Search NASA⌕ Search

SEARCH · Search NASA

Results for “Prefabrication”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Optimization of prefabricated component installation using a real-time evaluator (RTE) connection locating system

Prefabrication promises to industrialize the construction industry. By constructing elements within a manufacturing environment, producers can better control quality and maximize production efficiency. Since the major adoption of prefabrication, a wide variety of prefabricated components have been produced for varying applications such as new construction and exterior wall retrofits. While the production processes of these prefabricated components have seen much innovation, the installation process has remained relatively unchanged for decades. To innovate the installation process with modern technologies, a real-time evaluator (RTE) has been developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses developed software solutions with off-the-shelf hardware to assist erectors in completing an installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and proposed workflow is presented. A connection locating system that guides users in expediting the installation of connections is introduced. Laboratory experiments were conducted to determine the accuracy improvement and time savings of the RTE in installing connections for prefabricated components. RTE enabled a time saving of up to 37% compared to traditional connection installation methods using handheld measurement tools.

Hayes, Nolan↗

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve the airtightness and waterproofness of prefabricated components, we developed a sealant that can be installed at the plant and have its curing reaction triggered at the jobsite. Additionally, we used this opportunity to explore the use of bio-based feedstocks that are abundant and not used for food. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of bio-based components, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one-part sealant allowing a fast-curing system to remain unreacted until the right trigger is applied. When the microcapsules are activated and broken by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The open-air shelf stability of the sealant complexes was demonstrated by peel strength values of ~16 ppi when triggering the curing reaction even after being exposed for 8 months to open air and humidity. The successful on-demand triggering of curing reactions and the shelf stability provide efficacy of these force-triggered sealants for installation on prefabricated components, storage for months prior to delivery, and assembly at the jobsite. These force-triggered bio-based sealants for prefabricated buildings could result in lower installation time and cost as well as better performance than tapes and caulks at the jobsite.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468↗

A review of prefabricated overclad panels for building energy retrofits

Over 50% of existing buildings in the US were constructed before 1980 and lack modern, energy-efficient technologies. Despite the large number of old buildings, less than 2% of buildings are retrofitted each year with many of those retrofits consisting of small incremental improvements that often ignore the building envelope. The opaque building envelope affects 25% of building energy use equating to 10% of total US primary energy use. To meet decarbonization goals by 2035, the US must increase the rate of retrofit of existing building envelopes. The process of prefabrication is one potential opportunity to increase the rate of envelope retrofits and reduce costs. Prefabrication is the process of manufacturing construction components in a controlled environment before shipping them on-site to perform assembly of the construction. The process of prefabrication has been demonstrated to increase production efficiency, quality control, and rate of production. Prefabricated overclad panels, consisting of a cladding material and insulation designed to be installed over the existing envelope, have been successfully used to retrofit existing buildings in countries other than the US; however, the technology still has some barriers to major market adoption within the US. This paper will present a review of current implementations and demonstrations of prefabricated overclad panels. The review will include identification of panel types, materials, and applications and aims to identify barriers to retrofit market entry and widespread adoption.

Hayes, Nolan [ORNL] (ORCID:0000000332245718)↗

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve assembly quality of prefabricated components, we developed a sealant that can be installed at the plant and triggered at the jobsite. Additionally, we used this opportunity to lower the use of fossil fuel derived feedstocks and introduced bio-based alternatives to decrease the embodied carbon of the new sealant. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of biogenic carbon, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one part sealant allowing shelf stability to an otherwise fast curing system. When the microcapsules are broken and activated by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The shelf stability of these sealants and the on-demand triggering of the curing reactions enable installation on prefabricated components and storage prior to delivery and assembly at a jobsite, which could result in consistent sealant application with lower installation time than tapes and caulks at the construction site.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468↗

Force-Triggered, Biobased Sealants for Prefabricated Building Components: Toward Improved Efficiency and Performance

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at off-site plants. However, the sealing of joints between these components, which is crucial to ensuring the weatherproofing of the assembly, still represents a labor-intensive, on-site effort that relies on the manual installation of tapes and caulks. Here, to reduce work at the jobsite and improve the airtightness and waterproofness of building envelopes, we developed a sealant that can be installed at the plant on prefab components and have the curing reaction triggered at the jobsite by using microencapsulation technology to separate the reactive agents. A series of force-triggered, high-strength, and fast-curing sealants derived from biobased feedstocks were developed, which consist of a biobased epoxy agent encapsulated in a polymer shell, embedded in a biobased amine curing agent. The shell of the microcapsules allows an effective separation of the reactive species in the one-part sealant, allowing shelf stability to an otherwise fast-curing system as well as improving the hydrophobicity of the whole system. When force activates and breaks the microcapsules, the highly reactive epoxy and amine mix and cure, exhibiting peel strength values of up to 143 ppi (pounds per inch). The hydrophobicity of the sealants allows them to retain up to 94% of the original peel strength after complete submersion in water for 24 h, showcasing the water resistivity of the sealant system. The open-air shelf stability of the sealant complex is demonstrated by the obtention of peel strength values of ∼16 ppi when triggering the curing reaction even after being exposed 8 months to open air and humidity. The successful on-demand triggering of curing reactions and the shelf stability provide efficacy of these force-triggered sealants for installation on prefabricated components, storage for months prior to delivery, and assembly at a jobsite. These force-triggered biobased sealants for prefabricated buildings can result in lower installation time and cost and better performance than tapes and caulks at the jobsite.

