Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Grid Analysis and Operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

High-Performance Computing for Real-Time Grid Analysis and Operation

Power grids worldwide are undergoing an unprecedented transition as a result of grid evolution meeting information revolution. The grid evolution is largely driven by the desire for green energy. Emerging grid technologies such as renewable generation, smart loads, plug-in hybrid vehicles, and distributed generation provide opportunities to generate energy from green sources and to manage energy use for better system efficiency. With utility companies actively deploying these technologies, a high level of penetration of these new technologies is expected in the next 5-10 years, bringing in a level of intermittency, uncertainties, and complexity that the grid did not see nor design for. On the other hand, the information infrastructure in the power grid is being revolutionized with large-scale deployment of sensors and meters in both the transmission and distribution networks. The future grid will have two-way flows of both electrons and information. The challenge is how to take advantage of the information revolution: pull the large amount of data in, process it in real time, and put information out to manage grid evolution. Without addressing this challenge, the opportunities in grid evolution will remain unfulfilled. This transition poses grand challenges in grid modeling, simulation, and information presentation. The computational complexity of underlying power grid modeling and simulation will significantly increase in the next decade due to an increased model size and a decreased time window allowed to compute model solutions. High-performance computing is essential to enable this transition. The essential technical barrier is to vastly increase the computational speed so operation response time can be reduced from minutes to seconds and sub-seconds. The speed at which key functions such as state estimation and contingency analysis are conducted (typically every 3-5 minutes) needs to be dramatically increased so that the analysis of contingencies is both comprehensive and real time. An even bigger challenge is how to incorporate dynamic information into real-time grid operation. Today’s online grid operation is based on a static grid model and can only provide a static snapshot of current system operation status, while dynamic analysis is conducted offline because of low computational efficiency. The offline analysis uses a worst-case scenario to determine transmission limits, resulting in under-utilization of grid assets. This conservative approach does not necessarily lead to reliability. Many times, actual power grid scenarios are not studied, and they will push the grid over the edge and resulting in outages and blackouts. This chapter addresses the HPC needs in power grid analysis and operations. Example applications such as state estimation and contingency analysis are given to demonstrate the value of HPC in power grid applications. Future research directions are suggested for high performance computing applications in power grids to improve the transparency, efficiency, and reliability of power grids.

Contingency Analysis↗

Operator Insights and Usability Evaluation of Machine Learning Assistance for Power Grid Contingency Analysis

Introducing machine learning (ML) assistance into any established process comes with adoption barriers, including entrenched procedures, technological and human readiness levels, human-machine trust, and work culture resistance to change. These barriers are even greater in critical operations such as operating a national or regional power grid, in which both regulatory frameworks and the importance of maintaining reliability levels causes additional resistance to the adoption of new computational support. Developers of future systems and job aides must consider not only technical aspects, but also whether new systems are usable by power system operators. This work presents the methodology and results of a study to evaluate the usability and readiness of a prototype recommender system for power grid contingency analysis. We explore operator cognitive load and evaluate operator performance when solving a collection of scenarios both with and without recommender assistance. We also examine operator trust in the system. We report insights gained on the readiness of the system using a collection of evaluation techniques.

Human-Machine Teaming, Power Systems, usability ev↗

AMPS: An Augmented Matrix Formulation for Principal Submatrix Updates with Application to Power Grids

We present an augmented matrix approach to update the solution to a linear system of equations when the coefficient matrix is modified by a few elements within a principal submatrix. This problem arises in the dynamic security analysis of a power grid, where operators need to perform $N-x$ contingency analysis, i.e., determine the state of the system when up to $x$ links from $N$ fail. Our algorithms augment the coefficient matrix to account for the changes in it, and then compute the solution to the augmented system without refactoring the modified matrix. We provide two algorithms, a direct method, and a hybrid direct-iterative method for solving the augmented system. We also exploit the sparsity of the matrices and vectors to accelerate the overall computation. Our algorithms are compared on three power grids with PARDISO, a parallel direct solver, and CHOLMOD, a direct solver with the ability to modify the Cholesky factors of the coefficient matrix. We show that our augmented algorithms outperform PARDISO (by two orders of magnitude), and CHOLMOD (by a factor of up to 5). Further, our algorithms scale better than CHOLMOD as the number of elements updated increases. The solutions are computed with high accuracy. Our algorithms are capable of computing $N-x$ contingency analysis on a $778K$ bus grid, updating a solution with $x=20$ elements in $1.6 \times 10^{-2}$ seconds on an Intel Xeon processor.

