Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Solutions for Enhanced Legacy Probabilistic Risk Assessment Tools and Methodologies: Improving Efficiency of Model Development and Processing via Innovative Human Reliability Dependency Analysis

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improved quantification speed, increased ability to efficiently model multi-hazard models, and improved modeling human action dependency in PRA. This report is focused on the third critical area, improvements in dependency analysis of human actions conducted as part of a typical human reliability assessment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Time domain probabilistic seismic risk analysis using ground motion prediction equations of Fourier amplitude spectra

Modeling of Fourier amplitude spectra (FAS) of seismic motions has gained much attention in engineering seismology. In the past few years, several ground motion prediction equations (GMPEs) and inter-frequency correlation structure of FAS have been established. Due to many preferable characteristics of FAS, probabilistic seismic hazard/risk analysis is rapidly changing from ergodic, spectrum acceleration Sa(T 0 )-based approach to non-ergodic, site-specific, FAS-based approach. This paper presents time domain intrusive framework for probabilistic seismic risk analysis using GMPE of FAS. Herein, methodology for time domain stochastic ground motion modeling based on GMPEs of FAS is presented in some detail. The simulated uncertain motions are modeled as a random process and represented by polynomial chaos Karhunen-Loève expansion. The random process excitations are further propagated into the uncertain structural system using Galerkin stochastic finite element method (SFEM). Probabilistic evolution of structural response is solved, and such solution is used to develop seismic risk for any damage state. The presented framework is illustrated through seismic risk analysis of a four-story building subjected to possible earthquakes from two strike slip faults. The influences of the epistemic uncertainties in source stress drop Δσ and site attenuation κ0 on seismic risk are investigated. The need for non-ergodic seismic risk analysis with source-specific and site specific characterizations is emphasized.

58 GEOSCIENCES↗

Evaluating FRI3D for Cost Savings in Fire Hazard Analysis at DOE Sites

A fire hazard analysis, required for many U.S. Department of Energy (DOE) facilities, is a complex, cumbersome, and costly process. Fire hazard analyses may be viewed as a checkbox, but ideally and in spirit with the DOE-STD-1066, the fire hazard analysis (FHA) should be a part of the workflow and used to help in modifications, maintenance, and improving operational safety. With current FHA development processes, it is both time and cost prohibitive for true integration. A tool called Fire Risk Investigation in 3D or FRI3D was developed under the DOE Light Water Reactor Sustainability program to simplify and automate many aspects of a fire probabilistic risk analysis for existing nuclear power plants. The FRI3D tool automates fire scenarios by combining approved fire simulation codes, U.S. Nuclear Regulatory Commission fire calculations methods, 3D modeling and visualization, and probabilistic risk analysis models into a single workflow supported with a user interface. FRI3D was initially designed for used in combination with a PRA, this case study, evaluated using FRI3D for a plant modification, determined the benefits that detailed fire modeling can have for U.S. Department of Energy facilities with or without a PRA model. It also looked at what tasks from DOE requirements could be reduced using the tool and what is needed to integrate fire hazard analysis into site workflow.

97 - MATHEMATICS AND COMPUTING↗

Survey of Cyber Risk Analysis Techniques for Use in the Nuclear Industry

Using traditional probabilistic risk analysis methods for severe accident safety risk management on non-digital systems, structures, and components at nuclear power plants is well-established. In contrast, cyber risk analysis of digital assets is still an immature field with unproven techniques due, in part, to the continuously changing threat environment and the challenge of digital assets failing in unexpected ways. As the nuclear fleet continues to adopt digital instrumentation and control systems, it is increasingly important to have effective and efficient cyber risk analysis techniques to support risk management decisions, such as risk elimination by system redesign or risk mitigation by implementation of prioritized security controls. To understand the state of the art in cyber risk analysis for future research, we surveyed 36 publications across ten application domains. We describe our survey methodology and rate each technique based upon scope, adoptability, and repeatability. In this work, we examine the unique constraints of the nuclear industry and outline the strengths and weaknesses of using the cyber risk analysis techniques in the industry, highlighting gaps with current techniques. We also discuss challenges and potential research directions for advancing the science for both existing and new advanced reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A systematic decision-making methodology to formalize the selection of degree of realism in screening analysis of probabilistic risk assessment

