Search NASA⌕ Search

SEARCH · Search NASA

Results for “QUALIFICATION PLUS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Qualification Plus: Performance and Durability Tests Beyond IEC 61215 (Presentation)

Qualification Plus is an accelerated test protocol and quality management system that gives higher confidence in field performance of PV modules compared with conventional qualification testing. The test sequences are being developed as consensus standards, but the early publication of these tests enables the community to begin benefiting from them sooner.

14 SOLAR ENERGY↗

Photovoltaic Module Qualification Plus Testing

This report summarizes a set of test methods that are in the midst of being incorporated into IEC 61215 for certification of a module design or other tests that go beyond certification to establish bankability.

14 SOLAR ENERGY↗

Approaches to Demonstrating Bankability and Differentiating Product Quality (Presentation)

As the PV Industry has matured, there is increasing interest in quantifying higher quality so that customers may select products that meet their needs, and investors are demanding high confidence before committing millions of dollars. The community is developing the knowledge and standard methods needed to address these. This talk will give an overview of new developments in the last year including descriptions and status of Qualification Plus (a test protocol that goes beyond the standard qualification tests), a PV-specific version of ISO 9001 (for increased confidence in manufacturing consistency), and the Regional Test Centers (where new products can be tested to quantify performance and durability in multiple climate zones.) Development of PV system-level certification will also be described.

14 SOLAR ENERGY↗

Chapter 10.3: Reliability and Durability of PV Modules

Each year the world invests tens of billions of dollars or euros in PV systems with the expectation that these systems will last approximately 25 years. Although the disciplines of reliability, quality, and service life prediction have been well established for numerous products, a full understanding of these is currently challenging for PV modules because the desired service lifetimes are decades, preventing direct verification of lifetime predictions. A number of excellent reviews can be found in the literature summarizing the types of failures that are commonly observed for PV modules. This chapter discusses key failure/degradation mechanisms selected to highlight how the kinetics of failure rates can and cannot be confidently predicted. For EVA-encapsulated modules, corrosion is observed to follow delamination, which then allows water droplets to directly contact the metallization. Extended test protocols such as Qualification Plus were created to address the known problems while standards groups update standard tests through the consensus process.

14 SOLAR ENERGY↗

Improving Solar PV Degradation Prediction Certainty: PREDICTS2 (Final Technical Report)

The rate and type of in-service PV performance degradation vary for different module designs, vintages, and operating climates. The current IEC 61215 module qualification testing standard can be used to identify design and manufacturing flaws that may lead to early life failures, but it was not intended to accurately predict degradation rates in the first 5 to 10 years of a PV plant’s lifetime, nor long-term performance, under varied operating conditions. Correlations between accelerated aging data and real-world degradation data are needed to better predict wear-out degradation in response to environmental stressors, such as elevated temperature, temperature cycling, moisture, wind load, and solar radiation. The PREDICTS2 project aged 36 pristine-condition ‘spare’ modules from a commercial PV power plant in the U.S. Southwest using the IEC 61215 and Qualification Plus (Qual Plus) testing standards. The study is unique in its ability to compare performance degradation data for fielded modules operating outdoors for 6 years in a commercial plant environmental with degradation data for modules of the same make, model and vintage that have been aged artificially in an indoor laboratory. Changes in individual module current-voltage (I-V) curve data were measured before and after the artificial aging process and compared to I-V curve data for the fielded modules. This project advanced the industry’s understanding of how environmental stressors affect performance degradation and established relationships between degradation mechanisms and changes to module electrical parameters and power loss. Improved certainty in degradation rates is expected to be the greatest source of LCOE reduction resulting from this project. Reducing the spread in the degradation rate probability distribution lowers project risk, which translates to lower project financing costs.

