Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Empirical Testing

The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.

Johnson, Kenneth L.↗

Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Derivations and Verification of Plans

The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques. This recommended procedure would be used as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. This document contains the outcome of the assessment.

Johnson, Kenneth L.↗

Expert system development for probabilistic load simulation

A knowledge based system LDEXPT using the intelligent data base paradigm was developed for the Composite Load Spectra (CLS) project to simulate the probabilistic loads of a space propulsion system. The knowledge base approach provides a systematic framework of organizing the load information and facilitates the coupling of the numerical processing and symbolic (information) processing. It provides an incremental development environment for building generic probabilistic load models and book keeping the associated load information. A large volume of load data is stored in the data base and can be retrieved and updated by a built-in data base management system. The data base system standardizes the data storage and retrieval procedures. It helps maintain data integrity and avoid data redundancy. The intelligent data base paradigm provides ways to build expert system rules for shallow and deep reasoning and thus provides expert knowledge to help users to obtain the required probabilistic load spectra.

Ho, H.↗

Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition)

Probabilistic Risk Assessment (PRA) is a comprehensive, structured, and logical analysis method aimed at identifying and assessing risks in complex technological systems for the purpose of cost-effectively improving their safety and performance. NASA's objective is to better understand and effectively manage risk, and thus more effectively ensure mission and programmatic success, and to achieve and maintain high safety standards at NASA. NASA intends to use risk assessment in its programs and projects to support optimal management decision making for the improvement of safety and program performance. In addition to using quantitative/probabilistic risk assessment to improve safety and enhance the safety decision process, NASA has incorporated quantitative risk assessment into its system safety assessment process, which until now has relied primarily on a qualitative representation of risk. Also, NASA has recently adopted the Risk-Informed Decision Making (RIDM) process [1-1] as a valuable addition to supplement existing deterministic and experience-based engineering methods and tools. Over the years, NASA has been a leader in most of the technologies it has employed in its programs. One would think that PRA should be no exception. In fact, it would be natural for NASA to be a leader in PRA because, as a technology pioneer, NASA uses risk assessment and management implicitly or explicitly on a daily basis. NASA has probabilistic safety requirements (thresholds and goals) for crew transportation system missions to the International Space Station (ISS) [1-2]. NASA intends to have probabilistic requirements for any new human spaceflight transportation system acquisition. Methods to perform risk and reliability assessment in the early 1960s originated in U.S. aerospace and missile programs. Fault tree analysis (FTA) is an example. It would have been a reasonable extrapolation to expect that NASA would also become the world leader in the application of PRA. That was, however, not to happen. Early in the Apollo program, estimates of the probability for a successful roundtrip human mission to the moon yielded disappointingly low (and suspect) values and NASA became discouraged from further performing quantitative risk analyses until some two decades later when the methods were more refined, rigorous, and repeatable. Instead, NASA decided to rely primarily on the Hazard Analysis (HA) and Failure Modes and Effects Analysis (FMEA) methods for system safety assessment.

Stamatelatos,Michael↗

Developing Probabilistic Safety Performance Margins for Unknown and Underappreciated Risks

Probabilistic safety requirements currently formulated or proposed for space systems, nuclear reactor systems, nuclear weapon systems, and other types of systems that have a low-probability potential for high-consequence accidents depend on showing that the probability of such accidents is below a specified safety threshold or goal. Verification of compliance depends heavily upon synthetic modeling techniques such as PRA. To determine whether or not a system meets its probabilistic requirements, it is necessary to consider whether there are significant risks that are not fully considered in the PRA either because they are not known at the time or because their importance is not fully understood. The ultimate objective is to establish a reasonable margin to account for the difference between known risks and actual risks in attempting to validate compliance with a probabilistic safety threshold or goal. In this paper, we examine data accumulated over the past 60 years from the space program, from nuclear reactor experience, from aircraft systems, and from human reliability experience to formulate guidelines for estimating probabilistic margins to account for risks that are initially unknown or underappreciated. The formulation includes a review of the safety literature to identify the principal causes of such risks.

