Search NASA⌕ Search

SEARCH · Search NASA

Results for “REACTOR MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modernizing the Legacy Fission Wire Measurement System for the Advanced Test Reactor-Critical Facility

Operational lifetime extensions of existing research reactors have emphasized the need for refurbishment, replacements, and upgrades to supporting equipment and instrumentation. The Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), which entered service in 1967, has recently completed the sixth core internals change-out and has scheduled operations until at least 2040. Reactor maintenance and operational risk management is critically important in the research reactor community, however supporting measurement systems sometimes get overlooked when maintenance is planned. The Fission Wire Measurement System (FWMS) is a custom measurement system designed in the 1960s to measure the beta-particle activity of irradiated uranium-aluminum fission wires. This measurement is conducted to determine the fission rate profile of the Advanced Reactor Test Critical (ATR-C) facility. The ATR-C is an open-pool, low-power test reactor that was purpose driven to resemble ATR and is used to qualify experiment configurations and verify core models prior to full-power experiment irradiations in ATR. A power distribution measurement in ATR-C uses uranium-aluminum wires that are distributed throughout the ATR-C core to validate simulation and modeling results. These measurements require 340 to 1500 wires to be irradiated and measured within a 12-hour window. The activity of the wires is measured in the required time with the FWMS, which was put into service in 1965 at the Radiation Measurements Laboratory (RML). The system consists of 4 measurement channels and one reference channel, each with a 2-pi proportional gas flow detector and the measurement channels each have an automated sample changer. This legacy system is crucial to the continued operations of ATR and has undergone some minor hardware upgrades since 1965, however the system presently relies on custom control boards, custom gas ion chambers, analog amplifiers/discriminators, and a user interface (UI) for the system written in outdated code. Much of the equipment and software is custom with no commercial replacements or support and limited documentation. The existing control software requires an operating system that is no longer supported, creating more vulnerabilities to continued operations. A project is underway with a third-party vendor to design, build, and document a new control and data acquisition system (CDAS) for the FWMS. The new upgrade will replace the control system, computer, UI, sample changer motors, and main power supply while maintaining the interface with existing detector hardware. The upgraded system will be operated in parallel with the current hardware and software to conduct validation testing. This equipment upgrade demonstrates the commitment at ATR to ensuring successful operations and potential future research reactors at INL.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Human factors case study: An iterative approach to verifying and validating a new suite of reactor inspection and maintenance tooling - 177

An iterative approach was taken to perform the HF Verification and Validation (V and V) activities for a complex set of reactor inspection and maintenance tooling equipment known as the Bruce Reactor Inspection and Maintenance System (BRIMS). This paper is divided into the verification activities (of Human System Information Task Support and Design verifications) and the validation activities. The validation method used a graded approach by breaking validation activities into early usability testing and high fidelity validations. Early usability testing, allowed for issues and design concepts to be identified and explored. High fidelity validation activities tested that the final design requirements and operational goals of the system were met in the production equipment. The validation method has been described in detail by depicting the following: task selection criteria, tools, performance measures and data collection. Validation results demonstrate the benefits of the graded approach as issues were to be identified early in the design process, improvements were made during detailed design and additional testing could confirm that issues were resolved prior to commissioning. To capture and share the success of this iterative V and V approach lessons learned have been created for use in future V and V projects. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Maintenance strategy, structural design, and site layout of the ST-E1 fusion power plant

An effective fusion reactor maintenance scheme enables safe operations and short downtimes. This in turn leads to high availability, which is critical to the commercial viability of a power-producing plant. In tokamak-based fusion power plants, the chosen maintenance approach has a significant impact on the spatial design of the tokamak, as well as the surrounding infrastructure, and therefore needs to be considered from the outset. Tokamak Energy has developed a pre-concept design of a fusion power plant, ST-E1. This work describes the major drivers and constraints that have been considered, presents the tokamak architecture and chosen maintenance regime, and discusses how this enables the plant’s two-phased approach to demonstrating commercial operations. It also shows the implications for the design of other systems areas, in particular the machine structural arrangement and bioshield and hot cell layout. The reactor core segmentation and removal scheme replaces entire toroidal segments radially through a large vacuum port, along a single axis only. The result is a change-tolerant machine and plant layout that can accommodate the evolving designs of the tokamak.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Plant maintenance and advanced reactors issue, 2008

