Search NASASearch

SEARCH · Search NASA

Results for “Project Lifecycles”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Project Lifecycle Reviews

Explore the source record for details and available documents.

Lifecycle Project Reviews

Full-Scaled Advanced Systems Testbed: Ensuring Success of Adaptive Control Research Through Project Lifecycle Risk Mitigation

The National Aeronautics and Space Administration's Dryden Flight Research Center completed flight testing of adaptive controls research on the Full-Scale Advance Systems Testbed (FAST) in January of 2011. The research addressed technical challenges involved with reducing risk in an increasingly complex and dynamic national airspace. Specific challenges lie with the development of validated, multidisciplinary, integrated aircraft control design tools and techniques to enable safe flight in the presence of adverse conditions such as structural damage, control surface failures, or aerodynamic upsets. The testbed is an F-18 aircraft serving as a full-scale vehicle to test and validate adaptive flight control research and lends a significant confidence to the development, maturation, and acceptance process of incorporating adaptive control laws into follow-on research and the operational environment. The experimental systems integrated into FAST were designed to allow for flexible yet safe flight test evaluation and validation of modern adaptive control technologies and revolve around two major hardware upgrades: the modification of Production Support Flight Control Computers (PSFCC) and integration of two, fourth-generation Airborne Research Test Systems (ARTS). Post-hardware integration verification and validation provided the foundation for safe flight test of Nonlinear Dynamic Inversion and Model Reference Aircraft Control adaptive control law experiments. To ensure success of flight in terms of cost, schedule, and test results, emphasis on risk management was incorporated into early stages of design and flight test planning and continued through the execution of each flight test mission. Specific consideration was made to incorporate safety features within the hardware and software to alleviate user demands as well as into test processes and training to reduce human factor impacts to safe and successful flight test. This paper describes the research configuration, experiment functionality, overall risk mitigation, flight test approach and results, and lessons learned of adaptive controls research of the Full-Scale Advanced Systems Testbed.

Pavlock, Kate M.

Ensuring Success of Adaptive Control Research Through Project Lifecycle Risk Mitigation

Lessons Learne: 1. Design-out unnecessary risk to prevent excessive mitigation management during flight. 2. Consider iterative checkouts to confirm or improve human factor characteristics. 3. Consider the total flight test profile to uncover unanticipated human-algorithm interactions. 4. Consider test card cadence as a metric to assess test readiness. 5. Full-scale flight test is critical to development, maturation, and acceptance of adaptive control laws for operational use.

Pavlock, Kate M.

Advanced Statistical Methods in Spacecraft Flight Software Cost Estimation: Bayesian Regression and Nonlinear Principal Components Analysis to Support System Engineering in the Early Project Lifecycle

This paper provides an overview of the new features and model updates in the upcoming release of the NASA Analogy Software Cost Tool (ASCoT). ASCoT, hosted within the Online NASA Space Estimation Tools (ONSET) on the One NASA Cost Engineering (ONCE) Database, is a web-based tool that provides a suite of estimation tools to support early lifecycle NASA flight software cost analysis. In addition to the traditional parametric flight software costing method COCOMO II, ASCoT contains a Bayesian linear regression to predict total flight software development cost as a function of total spacecraft cost, as well as four analogic methods: k-Nearest Neighbors (kNN) and Clustering models to predict Effort (in work-months) and total source lines of code (SLOC). These methods are designed to work primarily with system-level inputs such as mission type (orbiter, lander, etc.), mission destination (Earth, Inner Planetary, etc.), and the number of instruments and deployables. Nonlinear principal components analysis (NLPCA) is performed to find the principal features of the data composed of both categorical and numerical variables and is necessary prior to defining our analogic methods. Sensitivity analyses and in- and out-of-sample model performance results are presented for the Bayesian CER and the analogic models.

Johnson, James K.