Yeung, Yu-Hong↗

The value of improved wind power forecasting: Grid flexibility quantification, ramp capability analysis, and impacts of electricity market operation timescales

The value of improving wind power forecasting accuracy at different electricity market operation timescales was analyzed by simulating the IEEE 118-bus test system as modified to emulate the generation mixes of the Midcontinent, California, and New England independent system operator balancing authority areas. The wind power forecasting improvement methodology and error analysis for the data set were elaborated. Production cost simulation was conducted on the three emulated systems with a total of 480 scenarios, considering the impacts of different generation technologies, wind penetration levels, and wind power forecasting improvement timescales. The static operational flexibility of the three systems was compared through the diversity of generation mix, the percentage of must-run baseload generators, as well as the available ramp rate and the minimum generation levels. The dynamic operational flexibility was evaluated by the real-time upward and downward ramp capacity. Simulation results show that the generation resource mix plays a crucial role in evaluating the value of improved wind power forecasting at different timescales. In addition, the changes in annual operational electricity generation costs were mostly influenced by the dominant resource in the system. Lastly, the impacts of pumped-storage resources, generation ramp rates, and system minimum generation level requirements on the value of improved wind power forecasting were also analyzed.

17 WIND ENERGY↗

A Methodology for Evaluating Operator Usage of Machine Learning Recommendations for Power Grid Contingency Analysis

This work presents the application of a methodology to measure domain expert trust and workload, elicit feedback, and understand the technological usability and impact when a machine learning assistant is introduced into contingency analysis for real-time power grid simulation. The goal of this framework is to rapidly collect and analyze a broad variety of human factors data in order to accelerate the development and evaluation loop for deploying machine learning applications. We describe our methodology and analysis, and we discuss insights gained from a pilot participant about the current usability state of an early technology readiness level (TRL) artificial neural network (ANN) recommender.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Impact assessment of geomagnetic induced current neutral blocking devices with power electronics sources on distance relay for 230 kV transmission lines

Electrical grids increased the integration of power electronics sources onto transmission lines. In addition, recent reports show a significant rise in geomagnetic storms occurring in 2024. These geomagnetic storms can affect transmission lines by inducing electrical currents within them, potentially causing power outages due to overloaded power transformers. Geomagnetic induced current neutral blocking devices (GIC-NBDs) are capacitors on the ground of wye power transformers, to avoid damage caused by geomagnetic storms. The integration of distance relays and transmission lines with power electronics sources and GIC-NBDs needs to be studied to observe if GIC-NBDs and power electronics sources could adversely affect operation of the electrical grid. In this analysis, the effect of 2 MW power electronics sources and GIC-NBDs on distance relays is assessed for different 230 kV transmission line lengths in radial and nonradial power systems. The simulations measured the apparent impedances, with different electrical faults. Results for a typical 2,650 μF GIC-NBD application were presented on impedance plots, and the distance relay model operations were assessed. In conclusion, the tests for radial and nonradial power systems showed the behavior of the distance elements and source impedance ratios, assessing the effect of power electronics sources and GIC-NBDs on 230 kV transmission lines.

Distance relays↗

Role of Operating Flexibility in Planning Studies

This project was conceived to examine the flexibility needs of the future California power grid. The analysis explores the need to establish generation planning metrics and standards that explicitly consider the operating flexibility needs of the system as the State pursues its aggressive renewable power generation goals. New methods and tools have been developed to use high resolution models of the grid that take into account uncertainties regarding renewable generation, load, equipment reliability, and economic growth. These models leverage high performance computational resources to fully explore the range of possible grid conditions that may lead to loss of load. The cost effectiveness of operating policies and hardware configurations that increase grid flexibility are examined with the tools to provide actionable information to grid planners and stakeholders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Modal Analysis of Electric Power Grids - The Need for Dynamic State Estimation: Preprint

We articulate the reason why dynamic state estimation is needed to push the boundaries of the modal analysis of electric power grids in real-time operation. Then, we demonstrate how to unravel linear and nonlinear modes by using the extended dynamic mode decomposition along with estimates of the synchronous generators' rotor angles and rotor speed deviations from nominal speed. The estimated modes are associated with electromechanical oscillations that take place continuously in electric power grids because of imbalances between power generation and demand. The numerical simulations are performed on a synthetic, albeit realistic, 2,000-bus network that was designed to resemble the electric power grid of Texas.

