Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pressurized Mating Adapter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

International Space Station Environmental Control and Life Support System Acceptance Testing for the Pressurized Mating Adapters

The International Space Station (ISS) Pressurized Mating Adapters (PMAs) Environmental Control and Life Support (ECLS) System is comprised of three subsystems: Atmosphere Control and Supply (ACS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). PMAs 1 and 2 flew to ISS on Flight 2A and Pressurized Mating Adapter (PMA) 3 flew to ISS on Flight 3A. This paper provides a summary of the PMAs ECLS design and a detailed discussion of the ISS ECLS Acceptance Testing methodologies utilized for the PMAs.

Williams, David E.↗

International Space Station Environmental Control and Life Support System: Verification for the Pressurized Mating Adapters

The International Space Station (ISS) Pressurized Mating Adapters (PMAs) Environmental Control and Life Support (ECLS) System is comprised of three subsystems: Atmosphere Control and Supply (ACS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). PMA 1 and PMA 2 flew to ISS on Flight 2A and PMA 3 flew to ISS on Flight 3A. This paper provides a summary of the PMAs ECLS design and the detailed Element Verification methodologies utilized during the Qualification phase for the PMAs.

Williams, David E.↗

STS-88 Day 10 Highlights

On this tenth day of the STS-88 mission, the flight crew, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, James H. Newman, Jerry L. Ross, and Sergei Krikalev are awakened by the sounds of Elvis Presley's "Hound Dog". Today's activities are devoted mostly to tasks that ready the station for future assembly work. The crew's first job is to release some cable ties on four cables connected on an earlier space walk, three located on Unity's upper mating adapter and one on its lower adapter, to relieve tension on the lines. The space walkers also will check an insulation cover on one cable connection on the lower Pressurized Mating Adapter (PMA 2) to make sure it is fully installed. Near the end of the space walk, the astronauts conduct a detailed photographic survey of the space station from top to bottom. Finally, each astronaut test fires the Simplified Aid for Extravehicular Activity Rescue (SAFER) jet backpacks they are wearing, a type of space "lifejacket," that would allow an astronaut to fly back to the station if they should ever become untethered.

Source record↗

International Space Station General Resource Reel

The construction and evolution of the International Space Station (ISS) is seen through various clips. Live footage shows the following: (1) the Zarya Module under construction and during launch preparations; (2) the Unity Module under construction, during launch preparations, and being lowered into the payload canister; (3) STS-88 Mission Specialists Jerry Ross and Jim Newman during training for their spacewalks, including activities in the Neutral Buoyancy Laboratory (NBL); (4) Zarya and Unity docking to the Service Module; (5) the Expedition 1 crew (William Shepherd, Yuri Gidzenko, and Sergei Krikalev) during emergency escape training in the Black Sea and during water survival training at Johnson Space Center; (6) the X-38 Crew Return Vehicle Drop Test; and (7) the US Destiny Laboratory Module, Pressurized Mating Adapter (PMA), Service Module, Italian Multi-Purpose Logistics Module, US Airlock, and US Habitation Module under construction. Computerized animations show the following: (1) an ISS fly-around; (2) the STS-88 Space Shuttle as it docks with Zarya and attaches Zarya to the Unity Module; (3) the Space Shuttle as it docks with ISS and installs the Z1 truss segment and PMA; (4) the Soyuz spacecraft as it docks with ISS; (5) interior and exterior views of the Columbus Attached Pressurized Module; and (6) a Transhab animation showing the interior and exterior and marking the components.

Source record↗

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

STS-88 Day 03 Highlights

On this third day of the STS-88 mission, the flight crew, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, James H. Newman, Jerry L. Ross, and Sergei Krikalev check out the various tools they will use during the three scheduled spacewalks to be conducted later in the flight. They then begin an early set-up of the Shuttle's airlock in preparation for that first spacewalk. Newman and Russian cosmonaut Sergei Krikalev take part in an on-line interview by the New York Times. Currie is seen placing Unity just inches above the extended outer ring on Endeavour's docking mechanism, enabling Commander Bob Cabana to fire downward maneuvering jets to lock the shuttle's docking system to one of two Pressurized Mating Adapters (PMA's) attached to Unity.

Source record↗

International Space Station ECLSS Operations Status - Increment OA

This paper describes Environmental Control and Life Support Systems (ECLSS) operations to date for preflight planning, international partner coordination and mission plan execution of the International Space Station (ISS). The focus is on the activities involved with the STS-88(2A) Space Shuttle Endeavor flight, the first delivery of the US segment of the ISS, which consists of the Pressurized Mating Adapter (PMA)/and Node 1 elements, and the delivery of the first Russian segment of the ISS, the FGB, a US-financed and Russian- built module.

Lamczyk, Philip C.↗

Crew Activity Report/Flight Day 6 Highlights

On this sixth day of the STS-92 mission, the flight crew, Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur continue working on the exterior of the International Space Station (ISS) to prepare the station for its first resident crew. Lopez-Alegria and Wisoff perform the second of four spacewalks to maneuver the third pressurized mating adapter (PMA-3) into its new location on the Unity module.

Source record↗

STS-92 Crew Activity Report/Flight Day 4 Highlights

On this fourth day of the STS-92 mission, the flight crew, Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur give an overview of the day's accomplishments. Footage of the third pressurized mating adapter (PMA-3), the common berthing mechanism (CBM), and the installed Z1 truss are shown.

