Search NASA⌕ Search

SEARCH · Search NASA

Results for “Plutonium Finishing Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Improving Efficiency with 3-D Imaging: Technology Essential in Removing Plutonium Processing Equipment from Plutonium Finishing Plant Gloveboxes

The Plutonium Finishing Plant at Hanford, Washington began operations in 1949 to process plutonium and plutonium products. Its primary mission was to produce plutonium metal, fabricate weapons parts, and stabilize reactive materials. These operations, and subsequent activities, were performed in remote production lines, consisting primarily of hundreds of gloveboxes. Over the years these gloveboxes and processes have been continuously modified. The plant is currently inactive and Fluor Hanford has been tasked to clean out contaminated equipment and gloveboxes from the facility so it can be demolished in the near future. Approximately 100 gloveboxes at PFP have been cleaned out in the past four years and about 90 gloveboxes remain to be cleaned out. Because specific commitment dates for this work have been established with the State of Washington and other entities, it is important to adopt work practices that increase the safety and speed of this effort. The most recent work practice to be adopted by Fluor Hanford D&D workers is the use of 3-D models to improve the efficiency of cleaning out radioactive gloveboxes at the plant. The use of 3-D models has significantly improved the work planning process by providing workers with a clear image of glovebox construction and composition, which is then used to determine cleanout methods and work sequences. The 3-D visual products enhance safety by enabling workers to more easily identify hazards and implement controls. In addition, the ability to identify and target the removal of radiological materials early in the D&D process provides substantial dose reduction for the workers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparing for safe and compliant open air demolition at Hanford's plutonium finishing plant - 15100

The Plutonium Finishing Plant (PFP), located in the 200 West Area of the U.S. Department of Energy (DOE) Hanford Site, began operations in 1949 and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut-down in 1996, and material stabilization completed in 2004. DOE contractor CH2M HILL Plateau Remediation Company (CH2M HILL) is tasked with the plant's deactivation, decommissioning, decontamination and demolition, to be completed by September 30, 2016. The project team, partnering with DOE-Richland Operations Office (DOE-RL), is exploring, evaluating and implementing efficiencies to safely and compliantly prepare the facility for demolition. Since 2008, employees have prepared approximately 75 percent of the complex for demolition. More than 90 percent of the 232 glove boxes have been removed from ventilation and more than 80 percent of pencil tank units have been dispositioned. As decontamination, deactivation and removal nears completion on the remaining glove boxes, pencil tanks and other radiological and chemical processing infrastructure, CH2M HILL and DOE-RL are making preparations to demolish PFP itself, a Hazardous Category II nuclear facility (HazCat II). Conventional techniques used to demolish buildings heavily contaminated with radiological hazards typically involve extensive hands-on work to remove Material at Risk (MAR) and decontaminate the building to low levels before conventional demolition techniques can be used to remove the building. A safe and more cost effective approach is packaging MAR located in hard to access areas of the plant and removing it during demolition. That process, combined with affixing remaining contamination to walls, floors and equipment, performing detailed air dispersion modeling before demolition and air monitoring and dust suppression during demolition, will reduce employee risk and is more efficient in demolishing a HazCat II facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NEUTRON MEASUREMENTS AT HANFORD’S PLUTONIUM FINISHING PLANT

