Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

DEVELOPMENT AND APPLICATION OF RISK ANALYSIS TOOLKIT FOR PLANT RESOURCE OPTIMIZATION

This paper presents the development of methods and tools that are being designed to optimize plant operations (e.g., maintenance/replacement schedules and optimal maintenance postures for plant components) in a manner that is more cost effective than current approaches and makes better use of available component health and cost data. These methods include both data- and model-based optimization methods. Model-based optimization methods directly include reliability and cost models to determine an optimal plant operational strategy. We consider gradient-based and evolutionary (based on genetic algorithms) optimization methods. The second class of methods target more specific use cases (e.g., project schedule optimization) and are not based on reliability models directly, but they require specific component reliability and cost data. This class of methods is based on variants of the knapsack problem with an aim to determine an optimal project schedule that maximizes the overall NPV. This paper also presents multi-objective methods designed to identify an optimal maintenance posture based on a Pareto frontier analysis. Rather than dictating the “right” tradeoff (i.e., identify the absolute best posture), we show how it is possible to perform a trade space exploration approach (i.e., identify value and costs of several postures and let the analysis account for desired value and cost metrics). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space. For all these methods we present detailed applicative examples that show their validity from a decision-making perspective.

97 - MATHEMATICS AND COMPUTING↗

Development of High Temperature (>700°C) Molten Salt Pump Technology for Generation 3 Solar Power Tower Systems

Bearings are required for long-shafted pumps historically used in concentrating solar thermal power applications. For molten chloride salts, bearings for such service conditions are not commercially available, nor has a design been demonstrated to work. Therefore, a project was sponsored by the Department of Energy’s Solar Energy Technologies Office for the development and demonstration of a submerged bearing for use in chloride salt pumps. This project’s tasks covered the tribological testing of candidate materials and the design, fabrication, testing, and post-test analysis of full-scale salt-compatible bearings. This work expands upon previous work. The effects of potential particulate in the salt were investigated through tribological bench testing. Through 11 tests, the MgO particulate size and concentration in a molten chloride salt were varied, and the effects on friction, wear rate, and wear characteristics were recorded. Novel journal bearings for chloride salt service were designed and fabricated based on these results. The bearings were of a relevant scale (i.e., for a 1.5 in. pump shaft) to demonstrate the technology with respect to further scale-up. The bearings were made of Haynes 244 and Yttria Partially Stabilized Zirconia. A custom bearing test rig, salt tanks, and associated infrastructure (e.g., heaters, tanks, transfer lines, gas flow control) were designed, procured, and installed. A few issues were encountered in the system fabrication process, resulting in delay of the project schedule. The system was successfully fabricated and assembled. Heating, cover gas, and pump motor systems were integrated into the control logic. This progress of the bearing test system represents a significant step forward towards demonstrating this promising technology. Nevertheless, the project ended before testing of the full-scale bearings could be performed.

14 SOLAR ENERGY↗

Sample Preparation Laboratory (SPL) Best Practices: CGD as the Primary Acceptance Method

The traditional paradigm applied to the construction of nuclear safety related systems, structures, and components (SSCs), like SPL, involves an owner/licensee hiring an EPC firm with an NQA 1 program to manage the engineering, procurement, and construction of the desired SSC. This traditional approach would have posed significant barriers to the successful completion of the SPL. As a smaller capital project, in the $\$$100–$\$$200 million range, there was concern that employing one of the larger EPC companies would escalate costs and extend the projected schedule beyond what would be feasible for the Department of Energy (DOE). The traditional acceptance method employed for nuclear facilities with credited safety functions requires the use of an EPC firm applying American Society of Mechanical Engineers (ASME) NQA 1 nuclear quality assurance (NQA) to accept safety SSCs. In lieu of this approach, INL elected to apply its own NQA 1 program to hire an EPC firm operating a commercial quality program. This method used commercial grade dedication (CGD) as outlined in NQA 1 which had not been applied at this scale. Use of the commercial supply chain was identified as a key factor to the successful completion of SPL. Favorable conditions enabling the use of CGD included: • INL serving as both the designer and the design authority • Design created by an NQA 1 qualified source • A mature CGD program • Availability of a CGD subject matter expert (SME) • A strong construction management program. This white paper elaborates on the methodology employed in the construction of the SPL, the successes achieved, and best practices implemented.