Safety Performance Margin↗

Dynamic Modeling of Ascent Abort Scenarios for Crewed Launches

For the last 30 years, the United States' human space program has been focused on low Earth orbit exploration and operations with the Space Shuttle and International Space Station programs. After over 40 years, the U.S. is again working to return humans beyond Earth orbit. To do so, NASA is developing a new launch vehicle and spacecraft to provide this capability. The launch vehicle is referred to as the Space Launch System (SLS) and the spacecraft is called Orion. The new launch system is being developed with an abort system that will enable the crew to escape launch failures that would otherwise be catastrophic as well as probabilistic design requirements set for probability of loss of crew (LOC) and loss of mission (LOM). In order to optimize the risk associated with designing this new launch system, as well as verifying the associated requirements, NASA has developed a comprehensive Probabilistic Risk Assessment (PRA) of the integrated ascent phase of the mission that includes the launch vehicle, spacecraft and ground launch facilities. Given the dynamic nature of rocket launches and the potential for things to go wrong, developing a PRA to assess the risk can be a very challenging effort. Prior to launch and after the crew has boarded the spacecraft, the risk exposure time can be on the order of three hours. During this time, events may initiate from either the spacecraft, the launch vehicle, or the ground systems, thus requiring an emergency egress from the spacecraft to a safe ground location or a pad abort via the spacecraft's launch abort system. Following launch, again either the spacecraft or the launch vehicle can initiate the need for the crew to abort the mission and return home. Obviously, there are thousands of scenarios whose outcome depends on when the abort is initiated during ascent and how the abort is performed. This includes modeling the risk associated with explosions and benign system failures that require aborting a spacecraft under very dynamic conditions, particularly in the lower atmosphere, and returning the crew home safely. This paper will provide an overview of the PRA model that has been developed of this new launch system, including some of the challenges that are associated with this effort.

Bigler, Mark↗

Dynamic Modeling of Ascent Abort Scenarios for Crewed Launches

For the last 30 years, the United States's human space program has been focused on low Earth orbit exploration and operations with the Space Shuttle and International Space Station programs. After nearly 50 years, the U.S. is again working to return humans beyond Earth orbit. To do so, NASA is developing a new launch vehicle and spacecraft to provide this capability. The launch vehicle is referred to as the Space Launch System (SLS) and the spacecraft is called Orion. The new launch system is being developed with an abort system that will enable the crew to escape launch failures that would otherwise be catastrophic as well as probabilistic design requirements set for probability of loss of crew (LOC) and loss of mission (LOM). In order to optimize the risk associated with designing this new launch system, as well as verifying the associated requirements, NASA has developed a comprehensive Probabilistic Risk Assessment (PRA) of the integrated ascent phase of the mission that includes the launch vehicle, spacecraft and ground launch facilities. Given the dynamic nature of rocket launches and the potential for things to go wrong, developing a PRA to assess the risk can be a very challenging effort. Prior to launch and after the crew has boarded the spacecraft, the risk exposure time can be on the order of three hours. During this time, events may initiate from either of the spacecraft, the launch vehicle, or the ground systems, thus requiring an emergency egress from the spacecraft to a safe ground location or a pad abort via the spacecraft's launch abort system. Following launch, again either the spacecraft or the launch vehicle can initiate the need for the crew to abort the mission and return to the home. Obviously, there are thousands of scenarios whose outcome depends on when the abort is initiated during ascent as to how the abort is performed. This includes modeling the risk associated with explosions and benign system failures that require aborting a spacecraft under very dynamic conditions, particularly in the lower atmosphere, and returning the crew home safely. This paper will provide an overview of the PRA model that has been developed of this new launch system, including some of the challenges that are associated with this effort. Key Words: PRA, space launches, human space program, ascent abort, spacecraft, launch vehicles

Bigler, Mark↗

Wildfire-fighting Use Case Requirements to Monitor

In this technical report, we provide requirements for a wildfire-fighting use-case, towards the Safety Demonstrator 1. The use case will incorporate ground and airborne assets operating in a coordinated fashion, and will comprise five activities, from detection to the execution of the initial attack. Depending on the activity and the data involved, the requirements identified may be non-probabilistic or probabilistic. In both cases, we first identify some of the requirements we wish to monitor, and then present a formalization using the language of requirements of the NASA requirements elicitation tool FRET. To formalize probabilistic requirements, we use a novel extension to FRET’s requirements language that incorporates notions of probability, and discuss how requirements can be translated into existing probabilistic temporal logics like PCTL. We exemplify how some of the requirements presented can be monitored using the existing tools Ogma and Copilot. We close with a summary and future directions.

