Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic projections”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Reduced Complexity Model Intercomparison Project Phase 2: Synthesizing Earth System Knowledge for Probabilistic Climate Projections

Over the last decades, climate science has evolved rapidly across multiple expert domains. Our best tools to capture state-of-the-art knowledge in an internally self-consistent modelling framework are the increasingly complex fully coupled Earth System Models (ESMs). However, computational limitations and the structural rigidity of ESMs mean that the full range of uncertainties across multiple domains are difficult to capture with ESMs alone. The tools of choice are instead more computationally efficient reduced complexity models (RCMs), which are structurally flexible and can span the response dynamics across a range of domain-specific models and ESM experiments. Here we present Phase 2 of the Reduced Complexity Model Intercomparison Project (RCMIP Phase 2), the first comprehensive intercomparison of RCMs that are probabilistically calibrated with key benchmark ranges from specialized research communities. Unsurprisingly, but crucially, we find that models which have been constrained to reflect the key benchmarks better reflect the key benchmarks. Under the low-emissions SSP1-1.9 scenario, across the RCMs, median peak warming projections range from 1.3 to 1.7°C (relative to 1850-1900, using an observationally-based historical warming estimate of 0.8°C between 1850-1900 and 1995-2014). Further developing methodologies to constrain these projection uncertainties seems paramount given the international community's goal to contain warming to below 1.5°C above pre-industrial in the long-term. Our findings suggest that users of RCMs should carefully evaluate their RCM, specifically its skill against key benchmarks and consider the need to include projections benchmarks either from ESM results or other assessments to reduce divergence in future projections.

Climate↗

The composite load spectra project

Probabilistic methods and generic load models capable of simulating the load spectra that are induced in space propulsion system components are being developed. Four engine component types (the transfer ducts, the turbine blades, the liquid oxygen posts and the turbopump oxidizer discharge duct) were selected as representative hardware examples. The composite load spectra that simulate the probabilistic loads for these components are typically used as the input loads for a probabilistic structural analysis. The knowledge-based system approach used for the composite load spectra project provides an ideal environment for incremental development. The intelligent database paradigm employed in developing the expert system provides a smooth coupling between the numerical processing and the symbolic (information) processing. Large volumes of engine load information and engineering data are stored in database format and managed by a database management system. Numerical procedures for probabilistic load simulation and database management functions are controlled by rule modules. Rules were hard-wired as decision trees into rule modules to perform process control tasks. There are modules to retrieve load information and models. There are modules to select loads and models to carry out quick load calculations or make an input file for full duty-cycle time dependent load simulation. The composite load spectra load expert system implemented today is capable of performing intelligent rocket engine load spectra simulation. Further development of the expert system will provide tutorial capability for users to learn from it.

Newell, J. F.↗

Investigation of air transportation technology at Massachusetts Institute of Technology, 1984

Three projects sponsored by the Joint University Program at MIT are summarized. Two projects were focussed on the potential application of Loran-C in flying nonprecision approaches to general aviation runways, and the third project involved research on aircraft icing. In one Loran-C project, Aircraft Approach Guidance Using Relative Loran-C Navigation, the concept was flight tested. It used the difference in TD's from those of the touchdown point to simplify and speed navigation computer processing and took advantage of the short term accuracy of less than 100 feet for Loran-C. The goal of the project, Probabilistic Modelling of Loran-C Error for Nonprecision Approaches, was to develop a mathematical model which would predict the probability that an approach flown to a runway with a particular Loran-C receiver would fall within a given standard. The Aircraft Icing project focussed on measurement of droplet trajectories and droplet impingement/runback characteristics and measurement of real time ice accretion using ultrasonic pulse echo techniques.

Simpson, Robert W.↗

Sea-Level Rise Projections for Maryland 2023

This report provides updated projections of sea-level rise in the State of Maryland, as required at least every five years by the Maryland Commission on Climate Change Act of 2015. The Sixth Assessment Report (AR6) for the Intergovernmental Panel on Climate Change (IPCC) produced a database of probabilistic projections of relative sea-level rise for tide-gauge locations around the world that reflect differences caused by thermal expansion, glacier and polar ice sheet melting, winds and currents, and vertical land motion. These are available online for seven locations in Maryland and the District of Columbia. Considered together with extrapolations of tide gauge and satellite observations, these projections indicate that sea level rise will likely be between 0.3 m (1 ft) and 0.5 m (1.6 ft) by 2050 (from a 2005 starting point). Beyond the middle of the century, the pathway of greenhouse gas emissions increasingly matters. Under the Current Commitments scenario, the best estimate of sea-level rise in 2100 is 0.8 m (2.7 ft) and sea level will likely rise between 0.6 m (2.0 ft) and 1.1 m (3.5 ft), barring unexpected processes driving rapid ice-sheet melt. Even with exceptionally rapid ice loss, it is very unlikely that it would exceed 1.5 m (4.9 ft).