The Pacific Northwest National Laboratory (PNNL) conducted neutron measurements at Hanford’s Plutonium Finishing Plant (PFP). The measurements were performed to evaluate the performance of the Hanford Standard Dosimeter (HSD) and the 8816 TLD component of the Hanford Combination Neutron Dosimeter (HCND) in the neutron fields responsible for worker neutron exposures. For this study, TEPC detectors and multisphere spectrometers were used to measure neutron dose equivalent rate, and multispheres were used to measure average neutron energy. Water-filled phantoms holding Hanford dosimeters were positioned at each measurement location. The phantoms were positioned in the same location where a multisphere measurement was taken and TEPCs were also positioned there. Plant survey meters were also used to measure neutron dose rates at all locations. Three measurement locations were chose near the HC-9B glovebox in room 228A of Building 234-5. The multisphere spectrometers measured average neutron energies in the range of 337 to 555 keV at these locations. Personal dose equivalent, Hp(10)n, as measured by the multisphere and TEPC, ranged from 2.7 to 9.7 mrem/h in the three locations. Effective dose assuming a rotational geometry (EROT) was substantially lower than Hp(10), ranging from 1.3 to 3.6 mrem/h. These values were lower than the reported values from dosimeters exposed on a rotating phantom. Effective dose assuming an AP geometry (EAP) was also substantially lower than Hp(10), ranging from 2.3 to 6.5 mrem/h. These values were lower than the reported values from the dosimeters on slab phantoms. Since the effective dose values were lower than reported values from dosimeters, the dosimeters were shown to be conservative estimates of the protection quantities.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Update on Demolition Strategy and Progress at Hanford's Plutonium Finishing Plant - 17161

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M) is currently demolishing the Plutonium Finishing Plant (PFP). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1988, the facility was formally shut-down in 1996 and material processing completed in 2004. In November 2016, the project team, partnering with DOE-Richland Operations Office (DOE-RL) began demolition of the building. CH2M and DOE-RL will demolish PFP as a Hazardous Category II nuclear facility (HazCat II). The PFP is considered one of the most hazardous buildings on the Hanford site; employees have performed some of the most hazardous work anywhere across the DOE Environmental Management complex. Since 2008, employees have removed much of the plutonium-processing infrastructure. Four main buildings make up the majority of the PFP complex. As of November 2016, one building is undergoing demolition, another is ready for demolition and, concurrently, demolition preparations continue in the remaining two buildings. That hazard mitigation work includes removing contaminated ventilation duct work, process lines and performing asbestos abatement. To ensure safe and compliant demolition, CH2M employees researched, trained and deployed personal protective equipment never before used on the Hanford Site to complete some of the most hazardous demolition preparations. Project management commissioned the development of an air dispersion model that dictated ready-for-demolition criteria and established conservative demolition parameters. Management also sequenced project work to allow demolition to occur while demolition preparations continue a safe distance away in adjacent buildings. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progression of Safe and Compliant Demolition of Hanford's Plutonium Finishing Plant - 16566

Department of Energy contractor CH2M HILL Plateau Remediation Company (CH2M) is about to begin demolition of the Plutonium Finishing Plant (PFP). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1988, the facility was formally shut-down in 1996 and material processing completed in 2004. The project team, partnering with DOE-Richland Operations Office (DOE-RL), is in the final stages of preparing to demolish the building by the Tri-Party Agreement Milestone date of September 30, 2016. Since 2008, employees have prepared approximately 85 percent of the building for demolition. All of the 52 pencil-shaped processing tanks and 95 percent of the 238 glove boxes have been removed. Work is progressing on dispositioning remaining glove boxes, filter boxes and ventilation ducts and chemical and drain lines. Demolition is scheduled to start in early 2016. In addition to wrapping up tasks like source term removal (or preparation for removal during pre-demolition) and decontamination, the project is also developing the strategy and process to perform physical open air demolition, including the use of 3D renderings and computer generated illustrations of building infrastructure to safely and compliantly demolish the building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Analysis of Actual and Potential Atmospheric Dispersion of Plutonium-239 from the Hanford Site Plutonium Finishing Plant

This report presents the results of two studies conducted to assess actual and potential plutonium-239 environmental contamination during demolition of the Plutonium Finishing Plant (PFP) at the Hanford Site near Richland, Washington. The assessments described herein were conducted by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). The overall objective of NARAC’s work is to help determine if contamination levels that warrant controls will extend beyond the established radiological control boundaries around the Hanford Site PFP in the course of further decontamination and demolition activities.