NASA's Software Safety Standard

NASA relies more and more on software to control, monitor, and verify its safety critical systems, facilities and operations. Since the 1960's there has hardly been a spacecraft launched that does not have a computer on board that will provide command and control services. There have been recent incidents where software has played a role in high-profile mission failures and hazardous incidents. For example, the Mars Orbiter, Mars Polar Lander, the DART (Demonstration of Autonomous Rendezvous Technology), and MER (Mars Exploration Rover) Spirit anomalies were all caused or contributed to by software. The Mission Control Centers for the Shuttle, ISS, and unmanned programs are highly dependant on software for data displays, analysis, and mission planning. Despite this growing dependence on software control and monitoring, there has been little to no consistent application of software safety practices and methodology to NASA's projects with safety critical software. Meanwhile, academia and private industry have been stepping forward with procedures and standards for safety critical systems and software, for example Dr. Nancy Leveson's book Safeware: System Safety and Computers. The NASA Software Safety Standard, originally published in 1997, was widely ignored due to its complexity and poor organization. It also focused on concepts rather than definite procedural requirements organized around a software project lifecycle. Led by NASA Headquarters Office of Safety and Mission Assurance, the NASA Software Safety Standard has recently undergone a significant update. This new standard provides the procedures and guidelines for evaluating a project for safety criticality and then lays out the minimum project lifecycle requirements to assure the software is created, operated, and maintained in the safest possible manner. This update of the standard clearly delineates the minimum set of software safety requirements for a project without detailing the implementation for those requirements. This allows the projects leeway to meet these requirements in many forms that best suit a particular project's needs and safety risk. In other words, it tells the project what to do, not how to do it. This update also incorporated advances in the state of the practice of software safety from academia and private industry. It addresses some of the more common issues now facing software developers in the NASA environment such as the use of Commercial-Off-the-Shelf Software (COTS), Modified OTS (MOTS), Government OTS (GOTS), and reused software. A team from across NASA developed the update and it has had both NASA-wide internal reviews by software engineering, quality, safety, and project management. It has also had expert external review. This presentation and paper will discuss the new NASA Software Safety Standard, its organization, and key features. It will start with a brief discussion of some NASA mission failures and incidents that had software as one of their root causes. It will then give a brief overview of the NASA Software Safety Process. This will include an overview of the key personnel responsibilities and functions that must be performed for safety-critical software.

Ramsay, Christopher M.

Future Projections of Lifecycle Cost and Greenhouse Gas Emissions of Light-Duty Vehicles

Vehicles with electrified powertrains carry the promise of significant reductions in greenhouse gas (GHG) emissions from a lifecycle analysis (LCA) standpoint compared to conventional internal combustion engine (CICE) vehicles. However, trade-offs exist between different types of electrified powertrains in terms of cost, consumer acceptance, and GHG reduction efficacy for different operating conditions. The open-source tool CarGHG was developed with an aim to enable the exploration of a plethora of parametric study scenarios, including the cost of electrification technologies, different driving patterns and charging habits, and the cost and carbon intensity of electricity and fuel blends. This paper introduces the framework of CarGHG, then showcases total cost of ownership (TCO) and LCA GHG results for select models of light-duty vehicles. Another capability of CarGHG, which is the ability to estimate the performance of “virtual” vehicle models (perceived vehicle design specifications not yet on the market), is utilized to explore future scenarios of electrification and low-carbon fuel blends for Small Sports Utility Vehicles (SUVs), a popular light-duty vehicle segment in North America. With opportunities, but also uncertainties, in future scenarios, it is likely wise to continue pursuing multiple ways towards the reduction of LCA GHG.

Hamza, Karim

Assuring NASA's Safety and Mission Critical Software

What is IV&V? Independent Verification and Validation (IV&V) is an objective examination of safety and mission critical software processes and products. Independence: 3 Key parameters: Technical Independence; Managerial Independence; Financial Independence. NASA IV&V perspectives: Will the system's software: Do what it is supposed to do?; Not do what it is not supposed to do?; Respond as expected under adverse conditions?. Systems Engineering: Determines if the right system has been built and that it has been built correctly. IV&V Technical Approaches: Aligned with IEEE 1012; Captured in a Catalog of Methods; Spans the full project lifecycle. IV&V Assurance Strategy: The IV&V Project's strategy for providing mission assurance; Assurance Strategy is driven by the specific needs of an individual project; Implemented via an Assurance Design; Communicated via Assurance Statements.