61 RADIATION PROTECTION AND DOSIMETRY↗

Real-Time Modal Analysis of Electric Power Grids - The Need for Dynamic State Estimation

We articulate the reason why dynamic state estimation is needed to push the boundaries of the modal analysis of electric power grids in real-time operation. Then, we demonstrate how to unravel linear and nonlinear modes by using the extended dynamic mode decomposition along with estimates of the synchronous generators’ rotor angles and rotor speed deviations from nominal speed. The estimated modes are associated with electromechanical oscillations that take place continuously in electric power grids because of imbalances between power generation and demand. The numerical simulations are performed on a synthetic, albeit realistic, 2,000-bus network that was designed to resemble the electric power grid of Texas.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Guest Editorial Introduction to the Special Issue on 'Advanced Signal Processing Techniques and Telecommunications Network Infrastructures for Smart Grid Analysis, Monitoring, and Management'

Electrical power systems are undergoing a radical change in structure, components, and operational paradigms, and are progressively approaching the new concept of smart grids (SGs). Future power distribution systems will be characterized by the simultaneous presence of various distributed resources, such as renewable energy systems (i.e., photovoltaic power plant and wind farms), storage systems, and controllable/non-controllable loads. Control and optimization architectures will enable network-wide coordination of these grid components in order to improve system efficiency and reliability and to limit greenhouse gas emissions. In this context, the energy flows will be bidirectional from large power plants to end users and vice versa; producers and consumers will continuously interact at different voltage levels to determine in advance the requests of loads and to adapt the production and demand for electricity flexibly and efficiently also taking into account the presence of storage systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Identification of pressure points in modern power systems using transfer entropy

Power shortages disrupt daily life, economic activity, and essential services. In modern power systems, weather is an increasingly important driver of reliability: high temperatures raise demand and limit transmission capacity, and calm or cloudy periods reduce wind and solar supply. Using a data-driven analysis, this study identifies grid infrastructure whose operating patterns help predict power shortages. The results show that reliability risks often emerge from interacting stresses across generation, transmission, and demand, rather than from single bottlenecks. By clarifying how system stress propagates through the grid, this diagnostic perspective helps explain why shortages occur under specific conditions and can complement traditional planning and operational tools to support adaptive reliability strategies, targeted monitoring, and coordinated infrastructure investments.

power systems↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. I. National Study. Executive Summary

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established an installed capacity target of 175 gigawatts (GW) RE by 2022 that includes 60 GW of wind and 100 GW of solar, up from current capacities of 29 GW wind and 9 GW solar. India’s contribution to global efforts on climate mitigation extends this ambition to 40% non-fossil-based generation capacity by 2030. Global experience demonstrates that power systems can integrate wind and solar at this scale; however, evidence-based planning is important to achieve wind and solar integration at least cost. The purpose of this analysis is to evaluate the operation of India’s power grid with 175 GW of RE in order to identify potential cost and operational concerns and actions needed to efficiently integrate this level of wind and solar generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MindSynchro

This report presents the developments and results of MindSynchro project as part of DOE OE FOA 1861. DOE and Pacific Northwest National Laboratory (PNNL) have made available to FOA awardees datasets containing years of real historical data recorded from various phasor measurement units (PMUs) which are installed in three large US interconnections: Texas (IC A), Western (IC B), and Eastern (IC C). The main goal of the project, which was successfully achieved, was to develop methods for detection and identification of events which are relevant for power grid operation. Tasks performed for achieving the project goals included data exploration and pre-processing, the development and application of physics-based features, data analysis and labeling based on unsupervised learning approaches, training and testing of DSSL models for classification of events which are relevant for power grid operation, and deployment of solutions to cloud environments. The methods developed in the project can potentially provide relevant benefits to power grid asset owners/operators in general in terms of situational awareness. Two main types of outcomes can be provided by these tools: Identification of specific relevant power grid event types: Semi-supervised ML methods developed in the project can adequately employ not only the relatively scarce labeled data but also the large amount of available unlabeled data to train models for detection of specific event types. Such methods enable the application of trained models for the detection of events in a population of PMUs much larger than that associated to the labeled events. Support in data labeling / label validation: Labels are critical for training of models for identification of specific types of events. However, labeling large amounts of data is a manual and tedious process. This means that such process is error prone and is not scalable. Methods developed in the project, based on ensembles of clustering models, have been successfully employed for turning manual labeling into a scalable process. Accurate identification of specific relevant events can provide the operators with immediate situational awareness that could otherwise require hours or days of analysis from domain experts. We envision that such methods could be initially employed in support of post-mortem analysis of events and, as confidence is gained, they could be employed for online/real-time support, providing, among other benefits, insights for avoiding major events which could happen due to a combination of smaller ones. On the longer term, related methods could potentially be employed to improve protection and control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Overview of the physics basis for the ARC fusion power plant