14 SOLAR ENERGY↗

Evaluation of the Mechanical Properties of Cast and Wrought CF8C-Plus Relevant to ASME Code Case Qualification

The mechanical behavior of a cast form of an advanced austenitic stainless steel, CF8C-Plus, is compared with that of its wrought equivalent in terms of both tensile and creep-rupture properties and estimated allowable stress values for pressurized service at temperatures up to about 850°C. A traditional Larson-Miller parametric model is used to analyze the creep-rupture data and to predict long-term lifetimes for comparison of the two alloy types. The cast CF8C-Plus exhibited lower yield and tensile strengths, but higher creep strength compared to its wrought counterpart. Two welding methods, shielded-metal-arc welding (SMAW) and gas-metal-arc welding, met the weld qualification acceptance criteria in ASME BPVC Section IX for the cast CF8C-Plus. However, for the wrought CF8C-Plus, while SMAW and gas-tungsten-arc welding passed the tensile acceptance criteria, they failed the side bend tests due to lack of fusion or weld metal discontinuities.

Chen, Xiang↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: AMSU-A1 EOS Instrument, (S/N 202) Qualification Level Vibration Tests of August/September 1998, (S/O 565632, OC-417) Plus Addendum A

The purpose of this report is to present a qualification level vibration testing performed on the S/N 202, EOS AMSU-A1 Instrument was vibration tested to qualification levels per the Ref. 1 shop order. The instrument withstood the 8 g sine sweep test, the 7.5 Grms random vibration test, and the 18.75 g sine burst test in each of the three orthogonal axes. Some loss of transmissibility, however, is seen in the lower reflector after Z-axis random vibration. The test sequence was not without incidence. Failure of Channel 7 in the Limited Performance Test (LPT) performed after completion of the 1 st (X-axis) axis vibration sequence, required replacement of the DRO and subsequent re-testing of the instrument. The post-vibration comprehensive performance test (CPT) was successfully run after completion of the three axes of vibration with the replacement component installed in the instrument. Passing the CPT signified the successful completion of the S/N 202 A1 qualification vibration testing.

Heffer, R.↗

Thermal Performance of ATLAS Laser Thermal Control System Demonstration Unit

The second Ice, Cloud, and Land Elevation Satellite mission currently planned by National Aeronautics and Space Administration will measure global ice topography and canopy height using the Advanced Topographic Laser Altimeter System {ATLAS). The ATLAS comprises two lasers; but only one will be used at a time. Each laser will generate between 125 watts and 250 watts of heat, and each laser has its own optimal operating temperature that must be maintained within plus or minus 1 degree Centigrade accuracy by the Laser Thermal Control System (LTCS) consisting of a constant conductance heat pipe (CCHP), a loop heat pipe (LHP) and a radiator. The heat generated by the laser is acquired by the CCHP and transferred to the LHP, which delivers the heat to the radiator for ultimate rejection. The radiator can be exposed to temperatures between minus 71 degrees Centigrade and minus 93 degrees Centigrade. The two lasers can have different operating temperatures varying between plus 15 degrees Centigrade and plus 30 degrees Centigrade, and their operating temperatures are not known while the LTCS is being designed and built. Major challenges of the LTCS include: 1) A single thermal control system must maintain the ATLAS at 15 degrees Centigrade with 250 watts heat load and minus 71 degrees Centigrade radiator sink temperature, and maintain the ATLAS at plus 30 degrees Centigrade with 125 watts heat load and minus 93 degrees Centigrade radiator sink temperature. Furthermore, the LTCS must be qualification tested to maintain the ATLAS between plus 10 degrees Centigrade and plus 35 degrees Centigrade. 2) The LTCS must be shut down to ensure that the ATLAS can be maintained above its lowest desirable temperature of minus 2 degrees Centigrade during the survival mode. No software control algorithm for LTCS can be activated during survival and only thermostats can be used. 3) The radiator must be kept above minus 65 degrees Centigrade to prevent ammonia from freezing using no more than 135 watts of heater power. 4) The LHP reservoir control heater power is limited to 15 watts with a 70 percent duty cycle. 5) The voltage of the power supply can vary between 26 volts direct current and 34 volts direct current during the spacecraft lifetime. A design analysis shows that a single LTCS can satisfy these requirements. However, shutdown of· the LHP is particularly challenging and the shutdown heater must be wired in series with two reservoir thermostats and two CCHP thermostats at different set points. An LTCS demonstration unit has been tested to verify these performance characteristics experimentally prior to proceeding to the final LTCS design and fabrication. Test results showed that the LHP shutdown scheme would be able to shut down the LHP as designed and the reservoir control heater can maintain the ATLAS mass simulator within the plus or minus 1 degrees Centigrade accuracy under various combinations of the heat load, sink temperature, and power supply voltage.

