Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ARPA-E: Actively Managing Projects to Accelerate Impact

The ARPA-E model is unique in that the agency does not just provide teams funding. Throughout the lifetime of an ARPA-E award, ARPA-E Program Directors and Tech-to-Market Advisors also provide teams with expert advice through quarterly reviews and onsite visits. This hands-on approach helps ensure teams can meet ambitious milestones, target and tackle problems early on, and advance their technologies towards commercialization. Program Director Dr. Isik Kizilyalli explains the importance of this active project management approach in helping teams identify and overcome barriers. In this video, Energy Storage Systems (ESS) from the GRIDS program and Monolith Semiconductors from the SWITCHES program discuss how ARPA-E’s active project management approach helped them find solutions to technical challenges.

25 ENERGY STORAGE↗

A Practical Application of Integrated Systems Engineering and Project Management on a Complex EPC Project - 17207

This paper introduces how an integrated set of Systems Engineering (SE) and Project Management (PM) processes were applied in a practical way, to address the challenges on a complex, highly technical, Engineering Procurement Construction project within the nuclear field. This approach was inspired by: - the principles contained in a Community of Practice on Lean in Program Management jointly established in May 2012 by MIT, PMI and INCOSE; - an opportunity to apply international standard ISO/IEC 15288:2008(E) Systems and software engineering - System life cycle processes on a real-life situation; - and the belief that there is great value in applying Systems Engineering and Project Management in an integrated manner on a project. The project offering this opportunity was the Detail Engineering, Procurement, Construction and Cold Commissioning (EPC) of the Silo Direct-encapsulation Plant (SDP). This project was undertaken by the Joint Venture (JV) formed by Areva, Mace and Atkins (a.m.a. Nuclear Ltd). Unfortunately, early termination of the project, at a stage when only a part of the processes and tools were being implemented, did not allow this integrated approach to be demonstrated in full. However, the benefits achieved in the early stages in aligning and forming an integrated project execution team, showed potential for great benefits. This paper covers an introductory analysis of the situation, the successes and benefits achieved from implementing an integrated SE - PM approach up to the stage when the project was terminated, and possible path forward had the project continued. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cigeo Design Options, Risks and Opportunities Management: A Continuous Project Management Goal - 20015

Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo, the French HLW and IL-LLW Deep Geological Repository. If licensed in the coming years, Cigeo's progressive construction, industrial operation and closure will last over more than a century. Such a duration, associated with the requirements in terms of reversibility, lead to the choice of an incremental design that allows, for next operator generations, to integrate improvements derived from scientific and technical progress as well as from experience feedback from its operation. This incremental design approach, associated with a permanent risks and opportunities management process, will continue after licensing of Cigeo as a tool for the governance of the reversibility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RESolution Project Management Tool

The Resolution Project Management Tool is designed to provide a light, yet comprehensive, application to facilitate the management of scientific and research and development projects. The approach to the tool is minimalistic in nature; only require the minimum, essential information needed to facilitate the management of a project and display it in a simple, noncomplex format. The simple platform provides for the collaborative identification, monitoring and status of the essential elements of a project: scope, schedule, cost, risks, changes and reporting. Additionally, the tool provides the ability to create and monitor portfolios of projects without complex or over-burdensome user interfaces or data requirements. The novelty of the tool is the unique selectivity of the data required to manage a project combined with the simple and clear user interface.

Capps, Greg↗

Project Management, Including Data Management Best Practices Framework (Best Management Practice; Work Product 12.3.b)

The Project Management documentation includes: (1) background on the RCSP Initiative and its best practices development process; (2) a historical perspective of best practices for project management; (3) a comparison of the roles of project managers, functional managers, and operations managers; (4) an overview of project management practices for field activities; and discussions of (5) managing change, (6) managing data, and (7) managing knowledge and information.

