Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Closeout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Data Release and Project Closeout

A dataset containing procedures to: 1.) Make a dataset public 2.) Closeout a project on the Data Hub

EMN, HydroGEN, data governance, PUID, Data Hub, Da↗

Data Release and Project Closeout

A dataset containing procedures to: 1.) Make a dataset public 2.) Closeout a project on the Data Hub

EMN, ElectroCat, data governance, PUID, Data Hub, ↗

Data Release and Project Closeout

A dataset containing procedures to: 1.) Make a dataset public 2.) Closeout a project on the Data Hub

EMN, HyMARC, data governance, PUID, Data Hub, Data↗

Deep Well #4 Backup Power Systems Project Closeout Report

The project scope was to install a diesel generated power source to deep well 4 in addition to the existing commercial power source. The diesel power source and its fuel supply system shall be seismically qualified to withstand a Performance Category 4 (PC-4) seismic event. This diesel power source will permit the deep well to operate during a loss of commercial power. System design will incorporate the ability to select and transfer power between the new diesel power source and commercial power sources for the the deep well motor and TRA-672 building loads.

99 GENERAL AND MISCELLANEOUS↗

Project Closeout Report for the MFC Firewater Replacement Project

The Material and Fuels Complex (MFC) Firewater Replacement Project was an indirectly funded Institutional General Plant Project (IGPP) capital acquisition initiated in July 2013 and completed in June 2016. Its purpose was to improve the capacity, redundancy and reliability of the MFC fire water and potable water systems, making them compliant with DOE O 420.1C and applicable state and federal regulations.

99 GENERAL AND MISCELLANEOUS↗

Final Project Closeout Report for Sprint Hydrogen Fuel Cell (HFC) Deployment Project in California, Gulf Coast and Eastern Seaboard Markets

Sprint is one of the telecommunications industry leaders in the deployment of hydrogen fuel cell (HFC) systems to provide backup power for their mission critical wireless network facilities. With several hundred fuel cells commissioned in California, states in the gulf coast region, and along the upper eastern seaboard. A strong incentive for advancing the integration of fuel cells into the Sprint network came through the award of a Department of Energy (DOE) grant focused on Market Transformation activities for project (EE0000486). This grant was funded by the 2009 American Recovery and Reinvestment Act (ARRA). The funding provided by DOE ($7.295M) was allocated to support the installation of 260 new HFC systems, equipped with an on-site refillable Medium Pressure Hydrogen Storage Solution (MPHSS), as well as for the conversion of 21 low pressure hydrogen systems to the MPHSS, in hopes of reducing barriers to market acceptance.

08 HYDROGEN↗

Multi-scale, Multi-disciplinary, and Multi-agent Explainable AI with Koopman-Undergirded Learning, Prediction, and Analysis (M3EA KULPA) (Project Closeout Report)

The goal of this project was to develop and use domain-aware machine learning formulations, based on the Koopman Operator (KO), for modelling multi-scale, multi-disciplinary (e.g., multi-physics), and/or multi-agent systems. The project developed these formulations for the following cases: • Systems with dynamics at two separate time scales, • Systems with a bi-level hierarchical control structure, • Systems with bi-level hierarchical control and dynamics at two separate time scales (the lower level controls operating at the faster time scale), and • Systems with n separate but interacting agents/disciplines (with/without control, respectively); the controls for each agent could include bi-level hierarchical control and dynamics at two separate time scales as described above. The project then defined a set of dynamical systems consisting of different nonlinear oscillators that could be used to test these different formulations and then subsequently learned the KO models for those systems. With the KO models, we were able to do the following: • Quantify system stability, including both long-term and transient behavior, • Quantify the effects of feedbacks between the different time scales and agents/disciplines in terms of those feedbacks’ effects on system stability, • Replace a standard Proportional-Integral (PI) control in the hierarchical control structure with a KO-based Linear-Quadratic Regular (LQR), a form of optimal control, • Calculate optimal supervisory control policies a) with and without time scale separated dynamics at the lower level control levels and b) with both PI and KO-based LQR lower level control policies, and • Calculate dynamic Nash equilibria for multi-agent systems where each agent makes its own control decisions.

