Search NASA⌕ Search

SEARCH · Search NASA

Results for “QUALIFICATION AND TESTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Low Activity Waste Tuning Feed Material Testing; Qualification and Transition Testing (Final Report)

The primary objective of this work was to collect data to support processing of the proposed LAW tuning feed composition at the WTP. This was achieved through assessment of the modified LAWB83 feed and glass composition by feed rheology testing and by processing selected LAW feeds through a DM100 melter to confirm that the tuning feed material can be fed to the melter with acceptable commercial or hazards risk. The testing also confirmed that transitions from the startup frit to the LAWB83 tuning feed and then to the cold commissioning simulant composition can be performed without causing any significant melter performance issues.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification testing for a central station

Qualification testing for a Central Station Photovoltaic (PV) Facility depends to a great extent on the system design, (fixed versus tracking), and the level of data acquisition/control which is incorporated into the system. The basic elements which require qualification tests include: dc power production/collection; tracker conversion systems; ac utility interface; system level control; and data acquisition/reporting. The qualification tests from the Lungo (ARCO) 1 MW Facility which were completed in January 1983 are discussed. The philosophy and many of the procedures are applicable to any central station PV facility.

Forrester, D. L.↗

Test Report for the Qualification Testing of the ORNL-SFC-W-1 Special Form Capsule

Three prototypes the ORNL-SFC-W-1 special form capsules (SFCs) of the same design were evaluated to determine if the requirements of Title 49, Code of Federal Regulations (CFR), Part 173.469, Tests for Special Form Class 7 (Radioactive) Materials, were met. The results of the special form tests are documented in this test report. This report describes the special form testing activities performed on the three ORNL-SFC-W-1 capsules. The test units were designated as TU-1, TU-2 and TU-3. TU-1 was subjected to leak testing, impact testing and percussion testing. TU-1 was leak tested using the leak rate test specified in 49 CFR 173.469(a)(4)(i). The impact test was conducted according to the requirements in 49 CFR 173.469 (b)(1). The percussion test that was carried out on TU-1 was conducted in accordance with 49 CFR 173.469 (b)(2). Both TU-2 and TU-3 were subjected to a leak rate test as specified in 173.469(a)(4)(i) and a heat test as specified in 49 CFR 173.469(b)(4). Each test unit was leak tested before and after these respective tests. The leak rate tests performed were helium back-pressure tests and bubble tests as specified in American National Standards Institute (ANSI) N14.5-2014.The measured leak rates were converted to standard condition leak rates as specified in American Society for Testing and Measurement (ASTM) E 493. The determined standardized leak rates obtained from the test and the calculations for all the test units met the requirements for special form certification. The testing was performed under the direction of the Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP).

42 ENGINEERING↗

Issues Related to Large Flight Hardware Acoustic Qualification Testing

The characteristics of acoustical testing volumes generated by reverberant chambers or a circle of loudspeakers with and without large flight hardware within the testing volume are significantly different. The parameters attributing to these differences are normally not accounted for through analysis or acoustic tests prior to the qualification testing without the test hardware present. In most cases the control microphones are kept at least 2-ft away from hardware surfaces, chamber walls, and speaker surfaces to minimize the impact of the hardware in controlling the sound field. However, the acoustic absorption and radiation of sound by hardware surfaces may significantly alter the sound pressure field controlled within the chamber/speaker volume to a given specification. These parameters often result in an acoustic field that may provide under/over testing scenarios for flight hardware. In this paper the acoustic absorption by hardware surfaces will be discussed in some detail. A simple model is provided to account for some of the observations made from Mars Science Laboratory spacecraft that recently underwent acoustic qualification tests in a reverberant chamber.

direct acoustics↗

Project FIRES. Volume 4: Prototype Protective Ensemble Qualification Test Report, Phase 1B

The qualification testing of a prototype firefighter's protective ensemble is documented. Included are descriptions of the design requirements, the testing methods, and the test apparatus. The tests include measurements of individual subsystem characteristics in areas relating to both physical testing, such as heat, flame, impact penetration and human factors testing, such as dexterity, grip, and mobility. Also, measurements related to both physical and human factors testing of the complete ensemble, such as water protection, metabolic expenditures, and compatibility are considered.