54 ENVIRONMENTAL SCIENCES↗

Discovery of Contamination Spread at the Plutonium Finishing Plant during Demolition Activities

Between December 14 and December 18, 2017, contamination was detected outside of the Contamination Area (CA) at the Plutonium Finishing Plant (PFP) demolition zone, including around the PFP offices and on multiple vehicles located outside the radiological boundary. The consequences of this event were personnel exposure and potential radiological contamination leaving the Hanford Site. The scope of this causal analysis is focused at the events leading up to and including the contamination spread outside the PFP CA and development of the corrective actions to prevent recurrence. Specific methods to be used upon resumption of demolition activities are under development at the time that this report is approved and will be fully vetted by the DOE-RL and the DOE Expert Panel. It should also be noted that studies of radiological emissions from Hanford are part of the routine National Emission Standards for Hazardous Air Pollutants Compliance Monitoring (NESHAPS) Program and are not addressed in this report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plutonium Contamination Issues in Hanford Soils and Sediments: Discharges from the Z-Plant (PFP) Complex

Beginning in 1945, weapons production activities at the Hanford Nuclear Reservation resulted in the discharge of large quantities of Pu and other transuranic elements to the subsurface. The vast majority of the transuranics were disposed in the Hanford central plateau (200 areas) predominately associated with activities at the Z-Plant (Plutonium Finishing Plant) complex. In the past the Pu and Am migrated deep into the subsurface at certain locations, although the Pu and other transuranics are not currently being detected in significant concentration in any associated groundwaters. Evaluation of the chemical form of the transuranics in the subsurface along with determining the mechanism(s) of the past subsurface migration is important in establishing strategies for long-term site management practices. Unfortunately, the chemical form of the transuranics in the deep subsurface sediments and the past mechanism of vertical migration remain largely unknown. This paper present a summary of the different waste types and locations where transuranics were disposed, the factors that could have lead to subsurface migration via different transport vectors, the information currently available on the chemical form of Pu in the subsurface, and a summary of current research needs.

54 ENVIRONMENTAL SCIENCES↗

ANALYSIS OF THE REACTIVITY OF RADPRO SOLUTION WITH COTTON RAGS

Rags containing RadPro{reg_sign} solution will be generated during the decontamination of the Plutonium Finishing Plant (PFP). Under normal conditions, the rags will be neutralized with sodium carbonate prior to placing in the drums. The concern with RadPro solutions and cotton rags is that some of the RadPro solutions contain nitric acid. Under the right conditions, nitric acid and cotton rags exothermically react. The concern is, will RadPro solutions react with cotton rags exothermically? The potential for a runaway reaction for any of the RadPro solutions used was studied in Section 5.2 of PNNL-15410, Thermal Stability Studies of Candidate Decontamination Agents for Hanford's Plutonium Finishing Plant Plutonium-Contaminated Gloveboxes. This report shows the thermal behavior of cotton rags having been saturated in one of the various neutralized and non-neutralized RadPro solutions. The thermal analysis was performed using thermogravimetric Analysis (TGA), Differential Thermal Analysis (DTA) and Accelerating Rate Calorimetry (ARC).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compilation of PRF Canyon Floor Pan Sample Analysis Results