Source record↗

STS-92 Crew Interview/L. Chiao

The STS-92 Mission Specialist Leroy Chiao is seen being interviewed. He answers questions about his inspiration to become an astronaut, his training, and gives details of the mission, including overviews of the Z1 truss, the third pressurized mating adapter (PMA-3), the common berthing mechanism (CBM), and the spacewalks. He shares his thoughts on the role of STS-92 in preparing the International Space Station (ISS) for the first resident crew, Russia's contribution to the ISS, and the importance of the ISS and Space Shuttle in the future.

Source record↗

STS-92 Crew Activity Report/Flight Day 7 Highlights

On this seventh day of the STS-92 mission, the flight crew, Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur continue work on the Z1 truss and the third pressurized mating adapter (PMA-3) on the International Space Station (ISS). Footage is seen of Chiao's and McArthur's spacewalk while they install two DC-to-DC converter units and attach a second tool storage box on the Z1 truss.

Source record↗

STS-92 Crew Interview - Wakata

STS-92 Mission Specialist Koichi Wakata is interviewed. He answers questions about his inspiration to become an astronaut, his training, and gives details on the mission, including overviews of the ZI truss, the S-band antenna, the third pressurized mating adapter (PMA-3), the common berthing mechanism, and his part in controlling the robotic arm during the spacewalks. He shares his thoughts on Russia's contribution to the International Space Station (ISS), the role of STS-92 in preparing the ISS for its first resident crew, and the importance of ISS in the future.

Source record↗

STS-92 Extravehicular Activity Overview

Daryl Schuck, STS-92 Lead Extravehicular Activity (EVA) Officer, gives an overview of the four EVAs scheduled for the STS-92 mission. He discusses the construction phase of the International Space Station (ISS) and the equipment to be installed onto the ISS, such as the Z-1 Truss, PMA-3 (Third Pressurized Mating Adapter), S-Band Antenna, and the DC to DC Power Converter. Mr. Schuck describes the challenges of the mission, and the activities and objectives of the spacewalks. He then answers questions from the press.

Source record↗

STS-102 Crew Activity Report/Flight Day 4 Highlights

On this fourth day of the STS-102 mission, Expedition 2 crewmembers Jim Voss and Susan Helms are seen preparing for and performing their spacewalks. Discovery Pilot Jim Kelly is shown maneuvering the robotic arm as he helps Helms and Voss to install the Third Pressurized Mating Adapter (PMA-3) to the Unity Module on the International Space Station (ISS).

Source record↗

STS-102/Expedition 2 Mission Overview

John Shannon, STS-102 Lead Flight Director, Bernestine Dickey, STS-102 Launch Package Manager, and Rick La Brode, International Space Station (ISS) Lead Flight Director, give an overview of the STS-102 mission during a prelaunch press conference. Mr. Shannon discusses how the mission came into being and its objectives, including information on the launch and a day-by-day account of mission activities. Ms. Dickey gives details on the payload of STS-102, describing the system racks, cargo elements, and crew supplies delivered via the Leonardo Multi-Purpose Logistics Module. Mr. La Brode describes the current configuration of the ISS and upcoming changes. He also discusses the activities of the Expedition 2 crew during the next four months. Computer simulations show the ISS' current and future (after the STS-102 mission) configurations, the installations of Leonardo, and the move of the Pressurized Mating Adapter from one port to another on the Destiny Laboratory. The panel then answers questions from the press.

Source record↗

STS-102 Extravehicular Activities Briefing

Keith Johnson, STS-102 Lead Extravehicular Activities Officer, gives an overview of the mission's spacewalks in this prelaunch press conference. He describes the activities, objectives, and timeline of the spacewalks during the STS-102 mission. Computerized simulations show the move of the Third Pressurized Mating Adapter (PMA3) and the retrieval of the rigid umbilicals from the payload bay of Discovery. Mr. Johnson then answers questions from the press.

Source record↗

STS-92 Mission Highlights Resource Tape

A continuation of 'STS-92 Mission Highlights Resource Tape, Part 1 of 2' (internal ID 2001120375), this video shows footage from flight day six of the STS-92 mission. Mission Specialists Jeff Wisoff and Mike Lopez-Alegria are seen as they perform their spacewalks to work on the Third Pressurized Mating Adapter and Z1 truss. Additional scenes show Mission Specialist Pam Melroy washing her hair and Commander Brian Duffy shaving. For footage from flight days 7-14, see 'STS-92 Mission Highlights Resource Tape, Part 3 of 4' (internal ID 2001120376) and 'STS-92 Mission Highlights Resource Tape, Part 4 of 4' (internal ID 2001120371).

Source record↗

ISS General Resource Reel

This video is a collection of computer animations and live footage showing the construction and assembly of the International Space Station (ISS). Computer animations show the following: (1) ISS fly around; (2) ISS over a sunrise seen from space; (3) the launch of the Zarya Control Module; (4) a Proton rocket launch; (5) the Space Shuttle docking with Zarya and attaching Zarya to the Unity Node; (6) the docking of the Service Module, Zarya, and Unity to Soyuz; (7) the Space Shuttle docking to ISS and installing the Z1 Truss segment and the Pressurized Mating Adapter (PMA); (8) Soyuz docking to the ISS; (9) the Transhab components; and (10) a complete ISS assembly. Live footage shows the construction of Zarya, the Proton rocket, Unity Node, PMA, Service Module, US Laboratory, Italian Multipurpose Logistics Module, US Airlock, and the US Habitation Module. STS-88 Mission Specialists Jerry Ross and James Newman are seen training in the Neutral Buoyancy Laboratory (NBL). The Expedition 1 crewmembers, William Shepherd, Yuri Gidzenko, and Sergei Krikalev, are shown training in the Black Sea and at Johnson Space Flight Center for water survival.

Source record↗