Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project X”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Project X Energy Station Workshop Report. Report by the Organizers and Co-Conveners of the Project X Energy Station Workshop

On January 29–30, 2013, Fermilab hosted a workshop with the objective to identify and explore the nuclear energy relevant research and development that would be possible in a nuclear energy station associated with the Project X Linear Accelerator (linac). Recognizing that the U.S. Nuclear Energy mission will always require the use of test reactors, the hypotheses that a nuclear energy station associated with Project X could accelerate and enhance the ability to test and evaluate new materials and advanced reactor fuels was explored. Forty-five of the invited participants including staff from the U.S. Department of Energy (DOE), DOE Laboratories, universities, and other institutes attended the workshop. These participants were invited based on their technical expertise and relevant experience.

Asner, David M.↗

Project X: Accelerator Reference Design

Project X is a high-intensity proton facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Project X is an integral part of the U.S. Intensity Frontier Roadmap as described in the P5 report of May 2008 [1] and within the Fermilab Strategic Plan of November 2011 [2]. This document represents Part I of the “Project X Book” describing the Project X accelerator facility and the broad range of physics research opportunities enabled by Project X. Parts II and III provide in-depth descriptions of the physics research program, both within and beyond particle physics [3]. The primary elements of the U.S. program to be supported by Project X include: Neutrino Experiments: Experimental studies of neutrino oscillations and neutrino interaction physics with ultra-intense neutrino beams provided by a high-power proton source with energies up to 120 GeV, utilizing near detectors at the Fermilab site and massive detectors at distant underground laboratories. Goal: At least 2 MW of proton beam power at any energy between 60 to 120 GeV; several hundred kW of proton beam power on target at 8 GeV. Kaon, Muon, Nucleon, and Neutron Precision Experiments: World-leading experiments studying ultra-rare kaon decays, searching for muon-to-electron conversion and nuclear electron dipole moments (EDMs), and exploring neutron properties at very high precision. Goal: MW-class proton beams supporting multiple experiments at 1 and 3 GeV, with flexible capability for providing distinct beam formats to concurrent users while allowing simultaneous operations with the neutrino program. Material Science and Nuclear Energy Applications: High-intensity accelerator, spallation, target and transmutation technology demonstrations will provide critical input into the design of future energy systems, including next generation fission reactors, nuclear waste transmutation systems and future thorium fuel-cycle power systems. Possible applications of muon spin rotation techniques provide sensitive probes of the magnetic structure of materials. Goal: Provide MW-class proton beams at 1 GeV, coupled with novel targets required to support a broad range of materials science and energy applications. Platform for Evolution to Future Frontier Facilities: A high-intensity proton source will strengthen and modernize the Fermilab injector complex, providing a robust platform upon which to build future frontier facilities. The Neutrino Factory and Muon Collider are examples that would provide world-leading capabilities at the Intensity and Energy Frontiers for many decades to come. Goal: Provide a straightforward upgrade path for a 4 MW, low-duty-factor source of protons at energies between 5 and 15 GeV. These four elements are expected to form the basis of the Mission Need statement required for the Department of Energy (DOE) Critical Decision 0 (CD-0), and represent the fundamental design criteria for Project X. The following chapters present the Reference Design for the Project X accelerator facility. The Reference Design is based on a continuous wave (CW) superconducting (SC) linac providing up to 1 and 3 MW of beam power at 1 and 3 GeV respectively. A pulsed linac provides acceleration of roughly 4% of the beam delivered from the CW linac to the 8 GeV injection energy of the existing Recycler/Main Injector complex. Upgrades to the Recycler and Main Injector support a factor of three increase, beyond current capabilities, in proton beam power at 60 to 120 GeV. The Reference Design represents a facility that will be unique in the world with unmatched capabilities for the delivery of very high beam power, with flexible beam formats, to multiple users at multiple energies. The utilization of linacs within the Project X facility enables capabilities beyond what is achievable with circular accelerators. It is anticipated that the final configuration and operating parameters of the complex will be further refined through the R&D program in advance of CD-2.

Holmes, Stephen D.↗

THE PROJECT-X INJECTOR EXPERIMENT: A NOVEL HIGH PERFORMANCE FRONT-END FOR A FUTURE HIGH POWER PROTON FACILITY AT FERMILAB

A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. PXIE is currently under construction at Fermilab and will be completed over the period FY12-17. PXIE will include an H* ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.

