Practical Residential Wall Systems: R-30 and Beyond
This paper focuses on three of the most practical high-performance wall systems to achieve whole-wall performance of R-30 or above.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This paper focuses on three of the most practical high-performance wall systems to achieve whole-wall performance of R-30 or above.
The team led by Dow Corning collaborated to increase the thermal performance of exterior insulation and finishing systems (EIFS) to reach R-40 performance meeting the needs for high efficiency insulated walls. Additionally, the project helped remove barriers to using EIFS on retrofit commercial buildings desiring high insulated walls. The three wall systems developed within the scope of this project provide the thermal performance of R-24 to R-40 by incorporating vacuum insulation panels (VIPs) into an expanded polystyrene (EPS) encapsulated vacuum insulated sandwich element (VISE). The VISE was incorporated into an EIFS as pre-engineered insulation boards. The VISE is installed using typical EIFS details and network of trained installers.
A high-performance wall system is under development to improve wall thermal performance to a level of U-factor of 0.19 W/(m2 K) (R-30 [h ft2 F]/Btu) in a standard wall thickness by incorporating vacuum insulation panels (VIPs) into an exterior insulation finish system (EIFS). Such a system would be applicable to new construction and will offer a solution to more challenging retrofit situations as well. Multiple design options were considered to balance the need to protect theVIPs during construction and building operation, while minimizing heat transfer through the wall system. The results reported here encompass an indepth assessment of potential system performances including thermal modeling, detailed laboratory measurements under controlled conditions on the component, and system levels according to ASTM C518 (ASTM 2010). The results demonstrate the importance of maximizing the VIP coverage over the wall face. The results also reveal the impact of both the design and execution of system details, such as the joints between adjacent VIPs. The test results include an explicit modeled evaluation of the system performance in a clear wall.
TO4 8.2.2: Space Cond. for Deep Energy Retrofits The purpose of this project for the New York State Energy Research and Development Authority (NYSERDA) is to find new or improved strategies for exterior building solutions in regard to insulation that will provide extensive energy-savings benefits for homeowners. Deep energy retrofits (DER) is one of the solutions. In the past, DERs have been expensive and hard for the average homeowner to budget. The DER solutions that IBACOS and GreenHomes America (GHA) are proposing will be market friendly, affordable, and easily repeatable. The insulation strategies that will be used on nine test homes include the following: - Rigid foam insulation - Four homes will have approximate center-of-wall R-values of R-28, including furring strips for siding, with additional systems approach work to supply the complete integrated DER solution. - Spray foam insulation - Four homes will have approximate center-of-wall R-values of R-30, with additional systems approach work to supply the complete integrated DER solution. - HPwES upgrade - One home will include criteria from the Home Performance with ENERGY STAR (HPwES) program, including dense pack walls and window upgrades for this retrofit strategy. In addition to the insulation, the strategies will include treatment where needed in the attic, mechanical systems, ventilation and basement band joist, walls, and floors.
A builder (K. Hovnanian® Homes®), design consultant, and trades collaborated to identify a systems integrated measures package for a 2,253-ft 2 slab-on-grade ranch house to achieve a modeled energy savings of 60% with respect to the Building America House Simulation Protocols, while minimizing construction costs and without requiring changes to the drawing that would impact local code or zoning approval. The key building improvements were applying R-10 insulation to the slab edge, increasing exterior wall cavity insulation from R-13 to R-15, and increasing attic insulation from R-30 to R-38. Also, the air handling unit was relocated from the attic to conditioned space, and ductwork was relocated along the attic floor with an insulated bulkhead built above it. Short-term testing results showed that duct air leakage was low due to short duct runs and the placement of ductwork in conditioned space. However, during commissioning, the lack of access for servicing the ductwork and dampers in the bulkhead area prevented retroactive balancing of individual branches, resulting in significant differences between specified and measured airflow values for some duct runs. Thermal imaging results performed on the house when operating in both heating and cooling modes validated historic stratification issues of ceiling supply registers with high supply air temperatures. Long-term monitoring results will be detailed in a future report.
A builder (K. Hovnanian Homes), design consultant, and trades collaborated to identify a systems integrated measures package for a 2,253-ft2 slab-on-grade ranch house to achieve a modeled energy savings of 60% with respect to the Building America House Simulation Protocols (Hendron, R. and Engebrecht, C. 'Building America House Simulation Protocols.' Golden, CO: National Renewable EnergyLaboratory, 2010) while minimizing construction costs and without requiring changes to the drawing that would impact local code or zoning approval. The key building improvements were applying R-10 insulation to the slab edge, increasing exterior wall cavity insulation from R-13 to R-15, and increasing attic insulation from R-30 to R-38. Also, the air handling unit was relocated from the attic toconditioned space, and ductwork was relocated along the attic floor with an insulated bulkhead built above it. Short-term testing results showed that duct air leakage was low due to short duct runs and the placement of ductwork in conditioned space. However, during commissioning, the lack of access for servicing the ductwork and dampers in the bulkhead area prevented retroactive balancing ofindividual branches, resulting in significant differences between specified and measured airflow values for some duct runs. Thermal imaging results performed on the house when operating in both heating and cooling modes validated historic stratification issues of ceiling supply registers with high supply air temperatures. Long-term monitoring results will be detailed in a future report.