Commonwealth Fusion Systems plans to build ARC as the first fusion power plant at a site in Chesterfield County, Virginia, USA by the early 2030s. We present an overview of analysis comprising the physics basis of the ARC V3A design, a high-magnetic-field tokamak with 𝐵 0 =11.4 T, 𝐼 𝑝 =12.0 MA, 𝑅 0 =4.62 m, 𝑎 =1.18 m. ARC V3A is designed to produce 𝑃 𝑓⁡𝑢⁢𝑠 ≈1.13 GW DT fusion power and deliver ⩾400 MW net electric power to the grid. This overview includes quantitative analysis of fundamental issues for design of and operational plasma scenarios for a tokamak power plant, and lays out the design targets and strategic choices for ARC, including empirical fusion performance projections, assessment of H-mode access, ion cyclotron resonance heating simulations, alpha particle physics and time-dependent full-pulse simulations. This is complemented by topical papers on fusion performance and transport, disruption physics, boundary physics and magnetohydrodynamic stability. Critically, these studies identify key model uncertainties and physics risks to be retired through SPARC operation. Due to the modular nature of ARC, early results from SPARC can be incorporated into the design of the first ARC as well as subsequent replacements of the ARC vacuum vessel.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection: Preprint

Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Grid Strength Analysis Tool (GSAT) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the GSAT software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.

Automated System-wide Strength Evaluation Tool (AS↗

Backup Power Performance of Solar-plus-Storage Systems during Routine Power Interruptions: A Case Study Application of Berkeley Lab’s PRESTO Model

This technical brief estimates the expected performance of a solar photovoltaic and energy storage system (PVESS) for providing backup power during short-duration power interruption events, accounting for the unpredictable nature of those events. The analysis relies on the Power Reliability Event Simulation TOol (PRESTO), a publicly available model developed by Berkeley Lab to simulate the occurrence of short-duration power interruption events at the county-level. A separate storage dispatch model is then used to simulate PVESS operation and backup performance for each of the large number of interruption events produced by PRESTO. In performing this simulation, the analysis accounts for how the customer operates its battery on a day-to-day basis—in this case, we assume the battery is cycled each day in response to time-of-use rates—and how that, in turn, impacts the battery’s state of charge at the beginning of each interruption event. The analysis presented here is intended to demonstrate an application of the PRESTO model as well as to illustrate some of the key determinants of PVESS backup power performance during short-duration power interruption events. The analysis focuses initially on a typical single-family home in Maricopa County, Arizona, and includes a limited set of scenarios related to system sizing, backup power configuration, and whether the customer charges its battery storage system from the grid during normal operating conditions. The analysis also presents comparative results for two other counties, in Massachusetts (Middlesex) and California (Los Angeles), illustrating how regional differences in climate, interruption patterns, and retail rate structures can affect PVESS performance as a backup power source. In the conclusions, we highlight a number of other important considerations for evaluating PVESS backup power capabilities.

14 SOLAR ENERGY↗

Comprehensive Solutions for Integration of Solar Resources into Grid Operations

The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of such a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.

14 SOLAR ENERGY↗

More land is needed for solar and wind infrastructure under a high renewables scenario in the Western US by 2050

Expanding United States electricity infrastructure to meet growing demand could require extensive power plant development footprints and land use conversion, depending on the mix of generation types chosen. Understanding where future power plant sitings are likely to take place and identifying potential conflicts and land-use tradeoffs will be key to identifying feasible and affordable investments and evaluating regional planning coordination needs. Here we use an integrated modeling framework that combines capacity expansion planning, hourly grid operations, and geospatial techno-economic analysis to develop projections (2025-2050) of power plant sitings in the Western United States (US) at a 1 km 2 resolution for a business-as-usual scenario and a high renewables penetration scenario. We find that 30% more land will be needed in the high renewables scenario as compared to business-as-usual, and that 75% of that development is projected to be located within 10 km of natural areas.

Mongird, Kendall [Pacific Northwest National Labor↗