43 PARTICLE ACCELERATORS↗

Status and Opportunities at Project X: A Multi-MW Facility for Intensity Frontier Research

Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility will support programs in elementary particle and nuclear physics, with the potential for broader applications in materials and energy research. Project X is in the development stage with a R&D program focused on front end and superconducting RF acceleration technologies, and with design concepts for a staged implementation. This paper will review the status of the Project X conceptual development and the associated R&D programs.

43 PARTICLE ACCELERATORS↗

Testing Omega P’s 650 KW, 1.3 GHZ Low-Voltage Multi-Beam Klystron for the Project X Pulsed LINAC

Omega-P Inc. had developed a multi beam 1.3 GHz klystron (MBK) for the Project X pulsed linac application. Testing of the klystron require a special hardware such as a modulator, RF components, control system, power supplies, etc, as well as associated infrastructure( electricity, water, safety). This is an expensive part of klystron development for which Omega-P does not have the required equipment. Fermilab will test the MBK at Fermilab site providing contribution to the project all the necessary facilities, infrastructure and manpower for MBK test performance and analysis.

47 OTHER INSTRUMENTATION↗

Precision Neutrino Oscillation Measurements using Simultaneous High-Power, Low-Energy Project-X Beams

The first phase of the long-baseline neutrino experiment, LBNE10, will use a broadband, high-energy neutrino beam with a 10-kt liquid argon TPC at 1300 km to study neutrino oscillation. In this paper, we describe potential upgrades to LBNE10 that use Project X to produce high-intensity, low-energy neutrino beams. Simultaneous, high-power operation of 8- and 60-GeV beams with a 200-kt water Cerenkov detector would provide sensitivity to nu_mu to nu_e oscillations at the second oscillation maximum. We find that with ten years of data, it would be possible to measure sin2(2theta_13) with precision comparable to that expected from reactor antineutrino disappearance and to measure the value of the CP phase, delta_CP, with an uncertainty of (5-10) degrees. This document is submitted for inclusion in Snowmass 2013.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

RF thermal and new cold part design studies on TTF-III input coupler for Project-X

An RF power coupler is one of the key components in a superconducting (SC) linac. It provides RF power to the SC cavity and interconnects different temperature layers (1.8 K, 4.2 K, 70 K and 300 K). The TTF-III coupler is one of the most promising candidates for the High Energy (HE) linac of Project X, but it cannot meet the average power requirements because of the relatively high temperature rise on the warm inner conductor, so some design modifications will be required. In this paper, we describe our simulation studies on the copper coating thickness on the warm inner conductor with RRR values of 10 and 100. Our purpose is to rebalance the dynamic and static loads, and finally lower the temperature rise along the warm inner conductor. Additionally, to get stronger coupling, better power handling and less multipacting probability, one new cold part design was proposed using a 60 mm coaxial line; the corresponding multipacting simulation studies have also been investigated.

accelerators↗

Collaborative Research: Performance Retargeting of Instrumentation, Measurement, and Analysis Technologies for Exascale Computing: the PRIMA-X Project -- Final Technical Report

The PRIMA-X (Performance Retargeting of Instrumentation, Measurement, and Analysis Technologies for Exascale Computing) project was a collaborative research effort between the University of Oregon (UO) (Malony, PI) and the German Research School for Simulation Sciences GmbH (Wolf, PI) originally, later changed to the Technical University of Darmstadt. Our project aims addressed five areas -- scalability, dynamism, heterogeneity, locality, energy -- that present challenges to performance measurement systems at exascale, with emphasis placed on the first three. In essence, the general goal of the project was to prototype new technologies for performance measurement, analysis, and tuning on future exascale-enable computer systems. Each institution followed its research agena, with periodic coordination and sharing of ideas and results. After the 3-year funding, the PRIMA-X grant was extended beyond the 3-year period at no cost until the end of August 2018. This is the final technical report on the University of Oregon's progress during the entire project scope. Our main focus was to address the PRIMA-X challenges both through technological advancements in the TAU Performance System and their application, as well as prototypes developed in association with other exascale-directed research efforts (prior to the Exascale Computing Project (ECP)). Progress in Years 1 and 2 are summarized and our achievements in Year 3 (plus the extension) are discussed in more detail. This includes specific efforts on power, runtime systems, and monitoring infrastructure.