In the nuclear power domain, Probabilistic Risk Assessment (PRA) is used to inform decision-making for Nuclear Power Plants (NPPs). Recently, there has been an increase in the utilization of modeling and simulation (M&S) to support the estimation of PRA inputs. Risk analysts should carefully select the PRA items that require M&S and their degree of realism (DoR) with consideration of the required resources. To support this selection, this article formulates a systematic decision-making approach for the DoR selection. The DoR selection is made based on two predictive decision-making attributes: the predicted differences in safety risk estimate (ΔSaRi) and the cost of analysis (ΔCAN). This research also develops and quantifies causal models to estimate ΔSaRi and ΔCAN. The causal model-based prediction of ΔSaRi and ΔCAN helps reduce the trial-and-error nature of the DoR selection in the PRA screening analysis and provides insights for DoR selection and the gradual refinements of PRA realism. This approach is demonstrated for a case study on fire PRA of NPPs, where an adequate DoR is selected from two fire models: an engineering correlation and a zone model.

Alkhatib, Sari [Department of Nuclear, Plasma, and↗

Fire Risk Investigation in 3D (FRI3D) Software and Process for Integrated Fire Modeling

Modeling and implementing fire safety for nuclear power plants is a costly activity. Because of the complexity of fire phenomena and multiple operational procedures, it is difficult to computationally provide assurance that mitigation methods are adequate for critical areas using current analysis methods in a cost-effective manner. The nuclear industry needs efficient methods to provide more accurate modeling and optimize mitigation methods to improve nuclear power plant understanding for fire scenarios. This report describes the work done over the last two year on the Fire Risk Investigation in 3D (FRI3D) software. This software simplifies the modeling process by importing existing plant models and data, incorporating a 3D modeling environment and coupling with the fire simulation software CFAST. This eliminates the manual labor and errors associated with much of the fire modeling process. The report lays out the status and path of FRID software for the Risk Informed Safety Analysis pathway of the Light Water Reactor Sustainability project at Idaho National Laboratory and industry collaborators to best help reduce costs and improve realism in fire probabilistic risk analysis.

97 MATHEMATICS AND COMPUTING↗

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN↗

Risk-Informed Safety Analysis for Accident Tolerant Fuels

Accident Tolerant Fuels (ATF) are being tested by different nuclear vendors and research organizations and their introduction in the US light water reactors fleet is planned for the second half of the 2020`s. In the framework of the US-DOE Light-Water Reactor Sustainability program, Risk-Informed Systems Analysis pathway, researches are being conducted at the Idaho National Laboratory for developing tools and methods that can help the industry quantifying the benefits from the adoption of ATF technology. In this paper we describe the developed risk-informed methodology including the safety analysis codes improvements, and we present some results for selected accident scenarios. The developed methodology combines INL state-of-the-art deterministic Best Estimate code RELAP5-3D, and Probabilistic Risk Analysis tools RAVEN and SAPHIRE. The analyses are performed on a three-loops pressurized water reactor, simulating Station Blackout and LB-LOCA accidents and considering near-term ATFs, or FeCrAl and Chromium-coated clads. Finally, we show how, applying our methodology, the new Core Damage Frequency can be assessed. The results indicated that the main benefits in introducing near-term ATFs concern a significant reduction in the hydrogen production during accident conditions. No significant Core Damage Frequency reduction was found.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Uncertainty quantification in MELCOR Safety analysis of ARIES reactor designs

MELCOR-TMAP is a combined thermal-hydraulics and tritium tracking code developed to simulate severe accident scenarios in fission and fusion power plants. Here, we demonstrate the results of MELCOR-TMAP analyses on historical ARIES program reference designs. By coupling MELCOR-TMAP with the open source RAVEN probabilistic risk analysis framework’s Bayesian UQ capabilities, we also demonstrate key uncertainties in material properties with the highest impact on tritium inventory and plant risk.

