CITRC Cable Info

Working on a DOE project with university sub-contractors to build power grid simulations. We need the cable size and spacing to build accurate models. Other related documents on the physical set up and electrical components have been released, INL/MIS-20-59900 and INL/MIS-20-60003.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SULI End of Summer Presentation

This presentation made on Power Point is a brief summary of my work enhancing the Supervisory Control and Data Acquisition (SCADA) architecture for Idaho National Lab’s Critical Infrastructure Test Range Complex (CITRC). This work was part of an on-going project to create a digital twin of CITRC that will be implemented for resiliency research. Resiliency is growing more important as extreme weather, aging infrastructure, and increasing load all exert stress on the United States power grid. This presentation highlights how I documented the existing devices and data flow on site and then updated specific device settings to better support the needs of the project. It also examines future use of this data in the digital twin data warehouse (DeepLynx), and future Artificial Intelligence and Advanced Distribution Management System applications. It will be presented to the B751 Water and Energy Systems Analysis group at INL during my last week.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Data Management for Digital Twin Implementation: Enhancing Existing SCADA Architecture for INL's CITRC Test Distribution System

The United States power grid will continue to experience stress from aging infrastructure, extreme weather, and increasing loads. In order to strengthen resiliency, researchers need to run tests and simulations that model real-life infrastructure. Idaho National Laboratory (INL) is creating a digital twin of its Critical Infrastructure Test Range Complex (CITRC). CITRC is an at-scale grid testbed which can be configured in utility-realistic distribution scenarios for a variety of tests, such as advanced grid protection and control. A digital twin of this infrastructure would support in-depth tests/simulations without risking physical consequences, before trialing devices under test at-scale. This project focuses on the data acquisition part of constructing a digital twin. It investigates the Supervisory Data Acquisition and Control (SCADA) system of CITRC and explores ways to utilize this system for the twin. Future “ideal” at-scale implementations such as upgraded equipment, modern communication protocols, and automation applications are also explored.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Enhanced INL Power Grid Test Bed Infrastructure – Phase I

Idaho National Laboratory (INL), a Department of Energy (DOE) laboratory, owns, operates, and maintains transmission and distribution power grid infrastructure to support the INL multi program mission. Sections of this power infrastructure, known as the INL Power Grid Test Bed, have been and are being used by government and industry to develop, demonstrate, and validate technologies for the modern grid, including smart grid, on a full scale utility test bed. INL’s power grid includes 61 miles of 140 MW, 138 kV rated electrical power transmission supplying seven main substations, each feeding a separate facility complex (or ‘city’) within the INL’s 890 square mile Site. This power grid is fed by three commercial utilities into the INL’s main control substation, but is operated independently from the commercial utility through its primary substation and command and control center. Within the INL complex, one of the seven complexes, the Critical Infrastructure Test Range Complex (CITRC), has been designated as the INL complex for supporting critical infrastructure research and testing. This complex includes its own substation and 13.8kV distribution network, all configurable and controlled by the INL research and development programs. Through investment partnership with the DOE Office of Electricity Delivery and Energy Reliability (DOE OE), INL is enhancing its existing distribution infrastructure to expand the types of testing that can be conducted and increase flexibility for testing configurations. The enhancement of the INL Power Grid Test Bed will enable development and full scale testing of smart-grid-related technologies and smart devices including testing interoperability, operational performance, reliability, and resiliency contribution at multiple distribution voltage classes, specifically 15kV, 25kV, and 35kV. The expected time frame for completion of the Phase I portion of the enhancement would be 4th quarter fiscal year (FY) 2015.