Search NASA⌕ Search

SEARCH · Search NASA

Results for “Port”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

150-kW Three-Port Custom-Core Transformer Design Methodology

The design of a 150-kW high-frequency three-port transformer (TPT) for a triple active bridge (TAB) converter application is the focus of this paper. A non-tradeoff inclusive design methodology for custom-core transformers is proposed. Classic transformer design methodologies based on complex trade-offs mechanisms require significant effort to adjust the design for commercially available pre-sized cores. The proposed design is based on the development of a set of design equations that allows to select the core dimensions and the turns numbers for the windings that best accomplish the transformer specifications. Experimental evidence verifying the proposed theoretical design methodology is presented in this work.

Christian, Shamar↗

An investigation at static conditions of nonaxisymmetric nozzle thrust reverser port geometry including effects of rounding and rotating the port corner

An investigation has been conducted in the static test facility of the Langley 16-Foot Transonic Tunnel to determine the effects of rounding and rotating the port corner of a nonaxisymmetric thrust reversing port. High pressure air was used to simulate jet exhaust at nozzle pressure ratios up to 6.0. The investigation indicates that using a rounded corner in the reverser port passage increases the discharge coefficient significantly compared to that of a sharp cornered thrust reversing port. Incorporating a rotating cylinder into the rounded corner reverser port passage provides no additional increase at cylinder revolutions per minute up to 10,000. (Revolutions per minute of 390,000 were necessary to achieve a surface velocity equal to the duct velocity.) Highest levels of discharge coefficient are obtained by providing a large, round, cylindrical surface in the port upstream wall. Locating the reverser port in a constant area duct results in higher discharge coefficients than locating the port in a convergent duct.

Arbiter, D. G.↗

Self port scanning tool : providing a more secure computing Environment through the use of proactive port scanning

Secure computing is a necessity in the hostile environment that the internet has become. Protection from nefarious individuals and organizations requires a solution that is more a methodology than a one time fix. One aspect of this methodology is having the knowledge of which network ports a computer has open to the world, These network ports are essentially the doorways from the internet into the computer. An assessment method which uses the nmap software to scan ports has been developed to aid System Administrators (SAs) with analysis of open ports on their system(s). Additionally, baselines for several operating systems have been developed so that SAs can compare their open ports to a baseline for a given operating system. Further, the tool is deployed on a website where SAs and Users can request a port scan of their computer. The results are then emailed to the requestor. This tool aids Users, SAs, and security professionals by providing an overall picture of what services are running, what ports are open, potential trojan programs or backdoors, and what ports can be closed.

nMap↗

Port Technical Assistance Program: A Proposed Initiative to Support U.S. Ports Through Energy Innovation

This document highlights the crucial importance of the maritime sector within the United States (U.S.) economy, serving as a key node for trade and global goods transportation. U.S. ports are currently grappling with challenges posed by rising shipping demands, the health impacts of diesel fuel reliance, and the technology adoptions of global trade partners due to increasing environmental regulations. This document proposes forming a technical assistance program, led by Pacific Northwest National Laboratory (PNNL), to help U.S. ports transition to sustainable energy solutions that not only improve environmental and community outcomes, but also enhance resilience to unexpected weather events and reduce pressure on local utilities. Coordinated by PNNL, this initiative would offer a web-based platform of consolidated resources and tools for comprehensive strategic planning and cost-benefit analysis. It also seeks to establish a collaborative network between ports and national laboratories to facilitate the sharing of best practices. The document suggests that optimizing resource allocation and providing tailored support could be achieved through strategic categorization of ports within this network, with relevant attributes and examples detailed in the report. The anticipated benefits of such a program could include increased efficiency and cost savings in port operations and the advancement of scientific innovation via alternative energy research. Also, it could enhance economic growth and competitiveness in international trade by enabling ports to meet shipping demands and develop resilient critical infrastructure through informed, long-term strategies.

