Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Guidelines for Project Management

Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

Ben-Arieh, David↗

Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing a project's legacy: implications for organizations and project management

Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

risk management↗

Managing Projects with KPRO

How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

Braden, Barry M.↗

ARPA-E: Actively Managing Projects to Accelerate Impact

The ARPA-E model is unique in that the agency does not just provide teams funding. Throughout the lifetime of an ARPA-E award, ARPA-E Program Directors and Tech-to-Market Advisors also provide teams with expert advice through quarterly reviews and onsite visits. This hands-on approach helps ensure teams can meet ambitious milestones, target and tackle problems early on, and advance their technologies towards commercialization. Program Director Dr. Isik Kizilyalli explains the importance of this active project management approach in helping teams identify and overcome barriers. In this video, Energy Storage Systems (ESS) from the GRIDS program and Monolith Semiconductors from the SWITCHES program discuss how ARPA-E’s active project management approach helped them find solutions to technical challenges.

25 ENERGY STORAGE↗

Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

Hoffman, Edward J.↗

The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

Mulenburg, Gerald M.↗

How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

Mulenburg, Gerald M.↗

The Project Manager's Tool Kit

Project managers are rarely described as being funny. Moreover, a good sense of humor rarely seems to be one of the deciding factors in choosing someone to be a project manager, or something that pops up as a major discussion point at an annual performance review. Perhaps this is because people think you aren't serious about your work if you laugh. I disagree with this assessment, but that's not really my point. As I talk to people either pursuing a career in project management, or broadening their assignment to include project management, I encourage them to consider what tools they need to be successful. I suggest that they consider any strength they have to be part of their Project Management (PM) Tool Kit, and being funny could be one of the tools they need.

Cameron, W. Scott↗

The integrated scheduling system: A case study in project management

A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

Bishop, Peter C.↗

Adapting Project Management Practices to Research-Based Projects

From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

Bahr, P.↗

A Practical Application of Integrated Systems Engineering and Project Management on a Complex EPC Project - 17207

This paper introduces how an integrated set of Systems Engineering (SE) and Project Management (PM) processes were applied in a practical way, to address the challenges on a complex, highly technical, Engineering Procurement Construction project within the nuclear field. This approach was inspired by: - the principles contained in a Community of Practice on Lean in Program Management jointly established in May 2012 by MIT, PMI and INCOSE; - an opportunity to apply international standard ISO/IEC 15288:2008(E) Systems and software engineering - System life cycle processes on a real-life situation; - and the belief that there is great value in applying Systems Engineering and Project Management in an integrated manner on a project. The project offering this opportunity was the Detail Engineering, Procurement, Construction and Cold Commissioning (EPC) of the Silo Direct-encapsulation Plant (SDP). This project was undertaken by the Joint Venture (JV) formed by Areva, Mace and Atkins (a.m.a. Nuclear Ltd). Unfortunately, early termination of the project, at a stage when only a part of the processes and tools were being implemented, did not allow this integrated approach to be demonstrated in full. However, the benefits achieved in the early stages in aligning and forming an integrated project execution team, showed potential for great benefits. This paper covers an introductory analysis of the situation, the successes and benefits achieved from implementing an integrated SE - PM approach up to the stage when the project was terminated, and possible path forward had the project continued. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