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Semi-Annual Report on Work Supporting the International Forum for Reactor Aging Management (IFRAM)

During the first six months of this project, Pacific Northwest National Laboratory has provided planning and leadership support for the establishment of the International Forum for Reactor Aging Management (IFRAM). This entailed facilitating the efforts of the Global Steering Committee to prepare the charter, operating guidelines, and other documents for IFRAM. It also included making plans for the Inaugural meeting and facilitating its success. This meeting was held on August 4 5, 2011, in Colorado Springs, Colorado. Representatives from Asia, Europe, and the United States met to share information on reactor aging management and to make plans for the future. Professor Tetsuo Shoji was elected chairperson of the Leadership Council. This kick-off event transformed the dream of an international forum into a reality. On August 4-5, 2011, IFRAM began to achieve its mission. The work completed successfully during this period was built upon important previous efforts. This included the development of a proposal for establishing IFRAM and engaging experts in Asia and Europe. The proposal was presented at Engagement workshops in Seoul, Korea (October 2009) and Petten, The Netherlands (May 2010). Participants in both groups demonstrated strong interest in the establishment of IFRAM. Therefore, the Global Steering Committee was formed to plan and carry out the start-up of IFRAM in 2011. This report builds on the initial activities and documents the results of activities over the last six months.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Proposed NRCDA Groundwater Pathway Conceptual Model

As requested by Solid Waste Management (SWM), this report documents the Savannah River National Laboratory’s (SRNL’s) evaluation of updated Naval Reactor waste container and inventory projections and proposes a Naval Reactor Component Disposal Area (NRCDA) groundwater (GW) pathway modeling approach for the next E-Area Low-Level Waste Facility (LLWF) Performance Assessment (PA). Two areas within the E-Area LLWF are used as disposal sites for reactor components from the U.S. Navy. Currently, components arrive by rail and are moved by crane to the 643-26E at-grade gravel disposal pad. Prior to operational closure, reactor components were stored and ultimately disposed in-place on the 643-7E NRCDA (Wilhite and Flach 2004). Naval Reactor (NR) waste is comprised of highly radioactive components consisting of activated corrosion-resistant metal alloy contained within welded thick steel casks, and auxiliary equipment primarily contaminated with Activated Corrosion Products (sometimes referred to as “crud” by the U.S. Navy) at low levels and contained within thinner-walled bolted containers. The 643-7E disposal pad, which contains 41 casks and has an interim soil cover, is closed to future receipts. The latest NR waste projections for the 643-26E disposal pad are substantially different from the original estimates due to a change in reactor maintenance. The original estimate was for 50 heavily shielded, welded casks and 50 thinner-walled bolted containers (primarily shield blocks). Currently, NR Programs project 33 heavily shielded, welded casks, of which 31 are already in-place on the 643-26E pad, and 381 thinner-walled bolted containers. In addition to new waste form projections, there have been changes in facility layout and closure plans as well as PA modeling improvements. This report documents these changes as well as key NRCDA recommendations from the 2015 PA Strategic Plan (Butcher 2016).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Record of Technical Change for Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

54 ENVIRONMENTAL SCIENCES↗

Proceedings of the 2012 International Congress on Advances in National Power Plants - ICAPP '12