70 - PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Risk-Informed Safety Analysis for Accident Tolerant Fuels

Accident Tolerant Fuels (ATF) are being tested by different nuclear vendors and research organization and their introduction in light water reactors fleet is planned for the second half of the 2020`s. In the framework of the US-DOE Light-Water Reactor Sustainability program, Risk-Informed Safety Analysis pathway (LWRS-RISA), research activities are being conducted at the Idaho National Laboratory (INL) for developing tools and methods that can help the industry in quantifying the ATF introduction benefits. In this paper we describe the developed risk-informed methodology, the codes improvements and we present some results for selected accidental conditions. The developed methodology combines INL state-of-the-art deterministic Best Estimate tools like RELAP5-3D code, and Probabilistic Risk Analysis tools like RAVEN and SAPHIRE codes. The analyses are performed on a three-loops pressurized water reactor (PWR) simulating accidental conditions like Station Blackout and LB-LOCA and considering near-term ATF (FeCrAl and Chromium-coated clads). Finally, we show, through our methodologies, how the delta-Core Damage Frequency can be assessed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

High Energy Arcing Fault (HEAF): Sandia National Laboratories 2023 Report

High Energy Arcing Faults (HEAFs) are hazardous events in which an electrical arc leads to the rapid release of energy in the form of heat, vaporized metal, and mechanical force. In Nuclear Power Plants (NPPs), these events are often accompanied by loss of essential power and complicated shutdowns. To confirm the probabilistic risk analysis (PRA) methodology in NUREG/CR-6850, which was formulated based on limited observational data, the NRC led an international experimental campaign from 2014 to 2016. The results of these experiments uncovered an unexpected hazard posed by aluminum components in or near electrical equipment and the potential for unanalyzed equipment failures. Sandia National Laboratories (SNL), in support of the NRC work, collaborated with NIST, BSI, KEMA, and NRC to support the full-scale HEAF test campaign in 2023. SNL provided high speed and real time from visible and infrared video/data of tests that collected data from copper and aluminum busses from switchgears and bus-ducts. Part of SNL work was to place cameras with high-speed data collection capability at different vantage points that provide the NRC a more complete and granular view of the test events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

High Energy Arcing Fault (HEAF) Photometrics 2022 Test Report

High Energy Arcing Faults (HEAFs) are hazardous events in which an electrical arc leads to the rapid release of energy in the form of heat, vaporized metal, and mechanical force. In Nuclear Power Plants, these events are often accompanied by loss of essential power and complicated shutdowns. To confirm the probabilistic risk analysis (PRA) methodology in NUREG/CR-6850, which was formulated based on limited observational data, the NRC led an international experimental campaign from 2014 to 2016. The results of these experiments uncovered an unexpected hazard posed by aluminum components in or near electrical equipment and the potential for unanalyzed equipment failures. Sandia National Laboratories (SNL), in support of the NRC work, collaborated with NIST, BSI, KEMA, and NRC to support the full-scale HEAF test campaign in 2022. SNL provided high speed visible and infrared video/data of ten tests that collected data from HEAFs originated on copper and aluminum buses inside switchgears and bus ducts. Part of the SNL scope was to place cameras with high-speed data collection at different vantage points within the test facility to provide NRC a more complete and granular view of the test events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Root Cause Correlation Analysis of Software Failures via Orthogonal Defect Classification and Natural Language Processing

Systems theoretic process analysis (STPA) is becoming an increasingly popular technique to assess how complex digital software systems can fail. Rather than defining failures by their observable failure events, which may be sparse especially for safety rated nuclear digital instrumentation and control systems (DI&C), failures are defined as postulated unsafe actions under specific contextual conditions. This permits a top-down analysis of system hazards and identifies whether imposed constraints and requirements can sufficiently address undesirable hazards. However, STPA is a qualitative approach at identifying inadequacies in the development process and cannot currently be used to quantify unsafe action likelihoods for probabilistic risk assessment. Therefore, in this work, we examine the root causes of software failure and explore whether a consistent correlation can be linked to specific unsafe action classes. We implement Lbl2Vec, an unsupervised document classification and retrieval algorithm, on a database of 4,096 software defect reports acquired from various open-source software systems. By analyzing sentence structure, embedded labels, and word vectors, we show that certain defect types positively correlate to specific unsafe action classes over others. The correlations developed can be used to estimate the failure probability of safety intended DI&C systems which provides a licensing basis for nuclear plant modernization efforts.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Root Cause Correlation Analysis of Software Failures via Orthogonal Defect Classification and Natural Language Processing