biobased↗

Automated tracking of prefabricated components for areal-time evaluator to optimize and automateinstallation

Trade associations for prefabricated construction estimate that about 50% of prefabricated wall projects have alignment problems that lead to defects and rework. Additionally, component installation times average between 30 and 60 minutes per component. To address these issues, a real-time evaluator (RTE) system was introduced to decrease cost and automate prefabricated component installation by reducing the installation time, decreasing rework, and enhancing energy performance through higher installation quality. The RTE uses commonly available hardware and software to perform autonomous tracking to measure the real-time location and orientation of components as they are crane-lifted and installed. The hardware, software, and algorithms that allow the autonomous tracking of components are detailed. An algorithm to automate the initial search for a component with three attached retroreflectors is proposed. Algorithms to automate the measurement of component position and orientation are also proposed. Simple lab-scale proof-of-concept experiments were conducted to assess the algorithms for automation of component searching, measurement of real-time movement, and measurement of component orientation. With additional development, the system can be used as a tool to generate the commands for autonomous crane operation or single-task construction robots.

Hayes, Nolan↗

Lab-Scale Cable-Driven Parallel Robot Prototype for Automated Prefabricated Component Manipulation

This paper presents the design and evaluation of a lab-scale cable-driven parallel robot (CDPR) developed as a flexible platform for automated installation of prefabricated components onto exterior building envelopes. Traditional manual installation methods for prefabricated components, which depend on scaffolding, cranes, cherry pickers, and verbal coordination, are not only labor-intensive and error-prone but also face significant limitations in dense urban environments due to site access constraints. To address these challenges, we developed a lab-scale CDPR platform capable of autonomously transporting building envelope components from a designated pickup zone to their target installation location, minimizing the need for human intervention. This study describes the system’s mechanical design, actuation architecture, real-time feedback system, and control strategy of the CDPR, and evaluates its performance in a laboratory environment. The robot’s actuation system uses torque control for end-effector manipulation. The robot’s real-time pose feedback comes from a construction-grade total station and a wireless inertial measurement unit (IMU), which together support precise end-effector control. Experimental results demonstrate the successful integration of the hardware, sensing, state estimation, and control subsystems. Preliminary tests showed that our lab-scale prototype can position the end effector with an error of less than 3 mm, which is a level of precision not previously achieved by existing CDPRs in construction applications. The key findings are twofold: (1) torque-only control is necessary but not sufficient for minimizing final pose error, and (2) incorporating real-time pose feedback can achieve the desired placement accuracy.

Liu, Yifang [Oak Ridge National Laboratory (ORNL),↗

Prefabricated Zero Ascend Omnispecies (ZAO) Modular Fish Passage Modules Using Advanced Manufacturing Techniques

The Zero Ascend Omnispecies (ZAO) fish passage attraction module “ZAO Attractor” is a novel system designed to facilitate upstream passage for a broad spectrum of fish species, with a particular focus on American shad and river herring (alewife and/or blueback herring). Combining the use of prefabricated, modular components with advanced manufacturing, the ZAO aims to provide a cost-effective and scalable solution for fish passage attractions across various hydropower sites. The system features a surface level entry, so fish do not need to climb. In addition, it is designed to be adjusted and repositioned to create the most effective attraction flows by managing the outflows from hydropower turbines. Budget Period 1 (BP1) focused on the design and modeling of the ZAO Attractor and demonstrated the engineering feasibility of a modular, prefabricated, hydrodynamically efficient structure with surface level entry and passage. It was discovered that there were limited published studies on the direct correlation between quantified flow patterns and fish attraction, emphasizing the need for controlled studies to observe and measure these effects. In Budget Period 2 (BP2), controlled studies with live fish were prioritized to address these complexities. In conclusion, the ZAO fish passage attraction module presents a promising approach to fish passage at hydropower stations, with the potential to balance environmental concerns with renewable energy development. However, further field validation and optimization are necessary to ensure its effectiveness and practicality in real-world applications.

13 HYDRO ENERGY↗

Heat transfer unit for prefabricated vessel

Vessel assemblies, heat transfer units for prefabricated vessels, and methods for heat transfer prefabricated vessel are provided. A heat transfer unit includes a central rod, and a plurality of peripheral rods surrounding the central rod and connected to the central rod. The plurality of peripheral rods are movable between a first collapsed position and a second bowed position, wherein in the second bowed position a midpoint of each of the plurality of peripheral rods is spaced from the central rod relative to in the first position. The heat transfer unit further includes a heat transfer element connected to one of the plurality of peripheral rods.