Donald F Boesch↗

The Future of Integrated Performance Modeling in the Crew Health and Performance – Probabilistic Risk Assessment Project

The NASA engineering community utilizes event-driven and fault-tree probabilistic techniques to classify risks in the space environment by taking advantage of the inherent knowledge of complex spaceflight system design and testing to quantify failure risk. In harmonizing the risk of human space flight, answering the question of ‘How do we balance health, performance and resource risks with other engineering risks on long duration space missions?’ remains a deeply challenging and largely qualitative practice. The Human Research Program’s Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) was a significant step forward in efforts to robustly quantify the risk to crew health for exploration missions. However, there remains a significant gap in the ability to comprehensively assess and characterize risk across the disparate functionalities and capabilities which comprise the Crew Health and Performance (CHP) system. The Crew Health and Performance – Probabilistic Risk Assessment (CHP-PRA) project seeks to characterize CHP risks by expanding beyond the foundation established by its PRA predecessors like IMM and MEDPRAT, that simulate medical risk metrics like loss of crew life and evacuations. One of the new risk measures in the CHP-PRA system is embodied in our Performance Risk Model (PRisM). PRisM provides a novel way of assessing crew performance on mission tasks, using a generalized framework which relates back to NASA-STD-3001. This approach allows PRisM to capture and integrate data from a variety of different domains into a single, unified, reproducible representation of astronaut performance. In this presentation, we discuss the motivation for the CHP-PRA work and give a high level overview of the goals of the project, outline the forward work for PRisM, and discuss collaboration opportunities for the community who might explore if their domain knowledge and data could be represented, integrated, and quantified with these tools, whose outcomes are metrics useful for supporting operational mission planning and decision making.

Lauren McIntyre↗

Evolving Understanding of Antarctic Ice-Sheet Physics and Ambiguity in Probabilistic Sea-Level Projections

Mechanisms such as ice-shelf hydrofracturing and ice-cliff collapse may rapidly increase discharge from marine-based ice sheets. Here, we link a probabilistic framework for sea-level projections to a small ensemble of Antarctic ice-sheet (AIS) simulations incorporating these physical processes to explore their influence on global-mean sea-level (GMSL) and relative sea-level (RSL). We compare the new projections to past results using expert assessment and structured expert elicitation about AIS changes. Under high greenhouse gas emissions (Representative Concentration Pathway [RCP] 8.5), median projected 21st century GMSL rise increases from 79 to 146 cm. Without protective measures, revised median RSL projections would by 2100 submerge land currently home to 153 million people, an increase of 44 million. The use of a physical model, rather than simple parameterizations assuming constant acceleration of ice loss, increases forcing sensitivity: overlap between the central 90% of simulations for 2100 for RCP 8.5 (93-243 cm) and RCP 2.6 (26-98 cm) is minimal. By 2300, the gap between median GMSL estimates for RCP 8.5 and RCP 2.6 reaches >10 m, with median RSL projections for RCP 8.5 jeopardizing land now occupied by 950 million people (versus 167 million for RCP 2.6). The minimal correlation between the contribution of AIS to GMSL by 2050 and that in 2100 and beyond implies current sea-level observations cannot exclude future extreme outcomes. The sensitivity of post-2050 projections to deeply uncertain physics highlights the need for robust decision and adaptive management frameworks.

Kopp, Robert E.↗

A model to assess the Mars Telecommunications Network relay robustness

The relatively long mission durations and compatible radio protocols of current and projected Mars orbiters have enabled the gradual development of a heterogeneous constellation providing proximity communication services for surface assets. The current and forecasted capability of this evolving network has reached the point that designers of future surface missions consider complete dependence on it. Such designers, along with those architecting network requirements, have a need to understand the robustness of projected communication service. A model has been created to identify the robustness of the Mars Network as a function of surface location and time. Due to the decade-plus time horizon considered, the network will evolve, with emerging productive nodes and nodes that cease or fail to contribute. The model is a flexible framework to holistically process node information into measures of capability robustness that can be visualized for maximum understanding. Outputs from JPL's Telecom Orbit Analysis Simulation Tool (TOAST) provide global telecom performance parameters for current and projected orbiters. Probabilistic estimates of orbiter fuel life are derived from orbit keeping burn rates, forecasted maneuver tasking, and anomaly resolution budgets. Orbiter reliability is estimated probabilistically. A flexible scheduling framework accommodates the projected mission queue as well as potential alterations.