ICAPP '12 provides a forum for leaders of the nuclear industry to exchange information, present results from their work, review the state of the industry, and discuss future directions and needs for the deployment of new nuclear power plant systems around the world. These proceedings gather 326 papers covering the following topics: 1. Water-Cooled Reactor Programs; 2. High Temperature Gas Cooled Reactors; 3. LMFR and Innovative Reactor Programs; 4. Operation, Performance and Reliability Management; 5. Plant Safety Assessment and Regulatory Issues; 6. Reactor Physics and Analysis; 7. Thermal Hydraulics Analysis and Testing; 8. Fuel Cycle and Waste Management; 9. Materials and Structural Issues; 10. Nuclear Energy and Global Environment; 11. Deployment and Cross-Cutting Issues; 12. Plant Licensing and International Regulatory Issues.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Remote Maintenance Molten Salt Reactors

Video shows a demonstration of replacing the major components of a molten salt reactor mock-up built by ORNL in the late 1950s - early 1960s using remote handling technology.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Build-to-Replace Strategy to Reduce Operations and Maintenance Costs for Advanced Reactors

This paper targets the reduction of fixed operations and maintenance (O&M) costs for advanced reactor (AR) designs. This goal will be severely constrained if the underlying assumptions of O&M approaches and practices are not questioned and reexamined, especially today when changes can be implemented effectively and efficiently. Achieving a reduction in AR O&M costs requires a completely new way of thinking -a paradigm shift- not through incremental, technology-focused approaches alone. Here, we address this challenge by evaluating the impact of moving to a shorter design life for major structures, systems, and components and shorter, more predictable refurbishment cycles as modeled by the commercial airline industry: the build-to-replace approach. This paper provides a brief overview of this different mindset to O&M applied to ARs and it provided a set of analytical tools based on multi-objective optimization to identify the benefits of such an approach. In conclusion, we provide a direct example analysis of a build-to-replace scenario by identifying and evaluating scenarios for reduced system and component lifetimes and associated replacement and refurbishment schedules to evaluate impacts on O&M costs and other lifecycle elements, such as structure, system, and component reliability.

97 - MATHEMATICS AND COMPUTING↗

Remote In-bore Laser Cutting and Welding Tools for use in Future Nuclear Fusion Reactors - 18348

The maintenance, replacement and decommissioning of future nuclear fusion reactors will require quick and reliable cutting and joining of in-vessel pipework. Initial design studies for nuclear fusion reactors for power generation have estimated cutting and welding could account for up to 60% of the maintenance duration using conventional in-situ processing techniques (dry-mechanical cutting and arc welding) and that new methods are required to expedite the process. Additionally, the expected radioactivity and limited access at the cutting and welding sites mean that these processes cannot be done manually and robotic tools are required. To this end, remote in-bore laser cutting and welding tools have been developed for use in 90 mm internal diameter steel pipes. Here, we will present the designs of the remote in-bore laser cutting and welding tools, and how the tools fit within the overall remote maintenance strategy of a nuclear fusion reactor. Initial high-power laser trials were performed with prototype tools which successfully demonstrated their laser processing, thermal management and dust protection functionality. Although the tools described herein have been developed specifically for use within the fusion reactor environment, however the tool design and technology demonstrated here is readily transferable to many remote applications in challenging environments such as fission reactor maintenance, nuclear decommissioning and other in-accessible pipework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Graphite Dust Deposition on HTGR Steam Generator: Effect of Particle-wall Impact - 18520

Generated by abrasion of fuel spheres, graphite dust is an important issue for the operation and maintenance of high-temperature gas-cooled reactor (HTGR), since the transport of fission product is closely coupled with graphite dusts. AVR experiments on dust specific radioactivity indicate that graphite dust deposition on steam generator (SG) should be of special interest. Most previous simulations on graphite dust deposition assume a hit-and-stick nature for particles, which may overestimate the deposition rate. In this work we uses a critical velocity model to account for particle-wall interaction. Combined with computational fluid dynamics simulation and discrete phase method, the deposition of graphite dust in the upper 22 layers of SG tubes was studied with particle-wall interaction considered. The result shows that the deposition rate is highly overestimated if hit-and-stick is assumed. For particles larger than 5 {mu}m, the difference can be as large as 3 times. Particle deposition rate reaches maximum at about 3 {mu}m. As for the spatial distribution, few particles deposit on the first layer of tubes due to relative low Stokes number while more depositions occur after entering bundle zone, which indicates that the unsteady wake among tubes could be a major mechanism for the deposition. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Remote operations and maintenance framework for molten salt reactors