Validation

Nov. 2024 EVs@Scale High-Power Charging Deep Dive Technical Meeting

EVs@Scale Lab Consortium is addressing challenges, developing solutions, and enabling technologies for transportation electrification ecosystem. The consortium has five research pillars one of which focuses on high power charging (HPC). HPC pillar brings together hardware and software expertise, capabilities, and facilities related to high power EV charging, charge management, and grid integration. Deep-dive technical meetings are organized twice a year and provides an opportunity for more industry engagement and technical feedback for the national labs throughout the project lifecycle. High-Power Charging pillar has two active projects: (i) Next-Gen Profiles (NGP) and (ii) High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP). This presentation summarizes the progress made in both projects during the past six months focusing on specific topics. There will be two deep-dive technical meetings twice a year. Every deep-dive meeting will focus on different aspects of the project progress.

ADVANCED PROPULSION SYSTEMS,DIRECT ENERGY CONVERSI

LAMP Project Facility and Space Requirements

The project will require significant space over the lifetime of the project to successfully execute design, technology maturation, component testing and verification, and final removal and installation. The types of space required falls into three general categories: office, storage, and laboratory. Figure 1 below summarizes the project space requirements by project lifecycle. The specific color coding indicates the availability (and potential risk to the project) of the particular type of space: green indicates space that is already allocated and in use by the LAMP project; yellow indicates space that is expected to be easily transitioned from its current use to the project; red indicates a space that is use by multiple users or other projects, and will most likely require high-level negotiations and planning to become available to the project. Figure 2 summarizes the LAMP Space Requirements by calendar year and type throughout the duration of the project. As can be seen in Fig. 2, the maximum space needed by the project exceeds 40,000 square feet, with an average space requirement over the lifetime of the project equal to approximately 25,000 square feet.

43 PARTICLE ACCELERATORS

Integrated Concurrent Engineering Teams for Increased Efficiency in Flight Projects

A highly integrated Concurrent Engineering Team (CET) within a flight project evolves in its function and has the potential to provide many benefits through the project lifecycle. The benefits include superior systems-oriented design products, as well as overall improved project efficiency and higher-performing interpersonal relationships within the project. If physically integrated, this can manifest as a Concurrent Engineering Center (CEC) centrally located within a project’s physical office space. Here we discuss the process to establish and maintain a tightly integrated engineering and design team for providing highly streamlined service to the project, including a cost/benefits analysis discussion.

Flight Project

Integrated Concurrent Engineering Teams for Increased Efficiency in Flight Projects

A highly integrated Concurrent Engineering Team (CET) within a flight project evolves in its function and has the potential to provide many benefits through the project lifecycle. The benefits include superior systems-oriented design products, as well as overall improved project efficiency and higher-performing interpersonal relationships within the project. If physically integrated, this can manifest as a Concurrent Engineering Center (CEC) centrally located within a project’s physical office space. Here we discuss the process to establish and maintain a tightly integrated engineering and design team for providing highly streamlined service to the project, including a cost/benefits analysis discussion.

Flight Project

SCDM in a Distributed Environment

The Software Configuration Management (SCM) of the Space Launch Initiative (SLI) Advanced Engineering Environment (AEE) products is performed in a distributed environment-meaning the activities performed during the project lifecycle are across numerous NASA Centers, facilities, organizations, colleges and industry. SCM is the glue that holds the project and products together-especially in a distributed environment. It identifies, controls, accounts, and verified the details of the products; the schedule of activities; the assigned responsibilities; and the required resources, including staff, tools, and computer facilities. Data/document management (DM) captures and conveys the SCM and project efforts. SCM and DM are integrally linked; hence, Software Configuration and Data Management (SCDM). This paper discusses one team's challenges in implementing SCDM in a distributed environment. The distributed nature of the project introduces new opportunities for moving SCDM to the next level of usefulness in today's high-tech development arena. The lessons learned from the implementation of distributed SCDM in support of the SLI AEE Project provide valuable information for future implementations of SCM and DM.