42 - ENGINEERING↗

MARVEL Technical Overview: Breakdown of cost and scope growth through 90% Final Design

This report presents a breakdown of cost and scope growth for the Microreactor Applications Research Validation and Evaluation (MARVEL) project through the design phase, and includes observations, lessons learned, and the results from an independent project assessment. It presents the status and history of the project. Technology maturity is considered in high-level, qualitative comparison to other microreactor design efforts. Its purpose is to record MARVEL’s evolution and lessons learned from the planning and design phases through completion of 90% final design. Analyses included a detailed review of project cost, schedule, and periodic project reports and management documents. The Primary Coolant Apparatus Test (PCAT) is specifically highlighted. It was concluded that MARVEL would have benefited from more extensive planning early in the project to better define cost and schedule to provide more certainty in the total project cost and delivery date. Modest cost and schedule improvements may have been possible, but compared qualitatively, MARVEL’s total cost and schedule performance are consistent with that of other efforts currently underway. Better planning would have provided more certainty, improved risk mitigations, and potentially eliminated delays due to funding shortfalls. A recommended path forward is presented that addresses recommendations in the independent project assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

INTEGRATION OF DATA ANALYTICS WITH SYSTEM HEALTH PROGRAMS

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry developed and regulatory programs. However, these programs have proven to be labor intensive and expensive. There is an opportunity to significantly enhance the collection, analysis, and use of this information to provide more cost-effective plant operation. Additionally, there is an acute industry need to leverage advanced technology to reduce costs and improve operational effectiveness. The goal of this paper is to provide effective and efficient analytical methods and tools to support risk-informed decisions for the equipment reliability and asset management programs at nuclear power plants. This is accomplished by creating a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). Here we are supporting typical system engineer decisions regarding maintenance activity scheduling and component ageing management. This is performed in a risk-informed context where herein the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow. A challenge is that the structure of this workflow strongly depends on the decision that needs to be made, the type of data available, and the constraints that need to be considered. Current methods are designed to provide specific answers to specific problems; however, these methods might prove to be inadequate even when problem settings slightly change (e.g., different types of requirements, additional dependencies between system reliability and economics). We tackled this challenge by designing framework in a flexible and modular fashion such that the user can assemble and customize his/her own workflow that integrates SSC economic lifecycle models (e.g., maintenance and replacement costs), system reliability models, and optimization methods.

97 - MATHEMATICS AND COMPUTING↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

CRiSPPy: An advanced hydropower scheduling tool for the Colorado River Storage Project

The Western Area Power Administration (WAPA) plays a vital role in delivering reliable and cost-effective hydroelectric power to millions of customers across the western United States. The Colorado River Storage Project (CRSP) carries out WAPA’s mission in Arizona, Utah, Colorado, New Mexico, Nevada, Wyoming and Texas. Achieving this mission requires effective management of the Colorado River system, and depends on the use of advanced analytical tools and modeling methodologies. For many years, CRSP has relied on the Generation and Transmission Maximization Superlite (GTMax SL) model for its mid-term and long-term hydroscheduling needs. However, the evolving energy market, power system operations, environmental rules, and hydrology conditions, coupled with advancements in computational capabilities, have necessitated the development of a more modern and robust solution. This report introduces the Colorado River Storage Project Python-based (CRiSPPy) model, a new, advanced hydropower scheduling tool developed to address CRSP ever-evolving challenges. CRiSPPy represents a significant leap forward in our ability to model and optimize the operation of the Colorado River system. It incorporates state-of-the-art optimization algorithms, enhanced data management capabilities, and an advanced graphical user interface, providing WAPA CRSP personnel with unprecedented insights and decision-making support. This document details the development, capabilities, and implementation of CRiSPPy. It is intended to serve as a comprehensive resource for WAPA staff, stakeholders, and anyone interested in the future of hydropower scheduling in the Colorado River Basin. We are confident that CRiSPPy will enhance WAPA's mission while adapting to the challenges of a dynamic and increasingly complex environment. The version of CRiSPPy described in this report is the version 2.3. New versions of CRiSPPy will be developed as the tool keeps evolving to address CRSP challenges.

