Analysis on linac quadrupole misalignment in FACET commissioning 2012

In this note, the analysis on linac quadrupole misalignment is presented for the FACET linac section LI05-09 plus LI11-19. The effectiveness of the beam-based alignment technique is preliminarily confirmed by the measurement. Beam-based alignment technique was adopted at SLAC linac since SLC time. Here the beam-based alignment algorithms are further developed and applied in the FACET commissioning during 2012 run.

43 PARTICLE ACCELERATORS↗

Efficiency, Power Loss, and Power Factor Measurement of Quadrupole Magnet Power Supplies at the Spallation Neutron Source

The linear accelerator (LINAC) quadrupole magnets are powered by 42 silicon-controlled rectifier (SCR) based power supplies at the Spallation Neutron Source (SNS) facility of Oak Ridge National Laboratory. These 35V, 525A power supplies are bulky, inefficient and require both air and water cooling. The reliability of the SNS facility is impacted due to water leaks internal to power supplies and current readback issues associated with their unique control system interface, resulting in multiple downtime events. Hence, an alternate solution is necessary for the continued reliable operation of the SNS. To mitigate the above-mentioned problems, this paper proposes the use of off-the-shelf Switch Mode Power Supplies (SMPS) rated for 20V, 500A with serial control interface. These SMPS are air-cooled, more efficient and more compact owing to their switching speeds of approximately 160 kHz. The performance enhancements of the SMPS in comparison with the existing SCR power supply are discussed in detail in this paper. The features of the SMPS, along with experimental results for both power supplies, like efficiency, power losses and stability, are presented. Ongoing work is also discussed.

Harave, Sudarshan↗

A gas-jet transport and catcher technique for on-line production of radioactive ion beams using an electron cyclotron resonance ion-source

Radioactive ion beams (RIB) have been produced on-line, using a gas-jet recoil transport coupled Electron Cyclotron Resonance (ECR) ion-source at the VECC-RIB facility. Radioactive atoms/molecules carried through the gas-jet were stopped in a catcher placed inside the ECR plasma chamber. A skimmer has been used to remove bulk of the carrier gas at the ECR entrance. The diffusion of atoms/molecules through the catcher has been verified off-line using stable isotopes and on-line through transmission of radioactive reaction products. Beams of {sup 14}O (71 s), {sup 42}K (12.4 h), {sup 43}K (22.2 h), and {sup 41}Ar (1.8 h) have been produced by bombarding nitrogen and argon gas targets with proton and alpha particle beams from the K130 cyclotron at VECC. Typical measured intensity of RIB at the separator focal plane is found to be a few times 10{sup 3} particles per second (pps). About 3.2 Multiplication-Sign 10{sup 3} pps of 1.4 MeV {sup 14}O RIB has been measured after acceleration through a radiofrequency quadrupole linac. The details of the gas-jet coupled ECR ion-source and RIB production experiments are presented along with the plans for the future.

43 PARTICLE ACCELERATORS↗

Optimization of laser-target parameters for the production of stable lithium beam

A laser ion source coupled with a radio frequency quadrupole linac accelerator is being proposed as a suitable system for the production of a low energy, high-current stable lithium beam. In order to maximize the lithium yield, plasmas generated by laser ablation of different materials based on lithium (Li, LiOH, and LiNbO3) have been characterized by using a Faraday cup and an electrostatic ion analyzer in the time of flight configuration. A wide range of laser power density has been investigated (109–1012 W/cm2) using two Nd:YAG lasers operating at different wavelengths (1064 nm and 532 nm), pulse durations (6 ns and 17 ns), and maximum energies (1400 mJ and 210 mJ). This paper outlines the pros and cons of the investigated materials by studying how the ion energy, yields, and charge state distributions are modified when the laser power density is changed. Considerable attention has been paid to the higher charge states of oxygen, which may occur with the same mass-to-charge ratio of Li3+. The analysis has evidenced that LiNbO3 represents a valid target since it allows minimizing the O6+/7Li3+ ratio down to 2.5% by using a laser power density of 1.8 × 1010 W/cm2. For such a condition, a Li3+ current of 1.4 mA/cm2 has been measured.