Systems theoretic process analysis (STPA) is becoming an increasingly popular technique to assess how complex digital software systems can fail. Rather than defining failures by their observable failure events, which may be sparse especially for safety rated nuclear digital instrumentation and control systems (DI&C), failures are defined as postulated unsafe actions under specific contextual conditions. This permits a top-down analysis of system hazards and identifies whether imposed constraints and requirements can sufficiently address undesirable hazards. However, STPA is a qualitative approach at identifying inadequacies in the development process and cannot currently be used to quantify unsafe action likelihoods for probabilistic risk assessment. Therefore, in this work, we examine the root causes of software failure and explore whether a consistent correlation can be linked to specific unsafe action classes. We implement Lbl2Vec, an unsupervised document classification and retrieval algorithm, on a database of 4,096 software defect reports acquired from various open-source software systems. By analyzing sentence structure, embedded labels, and word vectors, we show that certain defect types positively correlate to specific unsafe action classes over others. The correlations developed can be used to estimate the failure probability of safety intended DI&C systems which provides a licensing basis for nuclear plant modernization efforts.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Wildfire Risk Evaluation Framework for Grid Operations and Planning

The United States (US) environmental protection agency's (EPA's) climate change indicators for wildfires show a long-term trend of increased annual wildfire activity, larger wildfire size, and more variable dynamics in wildfire behavior. This has caused more frequent preemptive public safety power shutoff (PSPS) events in the regions with recognized high wildfire risk. These preemptive power shutoffs attempt to prevent the ignition of a wildfire but it nonetheless renders the transmission line non-operational, which often sheds load of downstream communities. As wildfires and PSPS events become more frequent, it is crucial to find the communities most at risk of load shedding. To that end, this paper proposes the wildfire risk evaluation of the system (WiRES) framework, which is a performance-based framework that translates extreme weather-related and PSPS event probabilities into a cumulative probability of a non-operational transmission line. This study also provides a geospatial visualization tool that breaks down the entire western electrical coordinating council (WECC) region into 50 km grid cells which can be used to 1) filter out transmission lines with higher than a threshold outage probability, and 2) graphically discover the affected regions and their biophysical and socioeconomic metrics. %such as the social vulnerability index, population density, gross domestic product, etc. Lastly, an impact assessment study is conducted which connects the results of the proposed framework to python and powerworld-based contingency analysis to highlight the applicability of the framework.

Wildfire, Resilience, Extreme Events, Grid Reslien↗

Important Human Actions for Advanced Reactors: Implications for Human Factors

As advanced reactor platforms continue to develop and gain traction in the energy sector there is a need for risk-informed, scalable regulations that match that progress. This is a core component of the U.S. Nuclear Regulatory Commission’s proposed Part 53 Rule Making; the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy (ADVANCE) Act; and other efforts that seek to update nuclear power regulations. This paper covers one key aspect of that regulatory evolution: Important Human Actions (IHA). In this paper, we discuss how the understanding and definitions of IHAs have changed and what that means for human factors engagement through the process of developing these technologies. Instead of a narrow focus on control actions that led to an increase in core damage risk, the new focus is on IHAs is “wherever they occur.” What this means is that having a highly automated or passive safety system does not eliminate IHAs. Rather, it shifts the focus point to all the actions that enable these systems. Everything from maintenance, to design, to training can be considered an IHA and that dramatically shifts the efforts and level of engagement necessary for human factors to enable these technologies. We discuss the notions of risk-informed human factors that underpin these efforts, give several examples, and briefly describe the risk assessment methodologies that will be needed. In the past, IHAs were identified and then became a focus point of human factors engineering (HFE) activities to ensure a robust evaluation of the task was completed. The future is less clear. HFE for nuclear energy will need to evolve and become more integrated in technology development than ever before.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Dose Consequence and Probabilistic Risk Assessment Integration into Digital Documented Safety Analysis

This is an intern poster presentation. The current reactor authorization process is complex and error prone. The development of a digital Documented Safety Analysis has been proposed to provide an automated and integrated solution to enhance the design and authorization process. The digital DSA will consist of interlinked models, analyses, and reports, all of which will be updated using automated workflows when design changes are made. This poster examines the integration of the probabilistic risk assessment (PRA) with the transient and dose consequence analyses. A PRA for a generic high temperature gas-cooled reactor (HTGR) has been constructed which will drive the input parameters for a transient analysis model currently being constructed. Dose consequence will be determined using the results of the transient analysis and the Radiation Safety Analysis Computer (RSAC) code. Dose consequence data will then be input back into the PRA to drive design parameters.

42 ENGINEERING↗