Crowley, Sandra L.

Preservation of Provenance and Context to Ensure Future Understandability of Airborne Earth Observations and Derived Data Products

Open-source science goes beyond making data from scientific projects (e.g., on-orbit/satellite missions, airborne and field investigations, and other data producing activities) openly available after they are generated, but involves and open sharing of information throughout the project lifecycle. Preservation of the data and associated information required for understanding and reusing the data well after the scientific projects is a contributor to open-source science as well. Considering the high investment in the on-orbit/satellite missions, we had developed a document titled “NASA Earth Science Data Preservation Content Specification (PCS)” in 2011. This document has been used as a requirement for recent on-orbit/satellite missions by NASA. Recently it became clear that the specifications should be applied to other scientific projects as well. Therefore, the document was revised to cover other types of projects, and a Preservation Content Implementation Guidance (PCIG) document was also developed. The revised PCS, and the PCIG, were published in 2022. The purpose of this presentation is to highlight the contents of these documents as they apply to suborbital/airborne investigations. The PCS calls for content preservation in eight general categories - Measuring Instrument/Platform Description, Instrument and Science Data Products and Metadata, Science Raw Data, Product and Algorithm Documentation, Instrument Calibration, Science Algorithm Software, Science Data Product Algorithm Inputs, Science Data Product Validation, and Science Data Access and Analysis Tools. While all these categories apply to various types of projects, a few clarifying sentences have been added to the descriptions of contents in each of the categories to show which categories are especially important to airborne and field investigations and where some contents are not applicable (or difficult to obtain). The PCIG document provides some general guidance applicable to all types of projects and specific guidance in a separate section for airborne and field investigations. This section calls out typical artifacts produced during such investigations that can meet the spirit of the various PCS categories.

remote sensing

X-Plane Knowledge Capture Workshop Summary Report

The history of experimental aircraft research and development at the National Aeronautics and Space Administration (NASA) provides a large body of work for current and future team members to learn from and apply. NASA values the knowledge it gains from all the research it performs and desires to have that knowledge grow with each new project, incrementally adding to the collective knowledge base. To support this knowledge growth and sharing, in May 2019, NASA convened over 60 engineers; researchers; and other personnel (internal and external to NASA) for the X-plane1 Knowledge Capture Workshop to discuss their over 50-years’ worth of experiences in developing, operating, and managing experimental aircraft. Over the course of a two-day workshop, the group not only focused, primarily, on current X-plane development but also discussed a wide range of topics about experimental aircraft and flight research. In addition to the discussions, senior NASA aeronautics leaders shared their personal lessons learned with the workshop audience. Broadly, these discussions centered around the topics of organizational and cultural practices, the project lifecycle, flight, and risk and safety. Many of the observations offered by participants are applicable to other NASA team-based projects, demonstrating the value in sharing lessons learned and best practices across projects regardless of their research focus. To share the most valuable lessons learned as broadly as possible, a summary of these discussions has been compiled into the following report. These discussions are mostly included in their entirety, with some light editing for clarity and privacy. NASA is sharing this knowledge internally and making it available to the public in hopes that others can learn from the experimental aircraft challenges and successes at NASA. Note: this document represents the perspectives, experiences, and opinions of others but does not necessarily represent the official view of NASA.

Steven R Hirshorn

Carbon storage cost modeling for the offshore Gulf of America

At the 2025 Annual University of Houston ROICE Workshop, Dr. Chung Shih delivered an invited talk titled "Carbon Storage Cost Modeling for the Offshore Gulf of America." This presentation highlighted the capabilities of NETL's offshore saline carbon storage cost model (CO2_S_COM_Offshore) in evaluating the economics of both new and reused storage infrastructure. While primarily intended for screening-level analysis, the model comprehensively considers critical components such as onshore facilities, pipelines connecting shore to offshore platforms, main platforms, and satellite platforms. Additionally, its integrated cashflow model encompasses the entire project lifecycle, from initial site screening to post-injection site care, providing users with a thorough understanding of how various operational or financial parameters impact project economics.

cost modeling