Mars Telecommunications Orbiter (MTO)↗

A Case Study for Probabilistic Methods Validation (MSFC Center Director's Discretionary Fund, Project No. 94-26)

Probabilistic method is not a universally accepted approach for the design and analysis of aerospace structures. The validity of this approach must be demonstrated to encourage its acceptance as it viable design and analysis tool to estimate structural reliability. The objective of this Study is to develop a well characterized finite population of similar aerospace structures that can be used to (1) validate probabilistic codes, (2) demonstrate the basic principles behind probabilistic methods, (3) formulate general guidelines for characterization of material drivers (such as elastic modulus) when limited data is available, and (4) investigate how the drivers affect the results of sensitivity analysis at the component/failure mode level.

Price J. M.↗

LDEXPT, an intelligent database system for the Composite Load Spectra project

The Composite Load Spectra project develops probabilistic models to simulate the probabilistic loads for selected components of a generic space propulsion system. Tremendous information such as engine load variables and their distributions is needed by the simulation program. An intelligent data base system was constructed and integrated with the probabilistic load simulation program to manage and maintain the knowledge base of the Composite Load Spectra project. The intelligent data base system takes care of the data retrieval and storage functions and has expert knowledge on engine load models and associated engine variables. The integration of the intelligent data base into the load simulation program achieves a smooth coupling between the numeric processing (load simulation calculation) and the symbolic processing (intelligent load information management).

Ho, H.↗

Overview of Future of Probabilistic Methods and RMSL Technology and the Probabilistic Methods Education Initiative for the US Army at the SAE G-11 Meeting

The SAE G-11 RMSL Division and Probabilistic Methods Committee meeting sponsored by the Picatinny Arsenal during March 1-3, 2004 at Westin Morristown, will report progress on projects for probabilistic assessment of Army system and launch an initiative for probabilistic education. The meeting features several Army and industry Senior executives and Ivy League Professor to provide an industry/government/academia forum to review RMSL technology; reliability and probabilistic technology; reliability-based design methods; software reliability; and maintainability standards. With over 100 members including members with national/international standing, the mission of the G-11s Probabilistic Methods Committee is to enable/facilitate rapid deployment of probabilistic technology to enhance the competitiveness of our industries by better, faster, greener, smarter, affordable and reliable product development.

Singhal, Surendra N.↗

Risk Management of NASA Projects

Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

Sarper, Hueseyin↗

Evaluation of Dynamic Coastal Response to Sea-level Rise Modifies Inundation Likelihood

Sea-level rise (SLR) poses a range of threats to natural and built environments, making assessments of SLR-induced hazards essential for informed decision making. We develop a probabilistic model that evaluates the likelihood that an area will inundate (flood) or dynamically respond (adapt) to SLR. The broad-area applicability of the approach is demonstrated by producing 30x30m resolution predictions for more than 38,000 sq km of diverse coastal landscape in the northeastern United States. Probabilistic SLR projections, coastal elevation and vertical land movement are used to estimate likely future inundation levels. Then, conditioned on future inundation levels and the current land-cover type, we evaluate the likelihood of dynamic response versus inundation. We find that nearly 70% of this coastal landscape has some capacity to respond dynamically to SLR, and we show that inundation models over-predict land likely to submerge. This approach is well suited to guiding coastal resource management decisions that weigh future SLR impacts and uncertainty against ecological targets and economic constraints.

Climate-change impacts↗

Risk Assessment for Asteroid Impact Threat Scenarios

Asteroid impacts can cause a wide range of damage through multiple potential hazards, from localized blast waves or thermal radiation, to tsunami inundation, to global climatic effects. The level of risk posed by these hazards depends not only upon their extent and severity, but also upon the likelihood of the various damage ranges. Some consequences may be more moderate but very likely, while others may be unlikely but catastrophic. Evaluating the risk from these hazards involves substantial uncertainties across all aspects of the problem, including the properties of the asteroid itself, the specifics of its entry, and the complex high-energy damage physics involved. NASA’s Asteroid Threat Assessment Project performs Probabilistic Asteroid Impact Risk (PAIR) assessments that use fast-running entry and hazard models to evaluate millions of impact cases representing the distributions of these many uncertain parameters. This paper presents current probabilistic asteroid impact risk assessment modeling tools and approaches used for evaluating specific asteroid impact threat cases. We give an overview of the current PAIR model used to support impact threat scenarios and discuss some of the key applications of these assessment in supporting response decisions and planetary defense preparedness. We then present the results and key findings from the recent 2023 PDC hypothetical impact exercise as an example of the primary types of risk results and metrics being developed to inform and support those mitigation and response decisions.