Remote, highly-automated operations and maintenance is key for economically successful deployment of molten salt reactors (MSRs). Liquid-fueled MSRs will have high dose rates within containment following initial start-up due to the proximity of the fuel salt and gaseous fission products. The challenges of performing O&M in high dose environments has long been recognized and many of the required technology components have been developed for use in similar high radiation environments.Future MSRs will need to have much lower labor costs than existing nuclear power plants to be competitive. The advance of digital technologies provides the opportunity to automate maintenance activities. Advances in modeling and simulation (M&S) may enable shifting the role of the operator from remotely performing tasks to overseeing automated systems. Dynamically updating a plant’s digital twin representation through integrating multiple sensor signals will be key to automating complex process tasks. Complex, highly-automated maintenance in high-radiation areas has not been previously proven and adequate demonstration will be required to validate its performance.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Topics in nuclear power

The 101 nuclear plants operating in the US today are far safer than they were 20-30 years ago. For example, there's been about a 100-fold reduction in the occurrence of 'significant events' since the late 1970s. Although the youngest of currently operating US plants was designed in the 1970s, all have been significantly modified over the years. Key contributors to the safety gains are a vigilant culture, much improved equipment reliability, greatly improved training of operators and maintenance workers, worldwide sharing of experience, and the effective use of probabilistic risk assessment. Several manufacturers have submitted high quality new designs for large reactors to the U.S. Nuclear Regulatory Commission (NRC) for design approval, and several companies are vigorously working on designs for smaller, modular reactors. Although the Fukushima reactor accident in March 2011 in Japan has been an almost unmitigated disaster for the local population due to their being displaced from their homes and workplaces and also due to the land contamination, its 'lessons learned' have been important for the broader nuclear industry, and will surely result in safer nuclear plants worldwide - indeed, have already done so, with more safety improvements to come.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

On-line monitoring for static and dynamic performance verification of I and C systems at Sizewell B nuclear power station - 329

Plant operations and maintenance (O and M) activities account for nearly 75% of the generation cost of a modern nuclear power plant (NPP). This is largely due to time-based maintenance strategies that are expensive, time-consuming, prone to error, and sometimes detrimental to plant equipment. In contrast, condition-based maintenance via on-line monitoring (OLM) can reduce costs, increase equipment availability, and improve safety. OLM uses signals from existing plant sensors to verify the performance of plant instrumentation and equipment while the plant is operating. The Sizewell B nuclear power station in the United Kingdom, a four-loop pressurized water reactor (PWR), uses OLM techniques for several condition-based performance verification activities including pressure, level, and flow transmitter calibration monitoring, resistance temperature detector (RTD) cross calibration, and dynamic performance monitoring of pressure, level, and flow sensing systems. The implementation of OLM has enabled the plant to extend the calibration intervals of its pressure, level, and flow transmitters from 18 to 54 months and has significantly reduced the amount of critical path time needed to perform RTD cross calibration testing (up to 36 hours). Dynamic performance monitoring of its pressure, level, and flow transmitters with OLM has enabled the plant to monitor transmitter and sensing line response degradation while the plant is operating at 100% power and has dramatically reduced testing time versus the traditional hydraulic ramp testing method. The Sizewell B OLM implementation provides valuable insights into on how to overcome the technical and regulatory challenges for widespread OLM adoption by the nuclear industry. This paper describes the technical and regulatory aspects of this implementation and includes detailed examples of static and dynamic performance testing results to demonstrate the types of capabilities of OLM. Analyzing existing signals with OLM technologies can provide significant cost and safety benefits for the existing fleet of nuclear power plants. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