97 MATHEMATICS AND COMPUTING↗

Nevada National Security Site Industrial Sites Project Closeout - 12498

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is responsible for environmental restoration (ER) at the Nevada National Security Site (NNSS). This includes remediation at Industrial Sites where past nuclear testing activities and activities that supported nuclear testing may have or are known to have resulted in the release of contaminants into the environment. Industrial Sites at the NNSS have included nuclear facilities that supported the nuclear rocket/missile development programs, gas stations, landfills, spill sites, ordnance sites, and numerous other waste disposal and release sites. The NNSS Industrial Sites activities neared completion at the end of fiscal year 2011 while other activities required under the Federal Facility Agreement and Consent Order (FFACO) and part of the same NNSS ER Project are forecasted to extend to 2027 or beyond. With the majority of Industrial Sites corrective action units (CAUs) completed (more than 250 CAUs and over 1,800 corrective action sites), it was determined that an activity closeout process should be implemented to ensure that the work completed over the past 15 years is well documented in a comprehensive and concise summary. While the process used to close each individual CAU is described in approved documents, no single document describes in summary fashion the work completed to close the many individual Industrial Sites. The activity closeout process will be used to develop an Industrial Sites closeout document that describes these years of work. This document will summarize the number of Industrial Sites closed under the FFACO and provide general descriptions of projects, contaminants removed, and sites closed in place with corresponding Use Restrictions. Other pertinent information related to Industrial Sites work such as the project history, closure decisions, historical declarations, remediation strategies, and final CAU status will be included in the closeout document, along with a table listing each CAU and corresponding corrective action sites within each CAU. Using this process of conducting the activity closeout and developing a closeout document may prove useful for other ER projects within the DOE complex in describing how a long period of ER can be summarized in a single document. The NNSS Industrial Sites activities were completed over the span of 15 years and involved the investigation, cleanup or Use Restriction, and closure of more than 260 CAUs and over 1,800 sites. These activities will conclude in FY 2012 (with the exception of one CAU). In order to capture the work completed over this length of time and document decisions made during the activities, a closeout effort was initiated. The closeout will review the work conducted during the Industrial Sites activities and produce a single document that summarizes Industrial Sites activities. This closeout is being conducted at an interim stage in the overall NNSA/NSO ER Project since the Soils and UGTA activities will continue for a number of years, but the completion of the Industrial Sites project warrants conducting a closeout now while personnel are available and information is still current. The process followed by NNSA/NSO in conducing project closeout for the Industrial Sites portion of the ER program may prove useful within the DOE complex in demonstrating how a large ER project can be summarized. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Closeout Report Francium trapping facility at Triumf

This is a report of the construction of a Francium Trapping Facility (FTF) at the Isotope Separator and Accelerator (ISAC) of TRIUMF in Vancouver, Canada, where the Francium Parity Non Conservation (FrPNC) international collaboration has its home. This facility will be used to study fundamental symmetries with high-resolution atomic spectroscopy. The primary scientific objective of the program is a measurement of the anapole moment of francium in a chain of isotopes by observing the parity violation induced by the weak interaction. The anapole moment of francium and associated signal are expected to be ten times larger than in cesium, the only element in which an anapole moment has been observed. The measurement will provide crucial information for better understanding weak hadronic interactions in the context of Quantum Chromodynamics (QCD). The methodology combines nuclear and particle physics techniques for the production of francium with precision measurements based on laser cooling and trapping and microwave spectroscopy. The program builds on an initial series of atomic spectroscopy measurements of the nuclear structure of francium, based on isotope shifts and hyperfine anomalies, before conducting the anapole moment measurements, these measurements performed during commissioning runs help understand the atomic and nuclear structure of Fr.

07 ISOTOPE AND RADIATION SOURCES↗