On September 28, 2015, debris collected from the PRF (236-Z) canyon floor, Pan J, was observed to exhibit chemical reaction. The material had been transferred from the floor pan to a collection tray inside the canyon the previous Friday. Work in the canyon was stopped to allow Industrial Hygiene to perform monitoring of the material reaction. Canyon floor debris that had been sealed out was sequestered at the facility, a recovery plan was developed, and drum inspections were initiated to verify no additional reactions had occurred. On October 13, in-process drums containing other Pan J material were inspected and showed some indication of chemical reaction, limited to discoloration and degradation of inner plastic bags. All Pan J material was sealed back into the canyon and returned to collection trays. Based on the high airborne levels in the canyon during physical debris removal, ETGS (Encapsulation Technology Glycerin Solution) was used as a fogging/lock-down agent. On October 15, subject matter experts confirmed a reaction had occurred between nitrates (both Plutonium Nitrate and Aluminum Nitrate Nonahydrate (ANN) are present) in the Pan J material and the ETGS fixative used to lower airborne radioactivity levels during debris removal. Management stopped the use of fogging/lock-down agents containing glycerin on bulk materials, declared a Management Concern, and initiated the Potential Inadequacy in the Safety Analysis determination process. Additional drum inspections and laboratory analysis of both reacted and unreacted material are planned. This report compiles the results of many different sample analyses conducted by the Pacific Northwest National Laboratory on samples collected from the Plutonium Reclamation Facility (PRF) floor pans by the CH2MHill’s Plateau Remediation Company (CHPRC). Revision 1 added Appendix G that reports the results of the Gas Generation Rate and methodology. The scope of analyses requested by CHPRC includes the determination of common anions, gamma spectrometry, metals, corrosivity, organics and alpha spectrometry (note: alpha spectrometry was cancelled during the performance of this work with concurrence from CHPRC). Results may help elucidate the components that led to the unexpected reaction in the canyon as well as inform the radiological and hazardous characteristics. The specific anions, gamma emitters, organics and metals requested by CHPRC are provided in the analytical reports sections. The individual analyses were conducted under the Plutonium Finishing Plant (PFP) Floor Pan Evaluation Project Quality Assurance Project Plan (PFP Floor Pan Evaluation QAPP, Revision 0.) developed by PNNL specifically for this project. The final reports for each analysis set are included in this compilation of the results. Each package was reviewed under the PFP Floor Pan Evaluation Project Quality Assurance Project Plan so no additional reviews were conducted in this compilation task. The Gas Generation Rates in Appendix G were conducted under the PNNL “How Do I…” quality assurance program and were NOT conducted under the Plutonium Finishing Plant (PFP) Floor Pan Evaluation Project Quality Assurance Project Plan (PFP Floor Pan Evaluation QAPP, Revision 0.).

36 MATERIALS SCIENCE↗

Processing of Non-PFP Plutonium Oxide in Hanford Plants

Processing of non-irradiated plutonium oxide, PuO2, scrap for recovery of plutonium values occurred routinely at Hanford’s Plutonium Finishing Plant (PFP) in glovebox line operations. Plutonium oxide is difficult to dissolve, particularly if it has been high-fired; i.e., calcined to temperatures above about 400°C and much of it was. Dissolution of the PuO2 in the scrap typically was performed in PFP’s Miscellaneous Treatment line using nitric acid (HNO3) containing some source of fluoride ion, F-, such as hydrofluoric acid (HF), sodium fluoride (NaF), or calcium fluoride (CaF2). The HNO3 concentration generally was 6 M or higher whereas the fluoride concentration was ~0.5 M or lower. At higher fluoride concentrations, plutonium fluoride (PuF4) would precipitate, thus limiting the plutonium dissolution. Some plutonium-bearing scrap also contained PuF4 and thus required no added fluoride. Once the plutonium scrap was dissolved, the excess fluoride was complexed with aluminum ion, Al3+, added as aluminum nitrate, Al(NO3)3•9H2O, to limit collateral damage to the process equipment by the corrosive fluoride. Aluminum nitrate also was added in low quantities in processing PuF4.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

140,142 Cerium Resolved Resonance Region Evaluation [Slides]

The presentation covers an overview of 140,142 Ce Isotopes, including new evaluations of 140,142 Ce that were requested by the Hanford Plutonium Finishing plant to the Nuclear Criticality Safety Program. It also discusses current ENDF/B-VIII.0 evaluation, which has an error in the 1-2 keV range. It was evaluated using multi-level Breit-Wigner and 142Ce has room for extending resolved resonance region current upper limit from 13 keV. The presentation also discusses new transmission and capture measurements of nat Ce and 142 Ce from Klaus Guber. It also states that no known integral experiments prominently feature Cerium.