33 ADVANCED PROPULSION SYSTEMS↗

Port Electrification Handbook: A reference to aid U.S. port energy transitions

Port electrification can take many forms, such as electrifying cargo handling equipment or deploying a microgrid to power critical port infrastructure. To help evaluate the growing challenge of increased electrification and its impacts on the system, Pacific Northwest National Laboratory developed this Port Electrification Handbook with support from the U.S. Department of Energy, Office of Electricity’s Microgrids R&D [research and development] program. The goals of this handbook are the following: (1) Help port operators and planners evaluate different electrification technologies; (2) Explain how these technologies could aid and impact ports and surrounding communities; and (3) Provide step-by-step considerations for port electrification.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Port Electrification Handbook: A Reference to Aid U.S. Port Energy Transitions

Port electrification can take many forms, such as electrifying cargo handling equipment or deploying a microgrid to power critical port infrastructure. To help evaluate the growing challenge of increased electrification and its impacts on the system, the U.S. Department of Energy, Office of Electricity’s Microgrids R&D [research and development] program created this Port Electrification Handbook through a project led by Pacific Northwest National Laboratory. The goals of this handbook are the following: help port operators and planners evaluate different electrification technologies, explain how these technologies could aid and impact ports and surrounding communities, provide step-by-step considerations for port electrification.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

W-band six-port network analyzer for two-port characterization of millimeter wave transistors

A W-band (75-100 GHz) six-port junction network analyzer was constructed from commercially available descrete waveguide components and was used for the direct two-port S-parameter measurement of active three-terminal devices. A comparison between the six-port and a down-converter-type frequency extender for a conventional network analyzer revealed the superior performance of the six-port. The application of the six-port to characterize a 0.1-micron gate-length HEMT at W-band is described, and representative results are presented.

Moeller, Karl J.↗

Porting the Kitten Lightweight Kernel Operating System to RISC-V

Hardware design in high-performance computing (HPC) is often highly experimental. Exploring new designs is difficult and time-consuming, requiring lengthy vendor cooperation. RISC-V is an open-source processor ISA that improves the accessibility of chip design, including the ability to do hardware/software co-design using open-source hardware and tools. Co-design allows design decisions to easily flow across the hardware/software boundary and influence future design ideas. However, new hardware designs require corresponding software to drive and test them. Conventional operating systems like Linux are massively complex and modification is time-prohibitive. In this paper, we describe our port of the Kitten lightweight kernel operating system to RISC-V in order to provide an alternative to Linux for conducting co-design research. Kitten's small code base and simple resource management policies are well matched for quickly exploring new hardware ideas that may require radical operating system modifications and restructuring. Our evaluation shows that Kitten on RISC-V is functional and provides similar performance to Linux for single-core benchmarks. This provides a solid foundation for using Kitten in future co-design research involving RISC-V.

Gordon, Nick↗

Hydrogen Applications for Energy Transition in Port and Airport Operations at the Port Authority of New York and New Jersey

The Port Authority of New York and New Jersey (PANYNJ) is focused on achieving meaningful reductions in emissions as part of its environmental sustainability efforts. To reach its 2030 target for reducing Scope 1 and Scope 2 carbon dioxide equivalent (CO2e) emissions and its goal of net-zero emissions by 2050, PANYNJ is exploring a range of energy solutions, including hydrogen technologies. This report evaluates the potential role of hydrogen in reducing emissions across key operational areas: vehicles, equipment, stationary power, aviation propulsion, and marine propulsion. It examines hydrogen's technical feasibility, infrastructure needs, and economic implications within PANYNJ's operational context. The findings aim to inform decisions as PANYNJ transitions to cleaner energy sources and reduces environmental impacts. Based on the existing literature and stakeholders' feedback, the report outlines both opportunities and challenges associated with hydrogen integration, providing insights to guide PANYNJ's future sustainability initiatives.