SMD↗

Geothermal probabilistic cost study

A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model was used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents was analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance were examined.

Orren, L. H.↗

Probabilistic Structural Analysis of the Solid Rocket Booster Aft Skirt External Fitting Modification

NASA has funded several major programs (the Probabilistic Structural Analysis Methods Project is an example) to develop probabilistic structural analysis methods and tools for engineers to apply in the design and assessment of aerospace hardware. A probabilistic finite element software code, known as Numerical Evaluation of Stochastic Structures Under Stress, is used to determine the reliability of a critical weld of the Space Shuttle solid rocket booster aft skirt. An external bracket modification to the aft skirt provides a comparison basis for examining the details of the probabilistic analysis and its contributions to the design process. Also, analysis findings are compared with measured Space Shuttle flight data.

Townsend, John S.↗

Validation of the NESSUS probabilistic finite element analysis computer program

A computer program, NESSUS, is being developed as part of a NASA-sponsored project to develop probabilistic structural analysis methods for propulsion system components. This paper describes the process of validating the NESSUS code, as it has been developed to date, and presents numerical results comparing NESSUS and exact solutions for a set of selected problems.

Wu, Y.-T.↗

Overview of the SAE G-11 RMSL (Reliability, Maintainability, Supportability, and Logistics) Division Activities and Technical Projects

The SAE G-11 RMSL (Reliability, Maintainability, Supportability, and Logistics) Division activities include identification and fulfillment of joint industry, government, and academia needs for development and implementation of RMSL technologies. Four Projects in the Probabilistic Methods area and two in the area of RMSL have been identified. These are: (1) Evaluation of Probabilistic Technology - progress has been made toward the selection of probabilistic application cases. Future effort will focus on assessment of multiple probabilistic softwares in solving selected engineering problems using probabilistic methods. Relevance to Industry & Government - Case studies of typical problems encountering uncertainties, results of solutions to these problems run by different codes, and recommendations on which code is applicable for what problems; (2) Probabilistic Input Preparation - progress has been made in identifying problem cases such as those with no data, little data and sufficient data. Future effort will focus on developing guidelines for preparing input for probabilistic analysis, especially with no or little data. Relevance to Industry & Government - Too often, we get bogged down thinking we need a lot of data before we can quantify uncertainties. Not True. There are ways to do credible probabilistic analysis with little data; (3) Probabilistic Reliability - probabilistic reliability literature search has been completed along with what differentiates it from statistical reliability. Work on computation of reliability based on quantification of uncertainties in primitive variables is in progress. Relevance to Industry & Government - Correct reliability computations both at the component and system level are needed so one can design an item based on its expected usage and life span; (4) Real World Applications of Probabilistic Methods (PM) - A draft of volume 1 comprising aerospace applications has been released. Volume 2, a compilation of real world applications of probabilistic methods with essential information demonstrating application type and timehost savings by the use of probabilistic methods for generic applications is in progress. Relevance to Industry & Government - Too often, we say, 'The Proof is in the Pudding'. With help from many contributors, we hope to produce such a document. Problem is - not too many people are coming forward due to proprietary nature. So, we are asking to document only minimum information including problem description, what method used, did it result in any savings, and how much?; (5) Software Reliability - software reliability concept, program, implementation, guidelines, and standards are being documented. Relevance to Industry & Government - software reliability is a complex issue that must be understood & addressed in all facets of business in industry, government, and other institutions. We address issues, concepts, ways to implement solutions, and guidelines for maximizing software reliability; (6) Maintainability Standards - maintainability/serviceability industry standard/guidelines and industry best practices and methodologies used in performing maintainability/ serviceability tasks are being documented. Relevance to Industry & Government - Any industry or government process, project, and/or tool must be maintained and serviced to realize the life and performance it was designed for. We address issues and develop guidelines for optimum performance & life.

Singhal, Surendra N.↗