Ku, Jentung↗

Establish Fuel Qualification Expectations

The objective of this white paper is to provide an overview of the state of knowledge regarding issues associated with fuel qualification for a liquid-fueled molten salt reactor. The overview consists of fuel qualification expectations for heterogeneous reactors—conventional light water reactors, plus advanced reactors such as sodium fast reactors and modular high-temperature gas-cooled reactors—which consider the mechanical behavior of the fuel itself, interaction between fuel and its cladding, behavior of the cladding, and structural behavior of fuel assemblies. Fuel qualification expectations for molten salt reactors are viewed in contrast to the fuel qualification for heterogeneous reactors in that the fuel is liquid (molten) and there is no accumulation of mechanical effects such as stress, creep, or swelling. However, the liquid fuel salts do accumulate fission products, corrosion byproducts, and buildup of actinides which impact the chemistry of the fuel salt and thermal-physical properties that may impact the ability to remove heat from the core and retain radioactive materials in the fuel salt. Finally, the role of the US Department of Energy in research on tri-structural-isotropic and metal fuel for advanced reactors for fuel qualification purposes is briefly discussed as a potential model for the Department’s research to gather quality chemical and thermal-physical property data necessary to qualify MSR fuel performance under normal and accident conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Combined Qualification Vibration Testing and Fixed Base Modal Testing Utilizing a Fixed Based Correction Method

Vibration testing spaceflight hardware is a vital, but time consuming and expensive endeavor. Traditionally modal tests are performed at the component, subassembly, or system level, preferably free-free with mass loaded interfaces or fixed base on a seismic mass to identify the fundamental structural dynamic (modal) characteristics. Vibration tests are then traditionally performed on single-axis slip tables at qualification levels that envelope the maximum predicted flight environment plus 3 dB and workmanship in order to verify the spaceflight hardware can survive its flight environment. These two tests currently require two significantly different test setups, facilities, and ultimately reconfiguration of the spaceflight hardware. The vision of this research is to show how traditional fixed-base modal testing can be accomplished using vibration qualification testing facilities, which not only streamlines testing and reduces test costs, but also opens up the possibility of performing modal testing to untraditionally high excitation levels that provide for test-correlated finite element models to be more representative of the spaceflight hardware's response in a flight environment. This paper documents the first steps towards this vision, which is the comparison of modal parameters identified from a traditional fixed-based modal test performed on a modal floor and those obtained by utilizing a fixed based correction method with a large single-axis electrodynamic shaker driving a slip table supplemented with additional small portable shakers driving on the slip table and test article. To show robustness of this approach, the test article chosen is a simple linear weldment, whose mass, size, and modal parameters couple well with the dynamics of the shaker/slip table. This paper will show that all dynamics due to the shaker/slip table were successfully removed resulting in true fixed-base modal parameters, including modal damping, being successfully extracted from a traditional style base-shake vibration test setup.

Winkel, James P.↗

AZ-2000-IECW and StaMet Black Kapton Options for Solar Probe Plus MAG Sensor MLI Kevlar/Polyimide Shells

AZ-2000-IECW white paint and StaMet black Kapton have been evaluated for the Kevlar/polyimide shells that enclose the Solar Probe Plus Magnetometer (MAG) sensors and multilayer insulation. Flight qualification testing on AZ-2000-IECW painted Kevlar/polyimide laminate was completed at Goddard Space Flight Center. This paint potentially meets all the requirements. However, it has no flight heritage. StaMet is hotter in the sun, and is specular. The results of the MAG thermal balance test show StaMet meets the thermal requirement and heater power budget. The mission prefers to fly StaMet after evaluating the risks of AZ-2000-IECW flaking and glint from StaMet to the Star Trackers.