Cannavò, A. (ORCID:0000000309759630)↗

Numerical Modeling of Ion-Optical Systems for Extraction of a Beam of Negative Hydrogen Ions and Its Acceleration and Matching with a Radio-Frequency Quadrupole Accelerator

A source of negative hydrogen ions is constructed at the Institute for High Energy Physics in order to raise the intensity of the U-70 accelerator complex using multiturn charge-exchange injection. The 3D ion-optical IBSimu simulation package was used to model and optimize the system for extraction of an ion beam from plasma, its acceleration to 100 keV, and matching with a radio-frequency quadrupole (RFQ) accelerator. The system of extraction of an ion beam with a current of 50 mA and electron-flow suppression was modeled. The magnetic transport channels with two solenoids and six quadrupole lenses were compared. The end goals of analysis of the matching channel were to obtain the needed Twiss parameters and to minimize the emittance growth at the RFQ input.

43 PARTICLE ACCELERATORS↗

Low Energy Muon Capture and Transport from a Heavy Target

The MeV Test Area (MTA) secondary beamline is currently designed to produce and capture a low energy pion beam that then produces a tertiary muon beam via decay along the secondary line. The challenge presented in capturing muons from low-energy decay-in-flight pions, is the large decay angle that results from the low momentum. The current air-core quadruples lack the strength to bend/capture muons at large angles. Recently much stronger 400- MeV Linac quadrupoles have become available which are capable of strong focusing and large-angle capture. Initial results from this upgrade and reconfiguration indicate a major improvements in angle acceptance and transport ability for low-energy muons.

Winter, Wesley↗

First Muon RF Acceleration for the Muon g-2 Experiment at J-PARC

Muons have been accelerated by using a radio frequency accelerator for the first time. Negative muonium atoms (Mu$^-$), which are bound states of positive muons ($\mu^+$) and two electrons, are generated from $\mu^+$'s through the electron capture process in an aluminum degrader. The generated Mu$^-$'s are initially electrostatically accelerated and injected into a radio frequency quadrupole linac (RFQ). In the RFQ, the Mu$^-$'s are accelerated to 89~keV. The accelerated Mu$^-$'s are identified by momentum measurement and time of flight. This first muon acceleration is one of big milestones for realizing new muon g-2 experiment at J-PARC.

43 PARTICLE ACCELERATORS↗

Pulsed-focusing recirculating linacs for muon acceleration

Since the muon has a short lifetime, fast acceleration is essential for high-energy applications such as muon colliders, Higgs factories, or neutrino factories. The best one can do is to make a linear accelerator with the highest possible accelerating gradient to make the accelerating time as short as possible. However, the cost of such a single linear accelerator is prohibitively large due to expensive power sources, cavities, tunnels, and related infrastructure. As was demonstrated in the Thomas Jefferson Accelerator Facility (Jefferson Lab) Continuous Electron Beam Accelerator Facility (CEBAF), an elegant solution to reduce cost is to use magnetic return arcs to recirculate the beam through the accelerating RF cavities many times, where they gain energy on each pass. In such a Recirculating Linear Accelerator (RLA), the magnetic focusing strength diminishes as the beam energy increases in a conventional linac that has constant strength quadrupoles. After some number of passes the focusing strength is insufficient to keep the beam from going unstable and being lost. In this project, the use of fast pulsed quadrupoles in the linac sections was considered for stronger focusing as a function of time to allow more successive passes of a muon beam in a recirculating linear accelerator. In one simulation, it was shown that the number of passes could be increased from 8 to 12 using pulsed magnet designs that have been developed and tested. This could reduce the cost of linac sections of a muon RLA by 8/12, where more improvement is still possible. The expense of a greater number of passes and corresponding number of return arcs was also addressed in this project by exploring the use of ramped or FFAG-style magnets in the return arcs. A better solution, invented in this project, is to use combined-function dipole-quadrupole magnets to simultaneously transport two beams of different energies through one magnet string to reduce costs of return arcs by almost a factor of two. A patent application was filed for this invention and a detailed report published in Physical Review Special Topics. A scaled model using an electron beam was developed and proposed to test the concept of a dog bone RLA with combined-function return arcs. The efforts supported by this grant were reported in a series of contributions to particle accelerator conferences that are reproduced in the appendices and summarized in the body of this report.