13 HYDRO ENERGY↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Flow Forecasting on New England’s Great River Hydro (CRADA 549) (Final Report)

Great River Hydro (GRH) is New England's largest conventional hydropower generator and operates sustainable hydropower systems in Vermont, New Hampshire, and Massachusetts. Several of GRH’s hydropower projects on the Connecticut River are largely constrained to operate as run-of-river; however, though a new FERC license they have opportunity in the form of flex hours where they are allowed to deviate operations to capture favorable market conditions or emergency operations. To maximize value from these new operations, GRH is considering new sources of forecasted inflow. Pacific Northwest National Laboratory (PNNL) is evaluating the quality of two commercial inflow forecasts for GRH under DOE Water Power Technology Office’s Notice of Opportunity for Technical Assistance: Improving Hydropower’s Value through Informed Decision Making. This project will provide an unbiased evaluation of the accuracy of inflow forecasts available through commercial vendors. GRH will use this information to support their decision on which inflow forecast to use under their new FERC license and to assess the overall value of the available inflow forecasting tools and practices. In this talk we will discuss details of the near real-time forecast evaluation process, the metrics involved in the evaluation, and some preliminary results. In addition, we’ll touch on the second phase of the project which involves evaluating scheduling strategies that identify windows of opportunity to change operations in ways that increase profit through participation in day ahead and real time markets.

13 HYDRO ENERGY↗

Fuel Salt Synthesis for the Molten Chloride Reactor Experiment: Scale-up, Operations, and Production Update

Over the previous 5 years, Idaho National Laboratory (INL) has been working with Southern Co. and TerraPower on the Advanced Reactor Demonstration Program (ARDP) funded Molten Chloride Reactor Experiment (MCRE) project. As part of this effort, INL has developed a fuel synthesis process to produce the NaCl-UCl3 fuel salt that MCRE will need for operation. Dr. Phillips will present on process development and scale-up testing and results, as well as provide an update on the current status of fuel production for MCRE. To date, the fuel synthesis process has been demonstrated at full scale using depleted uranium, and the equipment necessary for production of the fuel for MCRE has been installed in the Fuel Manufacturing Facility (FMF) at the INL’s Materials and Fuels Complex (MFC). The NaCl-UCl3 produced to-date has been shown to be of 99.99% purity or greater, and be within tolerance for all relevant parameters. Overall process efficiency in terms of uranium utilization has been demonstrated to be above 90%. The synthesis operation has also been shortened to allow for completion of the reaction within a single 10 hour working shift. Consequently, the process developed is expected to be capable of meeting all project objectives for efficiency, purity, scale, and scheduling. Production of NaCl-UCl3 fuel salt for MCRE is projected to begin during the Summer of 2025.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Design of the ECCE detector for the Electron Ion Collider

The EIC Comprehensive Chromodynamics Experiment (ECCE) detector has been designed to address the full scope of the proposed Electron Ion Collider (EIC) physics program as presented by the National Academy of Science and provide a deeper understanding of the quark-gluon structure of matter. To accomplish this, the ECCE detector offers nearly acceptance and energy coverage along with excellent tracking and particle identification. The ECCE detector was designed to be built within the budget envelope set out by the EIC project while simultaneously managing cost and schedule risks. Finally, this detector concept has been selected to be the basis for the EIC project detector.