01 COAL, LIGNITE, AND PEAT↗

Carbon Management Projects (CONNECT) Database and Explorer

Overview The Carbon Management Projects (CONNECT) Toolkit is an online exploratory visualization tool developed by the U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM) with support from other federal agencies such as the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Transportation (DOT). It provides a single point of access to authoritative information on federal agency investment in a portfolio of research, development, and demonstration (RD&D) projects that have been publicly announced to advance technologies for point source carbon capture, carbon dioxide removal, transport, storage, and conversion, collectively referred to as carbon management. The RD&D programs covered in this tool are authorized by annual congressional appropriations ("Base Program") and the 2021 Infrastructure Investment and Jobs Act (IIJA). The tool also incorporates public information on other federal initiatives, such as the Regional Clean Hydrogen Hubs, and public information released by other government agencies, such as the Environmental Protection Agency's (EPA) and Primacy States’ Underground Injection Control Class VI permits and EPA’s facility level greenhouse gas (GHG) emissions. Developed in a geographic information system, the tool organizes carbon management projects into five groups based on the primary technology that a project aims to advance, each visually represented as a digital layer ("carbon management project layer"). Only federally funded projects are included, which can be awarded projects that are completed or ongoing, or projects that have been selected but are currently under negotiation. Project information can be viewed in the map or in the attribute table below it when turned on. In the map view, each project is displayed at either its host site (for field work), where available, or its performer site (project lead's location, further explained in the table below). Host sites and performer sites are represented in distinct icons. Several reference layers offer additional public information on infrastructural and natural resource environment for carbon management. These reference layers, combined with multiple geographical basemaps, enable users to visualize the carbon management project layers in context. Carbon management project information will be updated monthly based on feedback and information availability. Carbon management project layers Point Source Carbon Capture (PSC) This layer contains DOE-funded projects focused on capturing carbon dioxide (CO2) from power plants or industrial facilities. Carbon Dioxide Removal (CDR) This layer contains DOE-funded projects focused on capturing CO2 from the atmosphere, including direct air capture (DAC) and DAC hubs, direct ocean capture, enhanced mineralization, and biomass carbon removal and storage. For projects with multiple host sites, each of the sites are displayed individually with the project cost and cost sharing information representing the total for the entire project. Carbon Transport This layer contains DOE- and DOT-funded projects focused on CO2 transport. The Transport Research and Development sublayer contains projects that do not involve physical infrastructure; the Proposed Transport Corridor sublayer contains projects for which either a route for the transport infrastructure has been proposed or a general area for the transport infrastructure has been identified. Carbon Storage This layer contains DOE-funded key projects focused on CO2 storage. For projects with multiple field-work sites, each of the sites are displayed individually on the map with the project cost and cost sharing information representing the overall total for the entire project. Carbon Conversion This layer contains DOE-funded projects focused on converting CO2 into economically valuable products. Reference layers The following layers provide additional information in the geographic proximity of carbon management projects. Users should reference the original sources for more details (weblinks provided below and in pop-up windows on the map). Regional Clean Hydrogen Hub and Facility These layers illustrate the approximate areas of the Regional Clean Hydrogen Hubs announced by DOE's Office of Clean Energy Demonstrations (OCED) and the approximate locations of individual facilities that constitute the hubs (see "Where are the H2Hubs located?" on the webpage linked above). EPA Facility Level GHG Emissions (direct emitter) This layer shows direct CO2 emissions from stationary sources in 2022, using data extracted from EPA's Facility Level Information on GreenHouse gases Tool (FLIGHT). Captured and injected CO2 are not deducted from direct emitters’ total emissions. Contact EPA for additional details. Underground Injection Control Class VI permit/permit application This layer shows the locations of CO2 injection wells that are granted or in the process of applying for an Underground Injection Control Class VI permit by EPA or a Primacy State (currently Louisiana, North Dakota, and Wyoming). The URLs for the permits or permit applications are provided in the pop-up windows associated with the well locations. Contact EPA for additional details. Carbon Storage Resource This layer contains information on prospective CO2 storage resources in saline formations and oil and gas reservoirs provided by the National Carbon Sequestration Database and Geographic Information System (NATCARB) spatial database. Contact NETL for additional details. Existing CO2 pipeline This layer shows active CO2 pipelines based on information digitized from the map issued by the Pipeline and Hazardous Materials Safety Administration (PHMSA). Contact PHMSA for additional details.