AZ-2000-IECW; StaMet Black Kapton; Kevlar/Polyimid↗

Rover Low Gain Antenna Qualification for Deep Space Thermal Environments

A method to qualify the Rover Low Gain Antenna (RLGA) for use during the Mars Science Laboratory (MSL) mission has been devised. The RLGA antenna must survive all ground operations, plus the nominal 670 Martian sol mission that includes the summer and winter seasons of the Mars thermal environment. This qualification effort was performed to verify that the RLGA design, its bonding, and packaging processes are adequate. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed on the RLGA hardware before the start of the qualification test. Functional intermittent RF tests were performed during thermal chamber breaks over the course of the complete qualification test. For the return loss measurements, the RLGA antenna was moved to a test area. A vector network analyzer was calibrated over the operational frequency range of the antenna. For the RLGA, a simple return loss measurement was performed. A total of 2,010 (3 670 or 3 times mission thermal cycles) thermal cycles was performed. Visual inspection of the RLGA hardware did not show any anomalies due to the thermal cycling. The return loss measurement results of the RLGA antenna after the PQV (Package Qualification and Verification) test did not show any anomalies. The antenna pattern data taken before and after the PQV test at the uplink and downlink frequencies were unchanged. Therefore, the developed design of RLGA is qualified for a long-duration MSL mission.

Ramesham, Rajeshuni↗

Qualification of UHF Antenna for Extreme Martian Thermal Environments

The purpose of this development was to validate the use of the external Rover Ultra High Frequency (RUHF) antenna for space under extreme thermal environments to be encountered during the surface operations of the Mars Science Laboratory (MSL) mission. The antenna must survive all ground operations plus the nominal 670 Martian sol mission that includes summer and winter seasons of the Mars thermal environment.The qualification effort was to verify that the RUHF antenna design and its bonding and packaging processes are adequate to survive the harsh environmental conditions. The RUHF is a quadrifilar helix antenna mounted on the MSL Curiosity rover deck. The main components of the RUHF antenna are the helix structure, feed cables, and hybrid coupler, and the high-power termination load. In the case of MSL rover externally mounted hardware, not only are the expected thermal cycle depths severe, but there are temperature offsets between the Mars summer and winter seasons. The total number of temperature cycles needed to be split into two regimes of summer cycles and winter cycles. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed prior to the start of the qualification test. Functional RF tests were performed intermittently during chamber breaks over the course of the qualification test. For the RF return loss measurements, the antenna was tested in a controlled environment outside the thermal chamber with a vector network analyzer that was calibrated over the antenna s operational frequency range. A total of 2,010 thermal cycles were performed. Visual inspection showed a dulling of the solder material. This change will not affect the performance of the antenna. No other changes were observed. RF tests were performed on the RUHF helix antenna, hybrid, and load after the 2,010 qualification cycles test. The RF performance of the RUHF antenna, hybrid, and load were almost identical before and after the complete test. Therefore, the developed design of RUHF is qualified for a long-duration MSL mission. The RUHF antenna has not been used for long-duration missions such as MSL in the past. The state-of-the-art technology of the RUHF antenna is used to develop the antennas for MSL mission survivability. This developmental test data provides the confidence in using this RUHF antenna for future NASA missions to Mars.

Ramesham, Rajeshuni↗

Design and Development of the Space Technology 5 (ST5) Solar Arrays

The National Aeronautics and Space Administration's (NASA's) Space Technology 5 (ST5) is designed to flight-test the concept of miniaturized 'small size" satellites and innovative technologies in Earth's magnetosphere. Three satellites will map the intensity and direction of the magnetic fields within the inner magnetosphere. Due to the small area available for the solar arrays, and to meet the mission power requirements, very high-efficiency multijunction solar cells were selected to power the spacecraft built by NASA Goddard Space Flight Center (GSFC). This was done in partnership with the Air Force Research Lab (AFRL) through the Dual-Use Science and Technology (DUS&T) program. Emcore's InGaP/lnGaAs/Ge Advanced triple-junction (ATJ) solar cells, exhibiting an average air mass zero (AMO) efficiency of 28.0% (one-sun, 28 C), were used to populate the arrays. Each spacecraft employs 8 identical solar panels (total area of about 0.3 square meters), with 15 large-area solar cells per panel. The requirement for power is to support on-orbit average load of 13.5 W at 8.4 V, with plus or minus 5% off pointing. The details of the solar array design, development and qualification considerations, as well as ground electrical performance & shadowing analysis results are presented.