47 OTHER INSTRUMENTATION↗

DeepLynx Ecosystem 2025

Poor data integration and governance continue to plague complex engineering projects, resulting in missed cost, schedule, and performance targets. Departments operate in isolated systems with manual data exchange, creating fragmented information that compounds errors and leads to significant delays and cost overruns. The DeepLynx ecosystem addresses these challenges through an open-source, modular data management platform that transforms fragmented project data into an integrated digital thread. Built on a federated microservice architecture, the ecosystem comprises seven specialized tools centered around DeepLynx Nexus, a unified data catalog with hierarchical organization and graph-based navigation capabilities. The ecosystem includes: DeepLynx Stream for real-time timeseries data ingestion from industrial sources; DeepLynx Ingest for governed data uploads with formal review workflows; DeepLynx Lattice for ontology-based entity and relationship extraction; DeepLynx Run for workflow orchestration and secure AI/ML compute; DeepLynx Visualize for 3D digital twin visualization; and DeepLynx Insight for AI-assisted document analysis with traceable, grounded responses. Deployable in cloud, on-premise, or hybrid environments using containerized Docker applications and Helm charts, the DeepLynx ecosystem provides flexible infrastructure that adapts to organizational requirements. By consolidating project data into a unified data lake with role-based access controls and OAuth2 authentication, DeepLynx enables digital thread and digital twin capabilities that improve decision-making, reduce risk, and support complex engineering workflows throughout the project lifecycle.

42 - ENGINEERING↗

Powernet in Farms Project

Coordinating behind-the-meter (BTM) distributed energy resources (DERs) is critical to ensuring efficiency and reliability for consumers facing an increasingly variable grid supply. Outside of very controlled environments, however, such coordination of heterogeneous resources at scale has remained a challenge due to harsh field conditions, the lack of adequate communication infrastructure, and the difficulty of modeling the system. The intent of this research was to refine the Powernet system deployed in a California dairy farm to achieve the following objectives: a) validate the results of the previous deployment and b) validate new hypothesis about system performance based on the simulation of the new system. The new system design would reduce the overall system cost, and achieve a payback period of less than 3 years, demonstrating the feasibility of such system and its relevance for a segment not well known for technology advancements in power systems. The new proposed system was significantly cheaper than the original design, which would enable the solution to be cost effective and likely economically viable. However, due to significant delays in project start date which affected funding availability, overlap with prior scheduled mandatory military leave from key members of the project team, and customer drop-out, due to the significant delays, which could not be replaced in time, caused the project to be ended prior to completion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Radiation Hardened Engineered Substrates for Time and Space Resolution

Low Gain Avalanche Diodes (LGADs) have become sensors of choice for fast timing of minimum ionizing particles. The current generation of these devices suffer from only moderate radiation hardness, low fill factor, and limited design options. Cactus Materials Inc. proposes to develop sensors with gain layer implants buried beneath the surface which will, with AC coupling developed by Brookhaven National Laboratory (BNL) and University of California Santa Cruz (UC Santa Cruz) solve these problems. Fermilab has a major role in the CMS timing upgrade using the current generation of LGADs and development of AC-coupled, buried layer LGADs will solve some of the central problems inherent in this technology. Annex B included a two-year work plan, deliverables, schedule and funding for the project’s SBIR Phase II award to develop and test prototype LGADs utilizing wafer bonding technology and epitaxial growth, that will allow for fabrication of radiation hard AC coupled devices with 100% fill factor and adjustable operating point.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Scalable Unit Commitment with Security Constrained AC Power Flow via ADMM and Hybrid Modeling Strategies

This research introduces a more efficient way to optimize power grid operations, breaking the problem into manageable steps and using advanced mathematical techniques to speed up calculations. By incorporating smart heuristics, improved preprocessing, and contingency analysis, the approach allows operators to make better decisions faster. These innovations enhance our understanding of how to optimize energy generation, making it possible to anticipate failures before they happen, reduce system costs, and improve overall grid performance. Ultimately, this research helps bridge the gap between theoretical models and real-world applications, paving the way for a smarter, more resilient power grid. This research directly benefits the public by making electricity more affordable, reliable, and sustainable. By improving how power grids schedule and distribute electricity, the project helps energy providers reduce operational costs, which can lead to lower electricity prices for consumers. Additionally, the ability to predict and prevent power system failures enhances grid reliability, reducing the likelihood of blackouts that can disrupt homes, businesses, and critical infrastructure such as hospitals. From an environmental perspective, optimizing power generation reduces energy waste and lowers carbon emissions, contributing to cleaner air and a more sustainable energy system. Furthermore, with extreme weather events becoming more frequent, these advancements make the power grid more resilient, ensuring communities are better prepared for emergencies and natural disasters. By strengthening the nation's energy infrastructure, this research plays a crucial role in improving economic stability, public safety, and environmental sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