Carbon Conversion↗

Study on Evaluation of Project Management Data for Decommissioning of Uranium Refining and Conversion Plant - 12234

Some of nuclear facilities that would no longer be required have been decommissioned in JAEA (Japan Atomic Energy Agency). A lot of nuclear facilities have to be decommissioned in JAEA in near future. To implement decommissioning of nuclear facilities, it was important to make a rational decommissioning plan. Therefore, project management data evaluation system for dismantling activities (PRODIA code) has been developed, and will be useful for making a detailed decommissioning plan for an object facility. Dismantling of dry conversion facility in the uranium refining and conversion plant (URCP) at Ningyo-toge began in 2008. During dismantling activities, project management data such as manpower and amount of waste generation have been collected. Such collected project management data has been evaluated and used to establish a calculation formula to calculate manpower for dismantling equipment of chemical process and calculate manpower for using a green house (GH) which was a temporary structure for preventing the spread of contaminants during dismantling. In the calculation formula to calculate project management data related to dismantling of equipment, the relation of dismantling manpower to each piece of equipment was evaluated. Furthermore, the relation of dismantling manpower to each chemical process was evaluated. The results showed promise for evaluating dismantling manpower with respect to each chemical process. In the calculation formula to calculate project management data related to use of the GH, relations of GH installation manpower and removal manpower to GH footprint were evaluated. Furthermore, the calculation formula for secondary waste generation was established. In this study, project management data related to dismantling of equipment and use of the GH were evaluated and analyzed. The project management data, manpower for dismantling of equipment, manpower for installation and removal of GH, and secondary waste generation from GH were considered. Establishment of the calculation formula for dismantling of each kind of equipment makes it possible to evaluate manpower for dismantling the whole facility. However, it is not easy to prepare calculation formula for all kinds of equipment that exist in the facility. Therefore, a simpler evaluation method was considered to calculate manpower based on facility characteristics. The results showed promise for evaluating dismantling manpower with respect to each chemical process. For dismantling of contaminated equipment, a GH has been used for protection of the spread of contamination. The use of a GH increases manpower for installation and removal of GH etc. Moreover, structural materials of the GH such as plastic sheets, adhesive tape become a burnable secondary waste. To create an effective dismantling plan, it is necessary to carefully consider use of a GH preliminarily. Thus, an evaluation method of project management data such as manpower and secondary waste generation was considered. The results showed promise for evaluating project management data of GH by using established calculation formula. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Update on Service Management Project

GS and IT Service Management project status meeting - Distribution: Sigurd Lettow, Frederic Hemmer, Thomas Pettersson, David Foster, Matti Tiirakari, GS⁢ Service Providers When and where: Thursday 2nd September at 10:00-11:30 in IFiltration Plant (222-R-001) Dear All, We would like to inform you about progress made on different topics like the Service Catalogue, the new Service Management Tool and the Service Desk. We would also like to present the plan for when we hope to go live and what this will mean for all of you running and providing services today. We will need your active support and help in the coming months to make this happen. GS⁢ Service Management Teams Reinoud Martens, Mats Moller