Lyons, John↗

Marshall Space Flight Center's Solar Wind Facility

Historically, NASA's Marshall Space Flight Center (MSFC) has operated a Solar Wind Facility (SWF) to provide long term particle and photon exposure to material samples. The requirements on the particle beam details were not stringent as the cumulative fluence level is the test goal. Motivated by development of the faraday cup instrument on the NASA Solar Probe Plus (SPP) mission, the MSFC SWF has been upgraded to included high fidelity particle beams providing broadbeam ions, broadbeam electrons, and narrow beam protons or ions, which cover a wide dynamic range of solar wind velocity and flux conditions. The large vacuum chamber with integrated cryo-shroud, combined with a 3-axis positioning system, provides an excellent platform for sensor development and qualification. This short paper provides some details of the SWF charged particle beams characteristics in the context of the Solar Probe Plus program requirements. Data will be presented on the flux and energy ranges as well as beam stability.

Wright, K. H.↗

Refinement of Objective Motion Cueing Criteria Investigation Based on Three Flight Tasks

The objective of this paper is to refine objective motion cueing criteria for commercial transport simulators based on pilots' performance in three flying tasks. Actuator hardware and software algorithms determine motion cues. Today, during a simulator qualification, engineers objectively evaluate only the hardware. Pilot inspectors subjectively assess the overall motion cueing system (i.e., hardware plus software); however, it is acknowledged that pinpointing any deficiencies that might arise to either hardware or software is challenging. ICAO 9625 has an Objective Motion Cueing Test (OMCT), which is now a required test in the FAA's part 60 regulations for new devices, evaluating the software and hardware together; however, it lacks accompanying fidelity criteria. Hosman has documented OMCT results for a statistical sample of eight simulators which is useful, but having validated criteria would be an improvement. In a previous experiment, we developed initial objective motion cueing criteria that this paper is trying to refine. Sinacori suggested simple criteria which are in reasonable agreement with much of the literature. These criteria often necessitate motion displacements greater than most training simulators can provide. While some of the previous work has used transport aircraft in their studies, the majority used fighter aircraft or helicopters. Those that used transport aircraft considered degraded flight characteristics. As a result, earlier criteria lean more towards being sufficient, rather than necessary, criteria for typical transport aircraft training applications. Considering the prevalence of 60-inch, six-legged hexapod training simulators, a relevant question is "what are the necessary criteria that can be used with the ICAO 9625 diagnostic?" This study adds to the literature as follows. First, it examines well-behaved transport aircraft characteristics, but in three challenging tasks. The tasks are equivalent to the ones used in our previous experiment, allowing us to directly compare the results and add to the previous data. Second, it uses the Vertical Motion Simulator (VMS), the world's largest vertical displacement simulator. This allows inclusion of relatively large motion conditions, much larger than a typical training simulator can provide. Six new motion configurations were used that explore the motion responses between the initial objective motion cueing boundaries found in a previous experiment and what current hexapod simulators typically provide. Finally, a sufficiently large pilot pool added statistical reliability to the results.

motion simulation↗

Qualification of Fiber Optic Cables for Martian Extreme Temperature Environments

Means have been developed for enabling fiber optic cables of the Laser Induced Breakdown Spectrometer instrument to survive ground operations plus the nominal 670 Martian conditions that include Martian summer and winter seasons. The purpose of this development was to validate the use of the rover external fiber optic cabling of ChemCam for space applications under the extreme thermal environments to be encountered during the Mars Science Laboratory (MSL) mission. Flight-representative fiber optic cables were subjected to extreme temperature thermal cycling of the same diurnal depth (or delta T) as expected in flight, but for three times the expected number of in-flight thermal cycles. The survivability of fiber optic cables was tested for 600 cumulative thermal cycles from -130 to +15 C to cover the winter season, and another 1,410 cumulative cycles from -105 to +40 C to cover the summer season. This test satisfies the required 3 times the design margin that is a total of 2,010 thermal cycles (670 x 3). This development test included functional optical transmission tests during the course of the test. Transmission of the fiber optic cables was performed prior to and after 1,288 thermal cycles and 2,010 thermal cycles. No significant changes in transmission were observed on either of the two representative fiber cables subject through the 3X MSL mission life that is 2,010 thermal cycles.

Ramesham, Rajeshuni↗