Requirements↗

Emulation With Uncertainty Quantification of Regional Sea‐Level Change Caused by the Antarctic Ice Sheet

Abstract Projecting regional sea‐level change under various climate‐change scenarios typically involves running forward simulations of the Earth's gravitational, rotational and deformational (GRD) response to ice‐mass change, which requires substantial computational cost if applied to probabilistic frameworks requiring thousands to millions of samples. Here we build emulators of regional sea‐level change at 27 coastal locations, due to the GRD effects associated with future Antarctic Ice Sheet mass change over the 21st century. The emulators are evaluated against a numerical sea‐level model applied to an ensemble of ice‐sheet model simulations of the Antarctic Ice Sheet through 2100. We build a physics‐based emulator using a recent sensitivity kernel approach and compare it to machine learning based emulators (neural network and conditional variational autoencoder methods). In order to quantify uncertainty, we derive well‐calibrated prediction intervals for regional sea‐level change via split‐conformal inference and linear regression, and show that Monte Carlo dropout does not yield well‐calibrated uncertainties in this instance. We also demonstrate substantial gains in computational efficiency using both the physics‐based emulator and neural networks in comparison to the numerical model for the complete regional sea‐level solution. Overall, we find the physics‐based emulator modestly outperforms the machine learning emulators for this problem.

58 GEOSCIENCES↗

Global/local methods for probabilistic structural analysis

A probabilistic global/local method is proposed to reduce the computational requirements of probabilistic structural analysis. A coarser global model is used for most of the computations with a local more refined model used only at key probabilistic conditions. The global model is used to establish the cumulative distribution function (cdf) and the Most Probable Point (MPP). The local model then uses the predicted MPP to adjust the cdf value. The global/local method is used within the advanced mean value probabilistic algorithm. The local model can be more refined with respect to the g1obal model in terms of finer mesh, smaller time step, tighter tolerances, etc. and can be used with linear or nonlinear models. The basis for this approach is described in terms of the correlation between the global and local models which can be estimated from the global and local MPPs. A numerical example is presented using the NESSUS probabilistic structural analysis program with the finite element method used for the structural modeling. The results clearly indicate a significant computer savings with minimal loss in accuracy.

Millwater, H. R.↗

Let’s speak FRETish

FRET (https://github.com/NASA-SW-VnV/fret [github.com]) is a framework for the elicitation, formalization and analysis of requirements. FRET allows its user to enter requirements in a structured natural language called FRETish. Requirements written in FRETish are assigned unambiguous semantics. FRET supports its users in understanding this semantics and repairing requirements if applicable, by utilizing a variety of forms for each requirement: natural language description, formal mathematical logics, diagrams, and interactive simulation. FRET exports requirements into forms that can be used by a variety of analysis tools, including state-of-the-art model checkers and runtime monitoring tools. The talk will cover some of the theory behind the framework, present case studies from the aerospace and robotics domains, as well as current work on extending FRET for specifying requirements for software that learns.

FRET↗

Applying Monte Carlo Simulation to Launch Vehicle Design and Requirements Verification

This paper is focused on applying Monte Carlo simulation to probabilistic launch vehicle design and requirements verification. The approaches developed in this paper can be applied to other complex design efforts as well. Typically the verification must show that requirement "x" is met for at least "y" % of cases, with, say, 10% consumer risk or 90% confidence. Two particular aspects of making these runs for requirements verification will be explored in this paper. First, there are several types of uncertainties that should be handled in different ways, depending on when they become known (or not). The paper describes how to handle different types of uncertainties and how to develop vehicle models that can be used to examine their characteristics. This includes items that are not known exactly during the design phase but that will be known for each assembled vehicle (can be used to determine the payload capability and overall behavior of that vehicle), other items that become known before or on flight day (can be used for flight day trajectory design and go/no go decision), and items that remain unknown on flight day. Second, this paper explains a method (order statistics) for determining whether certain probabilistic requirements are met or not and enables the user to determine how many Monte Carlo samples are required. Order statistics is not new, but may not be known in general to the GN&C community. The methods also apply to determining the design values of parameters of interest in driving the vehicle design. The paper briefly discusses when it is desirable to fit a distribution to the experimental Monte Carlo results rather than using order statistics.