07 ISOTOPE AND RADIATION SOURCES↗

Air Dispersion Modeling of Radioactive Releases During Proposed 236Z Rubble Pile Removal Activities

This report is part of the planning process for the removal of the 236Z rubble remaining as of January 1, 2018, at the Plutonium Finishing Plant (PFP) on the Hanford Site. This report documents an analysis considering standard techniques for the removal of demolition rubble. It does not document any decisions about the removal approaches. This document is intended to guide the establishment of a boundary for the application of an air monitoring regime. Atmospheric dispersion modeling using estimated release rates has been conducted to provide information on the location and levels of radioactive contamination that may be expected as the result of rubble removal activities. Hourly meteorological data collected over a 6-year period (2004–2009) were used to examine the effects of wind speed, direction, and stability on projected concentrations of contaminants in air and deposited on nearby surfaces. The source terms modeled in this report were based on the residual transuranic contamination levels that are anticipated to remain in the 236Z rubble following building demolition. The potential airborne concentrations were established using the five-factor formula from DOE-HDBK-3010 (DOE 1994) considering material-at-risk, damage ratio, airborne release fraction, respirable fraction, and leak path factor. Radioactive contamination emissions were calculated by release mechanism and rubble pile area for on-shift and off-shift activities. The emissions from the applicable sources were combined to provide emissions estimates for each day from each cleanup area. The U.S. Environmental Protection Agency’s (EPA’s) AERMOD computer code was used to estimate atmospheric dispersion and deposition of the released radioactive materials in the immediate vicinity of the planned rubble removal activities Both airborne and surface concentrations were modeled with AERMOD. Hourly derived air concentrations (DAC) were modeled for an array of receptors covering the rubble pile site and surrounding area. Peak (95th and 99th percentile) values of time-integrated air concentrations at these receptor points are derived from these hourly values, with modeling results reported as total incremental air concentrations in DAC-hours occurring over the selected time period. Total accumulated deposition amounts were also evaluated with AERMOD using the same array of receptors, with results reported as disintegrations per minute (dpm) per 100 cm2. Each rubble pile was considered in terms of its size, location, and estimated contamination levels. The modeling was based on the assumed sequence of the rubble removal activities. The results in this report are based on cleanup schedules and methods proposed by CHPRC. As of January 1, 2018, there are broadly three large rubble piles (west, footprint, and east) remaining of the 236Z Building process cell. It is assumed that the overall cleanup will require either 1) 30 days over a 6-week period, or 2) 60 days over a 12-week period. Work was assumed to be performed during 10-hour day shifts. The analysis shows that some releases of radioactive material are to be anticipated during the cleanup of the 236Z rubble piles. The modeling results presented here are closely tied to the details of how the rubble removal is to be conducted. The results indicate that for the rubble removal, the radiological exposures from the planned activities are predicted to be well below the designated limits for air and soil exposures. The cleanup of the 236Z main process cell rubble is expected to release some alpha-emitting radionuclides. However, results based on 6 years of hourly climatological data, two representative cleanup periods, realistic mitigating actions, and a bounding source term indicate that concentrations at the fence line of the PFP facilities should remain well below 12 DAC-hours/week. The results presented in this report are a reevaluation of a subset of the results presented in PNNL-20173 Rev. 4.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Near-Facility Environmental Monitoring Data Report for Calendar Year 2008

Near-facility environmental monitoring is defined as monitoring near facilities that have the potential to discharge or have discharged, stored, or disposed of radioactive or hazardous materials. Monitoring locations are associated with nuclear facilities such as the Plutonium Finishing Plant, Canister Storage Building, and the K Basins; inactive nuclear facilities such as N Reactor and the Plutonium-Uranium Extraction (PUREX) Facility; and waste storage or disposal facilities such as burial grounds, cribs, ditches, ponds, tank farms, and trenches. Much of the monitoring consists of collecting and analyzing environmental samples and methodically surveying areas near facilities. The program is also designed to evaluate acquired analytical data, determine the effectiveness of facility effluent monitoring and controls, assess the adequacy of containment at waste disposal units, and detect and monitor unusual conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hanford Site Near-Facility Environmental Monitoring Data Report for Calendar Year 2007- Appendix 2