Abeles, F. J.↗

Acceptance and qualification test results of the 20 km electromechanical tether for TSS-1

Acceptance and qualification tests have been performed on the TSS-1 flight tether and its associated qualification tether. Acceptance testing during production included periodic measurement of conductor resistance, off-line breakstrength tests on strength member samples, continuous measurement of the insulation layer voltage withstand capability, and a continuous mechanical proof-loading procedure during the tether jacketing operation. The qualification test sequence consisted of thermal vacuum, voltage withstand and breakstrength tests on samples taken from the production runs for both the qualification and flight tethers. This paper will analyze the acceptance and qualification test data, respectively. Results indicate that the completed flight tether exceeds the design requirements for the TSS-1 mission.

Marshall, L. S.↗

Test Report of Special Form Qualification Testing for the ORNL U ZipCan

This test report describes the special form testing activities performed on the two ZiPCans. One prototype test unit was subjected to the tests stipulated by 10 CFR 71.75 (d)(1)(i), ISO 2919:1999(E) Class 4 impact test, along with the leak rate test specified in 49 CFR 173.469(a)(4)(i). The other test unit was subjected to a leak rate test as specified in 173.469(a)(4)(i) and a heat test as specified in 49 CFR 173.469 (b)(4). Each test unit was leak tested before and after these respective tests. The leak rate tests performed were helium back-pressure tests and bubble tests, as specified in ANSI N14.5-2014.The measured leak rates were converted to standard condition leak rates as specified in ASTM E 493. The determined standardized leak rates from the test and calculation for both test units met the requirements for special form certification.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Test Report of Special Form Qualification Testing for the ORNL U ZiPCAN, Rev. 1

This report describes the special form testing activities performed on the two ZiPCans. One prototype test unit was subjected to the tests stipulated by International Standards Organization (ISO) 2919:1999(E) Class 4 impact test, along with the leak rate test specified in 49 CFR 173.469(a)(4)(i). The other test unit was subjected to a leak rate test as specified in 173.469(a)(4)(i) and a heat test as specified in 49 CFR 173.469(b)(4).

42 ENGINEERING↗

Qualification test of the Ross Double Planetary Mixer

This test report describes the qualification test of the Ross Double Planetary Mixer used to mix room temperature vulcanized (RTV) silicone (Dow Corning 90-006-2) for the redesigned solid rocket motor (RSRM) nozzle joints. Testing was completed 18 June 1993 in the M-113A Nozzle Fabrication Facility at Thiokol Corporation, Space Operations, Brigham City, Utah. The Ross mixer provides better mixing and better control on temperature and humidity, resulting in better quality RTV and a longer usable pot life. The test began on 3 May 1993 and was stopped due to operator error during the tensile strength and elongation testing. Specimens were ruined without gathering any useful data. A 'no test' was declared, the problem was remedied, and the test was re-run with MSFC approval. The test was run and all pass/fail criteria were met, most with a considerable margin. The Ross Double Planetary Mixer met all certification objectives and is recommended for immediate use for mixing RTV silicone for RSRM nozzle joints.

Lueders, Kurt F.↗

Space Flight Requirements for Fiber Optic Components; Qualification Testing and Lessons Learned

"Qualification" of fiber optic components holds a very different meaning than it did ten years ago. In the past, qualification meant extensive prolonged testing and screening that led to a programmatic method of reliability assurance. For space flight programs today, the combination of using higher performance commercial technology, with shorter development schedules and tighter mission budgets makes long term testing and reliability characterization unfeasible. In many cases space flight missions will be using technology within years of its development and an example of this is fiber laser technology. Although the technology itself is not a new product the components that comprise a fiber laser system change frequently as processes and packaging changes occur. Once a process or the materials for manufacturing a component change, even the data that existed on its predecessor can no longer provide assurance on the newer version. In order to assure reliability during a space flight mission, the component engineer must understand the requirements of the space flight environment as well as the physics of failure of the components themselves. This can be incorporated into an efficient and effective testing plan that "qualifies" a component to specific criteria defined by the program given the mission requirements and the component limitations. This requires interaction at the very initial stages of design between the system design engineer, mechanical engineer, subsystem engineer and the component hardware engineer. Although this is the desired interaction what typically occurs is that the subsystem engineer asks the components or development engineers to meet difficult requirements without knowledge of the current industry situation or the lack of qualification data. This is then passed on to the vendor who can provide little help with such a harsh set of requirements due to high cost of testing for space flight environments. This presentation is designed to guide the engineers of design, development and components, and vendors of commercial components with how to make an efficient and effective qualification test plan with some basic generic information about many space flight requirements. Issues related to the ~ physics of failure, acceptance criteria and lessons learned will also be discussed to assist with understanding how to approach a space flight mission in an ever changing commercial photonics industry.

Ott, Melanie N.↗