97 MATHEMATICS AND COMPUTING↗

BETO 2021 Peer Review - Task X- Project Management

This presentation serves as the peer review requirement for FCIC Task X. It covers structure, approach, impact, and accomplishments. The project will be scored by a peer review panel based on the presentation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Project X

Particle physics has made enormous progress in understanding the nature of matter and forces at a fundamental level and has unlocked many mysteries of our world. The development of the Standard Model of particle physics has been a magnificent achievement of the field. Many deep and important questions have been answered and yet many mysteries remain. The discovery of neutrino oscillations, discrepancies in some precision measurements of Standard-Model processes, observation of matter-antimatter asymmetry, the evidence for the existence of dark matter and dark energy, all point to new physics beyond the Standard Model. The pivotal developments of our field, including the latest discovery of the Higgs Boson, have progressed within three interlocking frontiers of research – the Energy, Intensity and Cosmic frontiers – where discoveries and insights in one frontier powerfully advance the other frontiers as well.

43 PARTICLE ACCELERATORS↗

The WISSH quasars project: X. Discovery of a multi-component and highly variable UV ultra-fast outflow in a z = 3.6 quasar

We report on the variability of a multi-component broad absorption line (BAL) system observed in the hyper-luminous quasar J1538+0855 at z = 3.6. Observations from the Sloan Digital Sky Survey (SDSS), Very Large Telescope (VLT), Large Binocular Telescope (LBT), and Subaru telescope taken at five different epochs, spanning 17 yr in the observed frame, are presented. We detect three (A, B, and C) CIV variable troughs exhibiting extreme velocities (~40 000–54 000 km s –1 ) similar to the ultra-fast outflows (UFOs) typically observed in the X-ray spectra. The A component of the BAL UFO (v ufo ~ 0.17c) shows strength variations, while B (v ufo ~ 0.15c) and C (v ufo ~ 0.13c) components show changes both in shape and strength, appearing and disappearing at different epochs. In addition, during the last observation on June 2021, the entire BAL system disappeared. The variability trends observed during the first two epochs (1.30 yr rest frame) in the CIV, SiIV, OVI, and NV absorption spectral regions are the same for B and C troughs, while the A component of the BAL varies independently.

79 ASTRONOMY AND ASTROPHYSICS↗

The ACS LCID project. X. the star formation history of IC 1613: Revisiting the over-cooling problem

We present an analysis of the star formation history (SFH) of a field near the half-light radius in the Local Group dwarf irregular galaxy IC 1613 based on deep Hubble Space Telescope Advanced Camera for Surveys imaging. Our observations reach the oldest main sequence turn-off, allowing a time resolution at the oldest ages of ∼1 Gyr. Our analysis shows that the SFH of the observed field in IC 1613 is consistent with being constant over the entire lifetime of the galaxy. These observations rule out an early dominant episode of star formation in IC 1613. We compare the SFH of IC 1613 with expectations from cosmological models. Since most of the mass is in place at early times for low-mass halos, a naive expectation is that most of the star formation should have taken place at early times. Models in which star formation follows mass accretion result in too many stars formed early and gas mass fractions that are too low today (the 'over-cooling problem'). The depth of the present photometry of IC 1613 shows that, at a resolution of ∼1 Gyr, the star formation rate is consistent with being constant, at even the earliest times, which is difficult to achieve in models where star formation follows mass assembly.

79 ASTRONOMY AND ASTROPHYSICS↗

The Carina project. X. On the kinematics of old and intermediate-age stellar populations

We present new radial velocity (RV) measurements of old (horizontal branch) and intermediate-age (red clump) stellar tracers in the Carina dwarf spheroidal. They are based on more than 2200 low-resolution spectra collected with VIMOS at Very Large Telescope (VLT). The targets are faint (20 ≲ V ≲ 21.5 mag), but the accuracy at the faintest limit is ≤9 km s{sup −1}. These data were complemented with RV measurements either based on spectra collected with FORS2 and FLAMES/GIRAFFE at VLT or available in the literature. We ended up with a sample of 2748 stars and among them, 1389 are candidate Carina stars. We found that the intermediate-age stellar component shows a well-defined rotational pattern around the minor axis. The western and the eastern side of the galaxy differ by +5 and −4 km s{sup −1} when compared with the main RV peak. The old stellar component is characterized by a larger RV dispersion and does not show evidence of the RV pattern. We compared the observed RV distribution with N-body simulations for a former disky dwarf galaxy orbiting a giant Milky Way–like galaxy. We rotated the simulated galaxy by 60° with respect to the major axis, we kept the observer on the orbital plane of the dwarf and extracted a sample of stars similar to the observed one. Observed and predicted V{sub rot}/σ ratios across the central regions are in remarkable agreement. This evidence indicates that Carina was a disky dwarf galaxy that experienced several strong tidal interactions with the Milky Way. Owing to these interactions, Carina transformed from a disky to a prolate spheroid and the rotational velocity transformed into random motions.

79 ASTRONOMY AND ASTROPHYSICS↗