Hanson, John M.↗

Exploring Requirements for Software that Learns: A Research Preview

Context & motivation: The development of software that learns has revolutionized how many systems perform. For the most part, these systems are neither safety- nor mission-critical. However, as technology and aspirations advance, there is an increased desire and need for Machine Learning (ML) software in safety- and mission-critical systems, e.g., driverless cars or autonomous space robotics. Problem: In these domains, reliability is crucial and systems have to undergo much scrutiny in terms of both the developed artefacts and the adopted development process. Central to the development of such systems is the elicitation and definition of software requirements that are used to guide the design and verification process. The addition of software components that learn, and the associated capability for unforeseen behavior, makes defining detailed software requirements especially difficult. Principal ideas/results: In this paper, we identify unique characteristics of software requirements that are specific to ML components. To this end, we collect and examine requirements from both academic and industrial sources. Contribution: To the best of our knowledge, this is the first work that presents real-life, industrial patterns of requirements for ML components. Furthermore, this paper identifies key characteristics and provides a foundation for developing a taxonomy of requirements for software that learns.

Probabilistic requirements↗

Development of Advanced Life Cycle Costing Methods for Technology Benefit/Cost/Risk Assessment

The overall objective of this three-year grant is to provide NASA Langley's System Analysis Branch with improved affordability tools and methods based on probabilistic cost assessment techniques. In order to accomplish this objective, the Aerospace Systems Design Laboratory (ASDL) needs to pursue more detailed affordability, technology impact, and risk prediction methods and to demonstrate them on variety of advanced commercial transports. The affordability assessment, which is a cornerstone of ASDL methods, relies on the Aircraft Life Cycle Cost Analysis (ALCCA) program originally developed by NASA Ames Research Center and enhanced by ASDL. This grant proposed to improve ALCCA in support of the project objective by updating the research, design, test, and evaluation cost module, as well as the engine development cost module. Investigations into enhancements to ALCCA include improved engine development cost, process based costing, supportability cost, and system reliability with airline loss of revenue for system downtime. A probabilistic, stand-alone version of ALCCA/FLOPS will also be developed under this grant in order to capture the uncertainty involved in technology assessments. FLOPS (FLight Optimization System program) is an aircraft synthesis and sizing code developed by NASA Langley Research Center. This probabilistic version of the coupled program will be used within a Technology Impact Forecasting (TIF) method to determine what types of technologies would have to be infused in a system in order to meet customer requirements. A probabilistic analysis of the CER's (cost estimating relationships) within ALCCA will also be carried out under this contract in order to gain some insight as to the most influential costs and the impact that code fidelity could have on future RDS (Robust Design Simulation) studies.

Yackovetsky, Robert↗

Lunar Exploration Architecture Level Key Drivers and Sensitivities

Strategic level analysis of the integrated behavior of lunar transportation and lunar surface systems architecture options is performed to assess the benefit, viability, affordability, and robustness of system design choices. This analysis employs both deterministic and probabilistic modeling techniques so that the extent of potential future uncertainties associated with each option are properly characterized. The results of these analyses are summarized in a predefined set of high-level Figures of Merit (FOMs) so as to provide senior NASA Constellation Program (CxP) and Exploration Systems Mission Directorate (ESMD) management with pertinent information to better inform strategic level decision making. The strategic level exploration architecture model is designed to perform analysis at as high a level as possible but still capture those details that have major impacts on system performance. The strategic analysis methodology focuses on integrated performance, affordability, and risk analysis, and captures the linkages and feedbacks between these three areas. Each of these results leads into the determination of the high-level FOMs. This strategic level analysis methodology has been previously applied to Space Shuttle and International Space Station assessments and is now being applied to the development of the Constellation Program point-of-departure lunar architecture. This paper provides an overview of the strategic analysis methodology and the lunar exploration architecture analyses to date. In studying these analysis results, the strategic analysis team has identified and characterized key drivers affecting the integrated architecture behavior. These key drivers include inclusion of a cargo lander, mission rate, mission location, fixed-versus- variable costs/return on investment, and the requirement for probabilistic analysis. Results of sensitivity analysis performed on lunar exploration architecture scenarios are also presented.

Goodliff, Kandyce↗

Probabilistic Impact Assessment and Software Tool Requirements

This research project will address the most pressing uncertainties in modeling and measuring the electric power grid effects of geomagnetic disturbances (GMDs) and the E3 portion of nuclear electromagnetic pulse (EMP). The primary goal is to help decision-makers in the electric power sector have the knowledge and tools they need to most effectively mitigate GMD effects on the North American electric grid, with a secondary focus on EMP response. Primary tasks will involve comprehensive modeling,

24 POWER TRANSMISSION AND DISTRIBUTION↗