33 ADVANCED PROPULSION SYSTEMS↗

Port Hope Area Initiative - Port Granby Project: Managing Highly Heterogeneous Low-Level Radioactive Waste - 20327

The Port Granby Project is a large remediation project currently approximately 95% complete. Initial waste characterization was provided through a borehole sampling program. As the waste was excavated, it was found to be highly heterogeneous, ranging from essentially 'clean' material to hundreds of Bq/g. This heterogeneity resulted in constantly changing site conditions. Methods to adapt to these conditions are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrogen Infrastructure Analysis for the Port Applications [Slides]

The International Maritime Organization has committed to 50% reduction in GHG emissions by 2050 worldwide as of 2023. This analysis includes performing an inventory and modeling efforts to understand the energy, equipment and cost requirements to support decarbonization of cargo handling and shore power at U.S. Ports, along with assessment of zero- and near- zero emission fuel supplies at or near U.S. ports focused upon Hydrogen technologies. Initial market assessment for ocean going vessels for harbor support and ocean-going vessels is explored. An energy analysis is performed on the port system using a holistic approach and considering the port as an entire ecosystem that functions as a transportation and energy node. Presently, a comprehensive view is lacking for future analysis efforts, this analysis seeks to address this gap in data by evaluating four representative port types and the potential for utilizing hydrogen for the maritime industry. Every port is different, but broadly they could be bracketed into reference cases with scaling factors for the relative size of the port operations. These reference ports are for future use, potentially as baselines for analysis and development of demonstration programs. An equipment inventory for each reference port type (container, bulk, breakbulk, and inland waterway) is presented. A comparative analysis of fuel cell electric and battery electric equipment is conducted based on the following criteria: technology readiness level, refueling/charging time, operational range, energy consumption, and fuel cost savings compared to baseline internal combustion engine equipment. The tradeoffs and synergies between two alternative powertrains is highlighted. Based on energy and infrastructure analysis, average and high equipment utilization profiles across different port types is identified and quantified baseline fuel and electricity demand for various decarbonization scenarios. Based on the portfolio of equipment converted to fuel cell electric, the estimates of initial capital investment are provided for hydrogen refueling stations across ports. An energy demand model is developed that predicts well the all-electric cargo handling equipment annual energy consumption for ports with annual tonnage under 2 million twenty-foot equivalent units (TEUs). The model is a good rubric to follow for further energy demand models that can create a scalable solution to understand the energy needs of cargo handling equipment, whether they are all-electric, hydrogen fuel cell, or powered by another fuel-type. Zero and near-zero emission fuel supply at ports is evaluated looking into the characteristics of hydrogen, ammonia, and methanol as an alternative fuel, as well as the bunkering status. The readiness of reference ports to produce ammonia or methanol and bunker the fuel is examined based on the framework developed by the Global Maritime Forum and Rocky Mountain Institute.

08 HYDROGEN↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

The Impacts of Developing a Port Network for Floating Offshore Wind Energy on the West Coast of the United States

Floating offshore wind is a pre-commercial industry with the potential for significant market growth on the U.S. West Coast in the near future; however, significant investment in port infrastructure will be required to enable the industry to progress from demonstration projects to efficient and cost effective commercial deployment. Developing a system of ports that can enable commercial-scale floating wind development on the West Coast of the United States will require significant levels of funding and coordination between governments, industry, ports, and local communities. A critical first step to strategically planning these resources is understanding the number of ports (and associated investment) that would be required to support different phases of offshore wind projects, including manufacturing, installation, and operation. But simply tallying up these costs is not sufficient to understand how a robust network of ports could impact local communities, the environment, workforce development, the offshore wind industry, and the West Coast region as a whole. In this report, the authors present analyses and perspectives related to port development in California, Oregon, and Washington. We describe the requirements for floating offshore wind ports that conduct manufacturing, installation, and/or service activities, and estimate the investment and time frames required to construct these ports at suitable locations in West Coast states. We develop indicators for the vulnerability and workforce accessibility of coastal communities and consider the potential risks and benefits associated with port development in these locations. We model how the proximity of an offshore wind project to installation and operations ports can impact the levelized cost of energy of the project, and then consider how these costs could be affected by local or foreign supply chains. We build upon these analyses to develop scenarios with increasing levels of offshore wind deployment and port assets on the West Coast and show how these ports could enable deployment goals to be achieved. Finally, we draw upon outreach with key floating wind stakeholders to summarize five key challenges that will need to be overcome to develop a comprehensive port network, and present potential approaches that could help to address these obstacles.

17 WIND ENERGY↗