Near-facility environmental monitoring is defined as monitoring near facilities that have the potential to discharge or have discharged, stored, or disposed of radioactive or hazardous materials. Monitoring locations are associated with nuclear facilities such as the Plutonium Finishing Plant (PFP), Canister Storage Building (CSB), and the K Basins; inactive nuclear facilities such as N Reactor and the Plutonium-Uranium Extraction (PUREX) Facility; and waste storage or disposal facilities such as burial grounds, cribs, ditches, ponds, tank farms, and trenches. Much of the monitoring consists of collecting and analyzing environmental samples and methodically surveying areas near facilities. The program is also designed to evaluate acquired analytical data, determine the effectiveness of facility effluent monitoring and controls, assess the adequacy of containment at waste disposal units, and detect and monitor unusual conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Demolition and Disposition of 209-E Critical Mass Laboratory - 12267

The 209-E Critical Mass Laboratory was constructed in 1960 to provide a heavy shielded reactor room where quantities of plutonium or uranium in solution could be brought to near-critical configurations under carefully controlled and monitored conditions. In the late 1980's, the responsible contractor, Pacific Northwest National Laboratory (PNNL), was directed by the Department of Energy (DOE) to prepare the facility for unoccupied status. The facility was demolished under a Removal Action Work Plan pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The funding for this project was provided by the American Recovery and Reinvestment Act (ARRA). The primary rooms of concern with regards to contamination in 209-E facility, which is over 9,000 square feet, are the criticality assembly room (CAR), the mix room, and the change room. The CAR contained two reactor hoods (HO-140 and HO-170), which each had a high efficiency particulate air (HEPA) filter system. The CAR contained 13 tanks ranging from 38 L (10 gal) to 401 L (106 gal). Tanks TK-109 and TK-110 are below grade, and were removed as part of this demolition and disposition remedy. Nonradiological and radiological hazardous substances were removed, decontaminated, or fixed in place, prior to demolition. Except for the removal of below grade tanks TK-109 and TK-110, the facility was demolished to slab-on-grade. PNNL performed stabilization and deactivation activities that included removal of bulk fissile material and chemicals, flushing tanks, stabilizing contamination within gloveboxes and hoods, and packaging and removing waste. The removal of the contaminated plutonium equipment and materials from the 209E facility presented a number of challenges similar in nature to those associated with the inventory reduction and cleanup activities at the Plutonium Finishing Plant. Although there were no bulk fissile materials or chemicals within the facility, there were residual radiological materials (isotopes of plutonium and americium) in the tanks and hoods. The complexity of the remedy was present because of the various configurations of the tanks and hoods, combined with the residual contaminants. Because of the weight and dimensional configuration, size reduction of the slab tanks, as well as removal and disposal of the different material used for moderation and absorption, were two examples of challenges that were resolved to complete the remedy. One of the key methods developed and implemented at the facility was the design and construction of a shroud to allow the cutting of the Pu contaminated tanks. The shroud design, development and implementation at the 209E Project was an example of enhanced work planning and task hazards analysis with worker involvement. This paper will present the lessons learned from the 209E facility inventory reduction activities including the shroud and other methodologies used. The initial Lessons Learned discussion for this project was scheduled for late January 2012. This facility is the first open-air demolition of a highly contaminated plutonium-contaminated facility accomplished by CH2M Hill under the Plateau Remediation Contract. The demolition was completed without spread of contamination to the workers and the surrounding area. As with any project of this complexity, there are significant accomplishments, as well as experience that can be applied to future demolition of plutonium-contaminated facilities on the Hanford Site. These experiences will be documented at a later date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