43 PARTICLE ACCELERATORS↗

Development of C{sup 6+} laser ion source and RFQ linac for carbon ion radiotherapy

A prototype C{sup 6+} injector using a laser ion source has been developed for a compact synchrotron dedicated to carbon ion radiotherapy. The injector consists of a laser ion source and a 4-vane radio-frequency quadrupole (RFQ) linac. Ion beams are extracted from plasma and directly injected into the RFQ. A solenoid guides the low-energy beams into the RFQ. The RFQ is designed to accelerate high-intensity pulsed beams. A structure of monolithic vanes and cavities is adopted to reduce its power consumption. In beam acceleration tests, a solenoidal magnetic field set between the laser ion source and the RFQ helped increase both the peak currents before and after the RFQ by a factor of 4.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Simulation study of high-current 7 Li 3+ beam acceleration with laser ion source and RFQ linac using direct plasma injection

Accelerator-based neutron sources (ABNS) utilizing the 7 Li(p,n) 7 Be reaction in inverse kinematics offer strong forward-directed neutron emission, making them attractive for compact and clean neutron source with low background neutrons and unwanted radiation. However, practical use of such systems requires lithium ion beam currents that exceed the capability of conventional ion accelerators by two orders of magnitude. In this study, we numerically designed and evaluated a high-current acceleration system based on a direct plasma injection scheme (DPIS), combining a laser ion source (LIS) and a radio-frequency quadrupole (RFQ) linac. The ion extraction optics and RFQ entrance were optimized using IGUN, OPERA, and GPT, demonstrating that over 1.2 A-class beam current can be injected into the RFQ. The RFQ structure was designed under realistic engineering constraints including surface field strength (Kilpatrick factor) and RF power. GPT simulations showed that a 370 mA 7 Li 3+ beam can be successfully accelerated within a ±10 % energy spread. To validate downstream compatibility, we also designed a simplified medium-energy beam transport (MEBT) section and an interdigital H-type (IH) linac, confirming successful acceleration of a 320 mA beam to the total energy of 14 MeV. These results support the feasibility of the DPIS and RFQ approach as a promising solution for compact neutron sources and other high-intensity ion beam applications.

43 PARTICLE ACCELERATORS↗

Machining and brazing of accelerating RF cavity

BARC has developed 2856 MHz accelerating cavities for 6 MeV, 9 MeV and 10 MeV RF Linac. New vendors are developed for mass production of accelerating cavity for future projects. New vendors are developing for diamond turning machining, cleaning and brazing processes. Fabrication involved material testing, CNC diamond turning of cavity, cavity cleaning and brazing. Before and after brazing resonance frequency (RF) of cavity was checked with vector network analyser (VNA). A power feed test setup is also fabricated to test power feed cavity before brazing. This test setup will be used to find out assembly performance of power feed cavity and its coupler. This paper discusses about nano machining, cleaning and brazing processes of RF cavities. (author)

43 PARTICLE ACCELERATORS↗

The status of the SNS external antenna ion source and spare RFQ test facility

The Oak Ridge National Laboratory operates the Spallation Neutron Source, consisting of a H{sup −} ion source, a 1 GeV linac and an accumulator ring. The accumulated <1 μs-long, ∼35 A beam pulses are extracted from the ring at 60 Hz and directed onto a liquid Hg target. Spalled neutrons are directed to ∼20 world class instruments. Currently, the facility operates routinely with ∼1.2 MW of average beam power, which soon will be raised to 1.4 MW. A future upgrade with a second target station calls for raising the power to 2.8 MW. This paper describes the status of two accelerator components expected to play important roles in achieving these goals: a recently acquired RFQ accelerator and the external antenna ion source. Currently, the RFQ is being conditioned in a newly constructed 2.5 MeV Integrated Test Facility (ITF) and the external antenna source is also being tested on a separate test stand. This paper presents the results of experiments and the testing of these systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The cyclotron laboratory and the RFQ accelerator in Bern

Two proton accelerators have been recently put in operation in Bern: an 18 MeV cyclotron and a 2 MeV RFQ linac. The commercial IBA 18/18 cyclotron, equipped with a specifically conceived 6 m long external beam line ending in a separate bunker, will provide beams for routine 18-F and other PET radioisotope production as well as for novel detector, radiation biophysics, radioprotection, radiochemistry and radiopharmacy developments. The accelerator is embedded into a complex building hosting two physics laboratories and four Good Manufacturing Practice (GMP) laboratories. This project is the result of a successful collaboration between the Inselspital, the University of Bern and private investors, aiming at the constitution of a combined medical and research centre able to provide the most cutting-edge technologies in medical imaging and cancer radiation therapy. The cyclotron is complemented by the RFQ with the primary goals of elemental analysis via Particle Induced Gamma Emission (PIGE), and the detection of potentially dangerous materials with high nitrogen content using the Gamma-Resonant Nuclear Absorption (GRNA) technique. In this context, beam instrumentation devices have been developed, in particular an innovative beam profile monitor based on doped silica fibres and a setup for emittance measurements using the pepper-pot technique. On this basis, the establishment of a proton therapy centre on the campus of the Inselspital is in the phase of advanced study.

