiographic inspection 4 16. Mechanical testing, Chemical analysis test certs 4 17. Casting weld repair upgrades and Aging PWHT 4 18. NDT after weld repairs and casting upgrades 3 19. Casting Final Inspection and test certifications 3 20. Package and delivery 2 Hence the Total Lead time from P.O to Casting delivery is approximately 55 weeks. The Task 4.2 and Task 4.3 activities and reporting completed.

Thangirala, Mani↗

One System Overview - 16579

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for managing and completing the River Protection Project mission, which is to 'safeguard the nuclear waste stored in Hanford's 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and Immobilization Plant for final disposition'. The Office of River Protection's work scope is currently performed through two primary contracts: - The Tank Operations Contract, held by Washington River Protection Solutions LLC, (WRPS) includes the construction, operation, and maintenance activities necessary to safely store, retrieve, and transfer tank wastes; provide supplemental tank waste treatment; provide storage and/or disposal of primary and secondary waste streams; design, construction and commissioning of the Low-Activity Waste Pretreatment System; and support ORP to integrate Hanford Tank Waste Treatment and Immobilization Plant (WTP) completion and startup with Tank Farms operations. - The WTP Contract, held by Bechtel National, Inc. (BNI), includes the design, construction, and commissioning of a Pretreatment Facility, two vitrification facilities (one for high-level waste and one for low-activity waste), a dedicated analytical laboratory, and supporting facilities to treat radioactive tank wastes by immobilizing them into a stable glass waste form. One System was established as a means to improve the integration between the tank farms and the WTP project to support its safe and successful startup. One System's scope and purpose focus on mission integration consistent with DOE's plans to treat tank waste in phases, starting with direct feed of the low-activity waste stream to the WTP's Low-Activity Waste (LAW) Vitrification Facility (referred to as DFLAW). The One System organization now has four major focus areas: - Flowsheet Integration? Integrated River Protection Project (RPP) flowsheet development and management; developing a gaps, risks, and opportunities management plan and technical roadmap; and waste feed qualification. - Mission Analysis and Planning? Strategic planning, system planning, and modeling integration. - WTP Startup, Commissioning, and Operations Integration? Interface Control Document (ICD) management, coordinating facilities startup-to-commissioning-to-operations, contract directives and standards identification, and DFLAW program integration. - Project Integration and Controls? Integrated schedule, metrics/dashboards monitoring, and One System risk register. ORP established the DFLAW Program Office in February 2015 as one of its key performance goals. ORP staff, along with contractor managers, have identified roles and responsibilities for the each of the four major focus areas. One System has established an Executive Council and Governance Board to drive program progress and make decisions on DFLAW. This approach allows appropriate government and contractor senior management involvement in the DFLAW Program. Monthly critical path analysis on the integrated DFLAW schedule is being performed. Interface control documents specific to DFLAW have been developed, and system planning and modeling tools are being used to help define the DFLAW flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The CPAT Domain Model - How CPAT "Thinks" from an Analyst Perspective

To help effectively plan the management and modernization of its large and diverse fleet of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) commissioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This report contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EC Transmission Line Risk Identification and Mitigation Analysis

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements); (2) Underperformance of prototype, first unit, or production components during testing; (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The CPAT 2.0.2 Domain Model - How CPAT 2.0.2 "Thinks" From an Analyst Perspective.

To help effectively plan the management and modernization of their large and diverse fleets of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) and the Program Executive Office Combat Support and Combat Service Support (PEO CS &CSS) commissioned the development of a large - scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This report contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets. This report, which is an update to the original CPAT domain model published in 2015 (SAND2015 - 4009), covers important new CPAT features. This page intentionally left blank

97 MATHEMATICS AND COMPUTING↗

The Capability Portfolio Analysis Tool (CPAT): A Mixed Integer Linear Programming Formulation for Fleet Modernization Analysis (Version 2.0.2).

In order to effectively plan the management and modernization of their large and diverse fleets of vehicles, Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) commis- sioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thor- ough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation. This paper, which is an update to the original CPAT formulation document published in 2015 (SAND2015-3487), covers the formulation of important new CPAT features.

97 MATHEMATICS AND COMPUTING↗

The Capability Portfolio Analysis Tool (CPAT): A Mixed Integer Linear Programming Formulation for Fleet Modernization Analysis.

In order to effectively plan the management and modernization of its large and diverse fleet of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) commissioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thorough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data-driven optimization of mixed-integer bi-level multi-follower integrated planning and scheduling problems under demand uncertainty

The coordination of interconnected elements across the different layers of the supply chain is essential for all industrial processes and the key to optimal decision-making. Yet, the modeling and optimization of such interdependent systems are still burdensome. Here we address the simultaneous modeling and optimization of medium-term planning and short-term scheduling problems under demand uncertainty using mixed-integer bi-level multi-follower programming and data-driven optimization. Bi-level multi-follower programs model the natural hierarchy between different layers of supply chain management holistically, while scenario analysis and data-driven optimization allow us to retrieve the guaranteed feasible solutions of the integrated formulation under various demand considerations. We address the data-driven optimization of this challenging class of problems using the DOMINO framework, which was initially developed to solve single-leader single-follower bi-level optimization problems to guaranteed feasibility. This framework is extended to solve single-leader multi-follower stochastic formulations and its performance is characterized by well-known single and multi-product process scheduling case studies. Through our data-driven algorithmic approach, we present guaranteed feasible solutions to linear and nonlinear mixed-integer bi-level formulations of simultaneous planning and scheduling problems and further characterize the effects of the scheduling level complexity on the solution performance, which spans over several hundred continuous and binary variables, and thousands of constraints.

42 ENGINEERING↗