Search NASASearch

SEARCH · Search NASA

Results for “Power offset”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Airports as Energy Nodes Activity Summary

Advanced aircraft concepts that use non-traditional aviation energy storage methods such as batteries or cryogenic hydrogen are in development and expected to enter regular service at airports worldwide within the next decade. The energy needs for these aircraft may quickly overwhelm the existing energy infrastructure at airports, particularly at smaller and more remote facilities. Without energy upgrades, these airports will not be able to host these advanced vehicles, but without the advanced vehicle traffic, these airports will not have the rationale or funding to build up their energy infrastructure. The Airports as Energy Nodes (ÆNodes) activity, a collaboration between the National Aeronautics and Space Administration (NASA) and the National Renewable Energy Laboratory (NREL), was executed to understand and model the energy needs that advanced aircraft concepts may levy on these smaller airports, determine cost-effective approaches to enhance the airport energy infrastructure, and demonstrate the enhanced resilience of these energy infrastructure upgrades to the airport and surrounding community via “digital twin” simulation at relevant energy and dynamic time scales. The ÆNodes team also investigated future reference aircraft designs and materials to enable cryogenic hydrogen storage for aircraft. The ÆNodes team conducted analysis at two U.S. airport partner sites — Winchester Regional Airport in Winchester, Virginia, and Tweed/New Haven Airport in New Haven, Connecticut. The goal of this partnership was to develop data and reference infrastructure designs that could accommodate advanced aircraft in the future at these airports while also enhancing the resiliency of the energy supply to the surrounding airport community, which could be used to capture funding to enable the infrastructure upgrades. Over the course of the study, a method was developed to estimate air traffic requiring advanced energy services over the course of a year using a mix of historical data and companion studies on advanced aircraft transportation networks. The study has concluded at NASA but continues at NREL, who will develop a final report discussing the energy infrastructure upgrades and digital twin results. Preliminary results indicate that unrestricted adoption of advanced battery-electric aircraft may double traffic at these airports and increase peak daily power usage by an order of magnitude, while increase electricity energy needs by a factor of two to four. The infrastructure upgrades necessary to accommodate these increased energy needs could be used to provide enhanced energy services to the airport community to offset the cost and increase the utility of the upgrades, which will be described in the NREL final report.

Airports

Radio Metric Errors Due to Mismatch and Offset Between a DSN Antenna Beam and the Beam of a Troposphere Calibration Instrument

Two components of the error of a troposphere calibration measurement were quantified by theoretical calculations. The first component is a beam mismatch error, which occurs when the calibration instrument senses a conical volume different from the cylindrical volume sampled by a Deep Space Network (DSN) antenna. The second component is a beam offset error, which occurs if the calibration instrument is not mounted on the axis of the DSN antenna. These two error sources were calculated for both delay (e.g., VLBI) and delay rate (e.g., Doppler) measurements. The beam mismatch error for both delay and delay rate drops rapidly as the beamwidth of the troposphere calibration instrument (e.g., a water vapor radiometer or an infrared Fourier transform spectrometer) is reduced. At a 10-deg elevation angle, the instantaneous beam mismatch error is 1.0 mm for a 6-deg beamwidth and 0.09 mm for a 0.5-deg beam (these are the full angular widths of a circular beam with uniform gain out to a sharp cutoff). Time averaging for 60-100 sec will reduce these errors by factors of 1.2-2.2. At a 20-deg elevation angle, the lower limit for current Doppler observations, the beam-mismatch delay rate error is an Allan standard deviation over 100 sec of 1.1 x 10 -14 with a 4-deg beam and 1.3 x 10 -15 for a 0.5-deg beam. A 50-m beam offset would result in a fairly modest (compared to other expected error sources) delay error (less than or equal to 0.3 mm for 60-sec integrations at any elevation angle is greater than or equal to 6 deg). However, the same offset would cause a large error in delay rate measurements (e.g., an Allan standard deviation of 1.2 x 10 -14 over 100 sec at a 20-deg elevation angle), which would dominate over other known error sources if the beamwidth is 2 deg or smaller. An on-axis location is essential for accurate troposphere calibration of delay rate measurements. A half-power beamwidth (for a beam with a tapered gain profile) of 1.2 deg or smaller is desired for calibration of all types of radio metrics. A water-vapor radiometer calibration beam of this size with very low sidelobes would require a clear aperture antenna with a diameter of at least 1.5 m if the primary water vapor sensing channel were in the 20-22 GHz range.

R P Linfield