07 ISOTOPE AND RADIATION SOURCES↗

Electrostatic Matching of a High Current Proton Beam to a RFQ

In order to demonstrate the operation of a prototype DWA (dielectric wall accelerator), it was necessary to modify the LEBT of a commercially procured proton RFQ (Radio Frequency Quadrupole) injector linac. The relatively high output current (35 mA) of the duoplasmatron ion source at the low injection energy of 35 keV to the RFQ presented a matching problem in the beam transport due to the high space charge, the fixed transport length, and the small beam size required at the RFQ. In addition, only the use of electrostatic lenses was considered in order to minimize the size of the system. The standard AccSys design using one decel-accel einzel lens proved to be insufficient, so three new solutions were proposed, each using a pair of decelerating einzel lenses. The tool used to optimize these designs was a newly developed feature of the program IGUN. The RFQ acceptance ellipse is plotted on top of the phase space data of the transport calculation together with an ellipse with the same Twiss parameters which just encloses all the trajectories. The quality of matching is then given as the ratio of the areas of these two ellipses, making optimization easy. This paper will present the results of this optimization and the performance of the actual equipment built and tested.

43 PARTICLE ACCELERATORS↗

Initial commissioning results with the NSCL Electron Beam Ion Trap

The ReA reaccelerator is being added to the National Superconducting Cyclotron Laboratory (NSCL) fragmentation facility in order to provide exotic rare-isotope beams, not available at the Isotope Separation On-Line facilities, in the several-MeV/u energy range. The first stage of the NSCL reaccelerator complex, consisting of an EBIT charge breeder, a room-temperature radiofrequency quadrupole (RFQ) accelerator, and superconducting linear accelerator modules, has been completed and is being put into operation. Commissioning of the EBIT has started by extracting charge-bred residual gas ions, ions created from a Ne gas jet directed across the EBIT's electron beam and ions captured from an external test ion source. Charge-bred ions from the Ne gas jet have been extracted as a pulse and accelerated through the RFQ and the two cryomodules.

43 PARTICLE ACCELERATORS↗

H{sup -} beam transport experiments in a solenoid low energy beam transport

The Front End Test Stand (FETS) is located at Rutherford Appleton Laboratory and aims for a high current, fast chopped 3 MeV H{sup -} ion beam suitable for future high power proton accelerators like ISIS upgrade. The main components of the front end are the Penning ion source, a low energy beam transport line, an radio-frequency quadrupole (RFQ) and a medium energy beam transport (MEBT) providing also a chopper section and rebuncher. FETS is in the stage of commissioning its low energy beam transport (LEBT) line consisting of three solenoids. The LEBT has to transport an H{sup -} high current beam (up to 60 mA) at 65 keV. This is the injection energy of the beam into the RFQ. The main diagnostics are slit-slit emittance scanners for each transversal plane. For optimizing the matching to the RFQ, experiments have been performed with a variety of solenoid settings to better understand the actual beam transport. Occasionally, source parameters such as extractor slit width and beam energy were varied as well. The paper also discusses simulations based on these measurements.

43 PARTICLE ACCELERATORS↗

Iron beam acceleration using direct plasma injection scheme

A new set of vanes of radio frequency quadrupole (RFQ) accelerator was commissioned using highly charged iron beam. To supply high intensity heavy ion beams to the RFQ, direct plasma injection scheme (DPIS) with a confinement solenoid was adopted. One of the difficulties to utilize the combination of DPIS and a solenoid field is a complexity of electro magnetic field at the beam extraction region, since biasing high static electric field for ion extraction, RFQ focusing field, and the solenoid magnetic field fill the same space simultaneously. To mitigate the complexity, a newly designed magnetic field clamps were used. The intense iron beam was observed with bunched structure and the total accelerated current reached 2.5 nC.