Tamburello, David A.↗

Vision-based inspection of prefabricated components using camera poses: Addressing inherent limitations of image-based 3D reconstruction

Modular construction can lead to additional cost overruns and delays when a defect is found on the construction site and is not easily repairable. Researchers have developed various methods that use image-based 3D reconstruction for quality assessment, but they have inherent limitations, such as inconsistency and dealing with surfaces with reflectivity and limited visual features. Therefore, this paper presents a vision-based quality assessment method using cameras for prefabricated components by addressing these limitations. Specifically, this paper proposes a novel quality inspection method with sub-millimeter accuracy using cameras focused on leveraging camera poses (as opposed to 3D point clouds that are often not consistent in quality) from the image-based 3D reconstruction. The 3D point estimation by computing triangulation was used for achieving accurate measurement. The proposed method is validated using six different variances and two case studies – an aluminum pipe with a reflective surface and a fabricated concrete column. Furthermore, the results demonstrate the accuracy and effectiveness of the proposed method.

42 ENGINEERING↗

Modular Multi-family Construction: A Field Study of Energy Code Compliance and Performance through Offsite Prefabrication

Prefabrication in a controlled, factory setting may improve the energy code compliance and energy performance of modular buildings compared to traditional site-built buildings. To test this premise, the work detailed in this DOE-funded commercial field study (EE0009082) compares the energy code compliance of 25 modular and 30 site-built multifamily buildings under construction in Los Angeles, San Francisco, Philadelphia and Seattle representing climate zones 3B, 3C, 4A and 4C respectively. This dataset includes full data on 20 modular and site-built buildings and partial data on 35 modular and site-built buildings that had started prior to or were completed after the 18-month data collection period. This study also compares the post-occupancy energy performance or energy use intensity (EUI) of an additional 23 modular multifamily buildings and 128 site-built multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Technical Report (FTR) - DE-EE0009084: Prefabricated Construction: Guidance, Technical Assistance, and Virtual Inspections

This final technical report summarizes research, case studies, and resources developed from 2020–2025 on prefabricated construction and remote virtual inspections. It documents key findings on benefits, challenges, and best practices, highlights examples from multiple states, and provides guidance to support wider adoption of these innovations in the construction sector.

99 GENERAL AND MISCELLANEOUS↗

Dynamic analysis of fully constrained Cable-Driven Parallel Robots for automated prefabricated component installation

This paper presents a dynamic analysis and validation framework to assess a fully constrained six-anchor Cable-Driven Parallel Robot (CDPR) for automated installation of prefabricated facade components. Compared with conventional eight-anchor systems, the six-anchor configuration simplifies setup and reduces cost, but it also reduces control authority, shrinks the wrench-feasible workspace, and tightens orientation limits. Consequently, it is unclear a priori whether dynamically feasible trajectories exist to move the end effector from pickup to the facade. A constrained trajectory optimization is formulated to enforce the system dynamics, cable-tension bounds, and pose/velocity limits, and the framework is evaluated in simulation at three levels: (i) an idealized reference model, (ii) a lab-scale prototype model incorporating measured anchor misalignments and identified damping, and (iii) a full-scale three-story building model with load decomposition for structural feasibility checks. Across these scenarios, the analysis shows that optimal, constraint-satisfying trajectories exist that move the end effector from pickup to installation while maintaining a near-plumb, level orientation at the final pose. Collectively, this multi-scale dynamic analysis and validation framework supports the deployment readiness of the six-anchor CDPR and provides a prototype-based sensitivity case study of how measured anchor placement deviations affect feasibility.

CDPR↗

Prefabricated Zero Energy Retrofit Technologies: A Market Assessment

Part of the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy’s (EERE’s) strategic goals is to stimulate the growth of a thriving domestic clean energy manufacturing industry. This report seeks to identify products in the European and U.S. markets that can enable a more integrated and standardized approach to conducting zero energy retrofits, leveraging off-site construction and manufacturing. Greater integration of energy conservation measures into prefabricated building components will further enable efficiency adoption, while reducing project complexity, risks, and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Prefabricated Zero Energy Retrofit Technologies: A Market Assessment

The U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy’s (EERE’s) mission is to “create and sustain American leadership in the transition to a global clean energy economy.” EERE’s vision is a strong and prosperous America powered by clean, affordable, and secure energy. In support of this vision, one of EERE’s strategic pillars is to stimulate the growth of a thriving domestic clean energy manufacturing industry. This report seeks to identify products in the European and U.S. markets that can enable a more integrated and standardized approach to conducting zero energy retrofits, leveraging off-site construction and manufacturing. Greater integration of energy conservation measures into prefabricated building components will further enable efficiency adoption, while reducing project complexity, risks, and costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