CERN↗

Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using sophisticated scientific modeling optimized the 100-HX's approximately 0.7 square mile (181 hecto-meters) extraction and injection well field to support continuous operation of a maximum of 800 gallons (3,028 liters) per minute, 24 hours per day, and 7 days per week. The use of traditional resin technology for the plant's ion exchange system required a change out of the resin every 12 weeks and shipment to an offsite facility 1,500 miles (2,414 kilometers) away for regeneration. Instead, the project leadership pursued newer technology with a disposable resin that could be disposed of on-site and would require less frequent change outs, reducing the project's life cycle costs by more than $16 million. Constructing the facility had its own challenges. The well field location overlapped ecologically sensitive lands where bald eagles and native wildlife use the land for their mating habitat for nearly half of the year. Building locations had to be planned around historically and culturally sensitive areas, and around another contractor's remediation work zones. Also, the size of the well field required a transfer (pumping) facility and installation of more than 60 miles (97 kilometers) of high-density polypropylene pipe, 23 miles (38 kilometers) of power cable, and 28 miles (46 kilometers) of control cable. Along with schedule and budget constraints typical of any fast-track project, the project team dealt with severe resource constraints due to competing projects across the Hanford Site caused by the influx of American Recovery and Reinvestment Act stimulus funding. In addition, the project team itself was stretched between completing another $25 million dollar construction project while designing and constructing this project. In order to save money, the project schedule was compressed by three months from the original baseline schedule. This was made possible by the strong use of project management principles throughout the design, construction, and testing phases, as well as implementation of many lessons learned from a similar construction project. In summary, the 100-HX Project truly was a unique blend of science, technology, construction and project management. In summary, Hanford's 100-HX Pump and Treat Project was a successful blend of science, technology, construction, and project management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CONNECT Toolkit: Carbon Management Projects Database and Explorer

The Carbon Management Projects (CONNECT) Toolkit (exploratory visualization tool and database), developed by U.S. Department of Energy’s (DOE) Office of Fossil Energy and Carbon Management (FECM), aims to provide a one-stop access to authoritative information on a portfolio of federal research, development, and demonstration RD&D projects that have been publicly announced to advance carbon management technologies.

Sharma, Maneesh↗

A New Tool for Effective and Efficient Project Management

Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

99 GENERAL AND MISCELLANEOUS↗

Starting up an Enterprise-Wide Project Management Office

An enterprise-wide Project Management Office (PMO) can be successfully launched and institutionalized using effective organization strategies, methods, and techniques. This paper provides a step-by-step process for starting up an enterprise-wide PMO using proven techniques to ensure that the new organization receives executive management support and aligns with the larger enterprise’s business strategies and objectives. This paper discusses different types of PMOs that are appropriate, depending upon an organization’s structure and business objectives. This paper further provides the reader with an understanding of how to deal with start-up and implementation challenges that are common in multi-business unit organizations; how to launch PMO programs and services and gain stakeholder acceptance; how to monitor, measure, and report PMO implementation progress and effectivenss; and how to apply accepted management assurance and oversight methodologies to verify and validate the effectiveness of developed processes and programs and continuously improve both the processes and implementation.

Andrews, Thomas D.↗

Waste management project's alternatives: A risk-based multi-criteria assessment (RBMCA) approach

Highlights: Black-Right-Pointing-Pointer We examine the evaluation of a waste management project's alternatives. Black-Right-Pointing-Pointer We present a novel risk-based multi-criteria assessment (RBMCA) approach. Black-Right-Pointing-Pointer In the RBMCA the evaluation criteria are based on the quantitative risk analysis of the project's alternatives. Black-Right-Pointing-Pointer Correlation between the criteria weight values and the decision makers' risk preferences is examined. Black-Right-Pointing-Pointer Preference to the multi-criteria against the one-criterion evaluation process is discussed. - Abstract: This paper examines the evaluation of a waste management project's alternatives through a quantitative risk analysis. Cost benefit analysis is a widely used method, in which the investments are mainly assessed through the calculation of their evaluation indicators, namely benefit/cost (B/C) ratios, as well as the quantification of their financial, technical, environmental and social risks. Herein, a novel approach in the form of risk-based multi-criteria assessment (RBMCA) is introduced, which can be used by decision makers, in order to select the optimum alternative of a waste management project. Specifically, decision makers use multiple criteria, which are based on the cumulative probability distribution functions of the alternatives' B/C ratios. The RBMCA system is used for the evaluation of a waste incineration project's alternatives, where the correlation between the criteria weight values and the decision makers' risk preferences is analyzed and useful conclusions are discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multifamily Retrofit Project Manager Job/Task Analysis and Report: September 2013

The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Retrofit Project Manager JTA identifies and catalogs all of the tasks performed by multifamily retrofit project managers, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