Search NASA⌕ Search

SEARCH · Search NASA

Results for “RECEIPTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Mission Operations Center (MOC) - Precipitation Processing System (PPS) Interface Software System (MPISS)

MPISS is an automatic file transfer system that implements a combination of standard and mission-unique transfer protocols required by the Global Precipitation Measurement Mission (GPM) Precipitation Processing System (PPS) to control the flow of data between the MOC and the PPS. The primary features of MPISS are file transfers (both with and without PPS specific protocols), logging of file transfer and system events to local files and a standard messaging bus, short term storage of data files to facilitate retransmissions, and generation of file transfer accounting reports. The system includes a graphical user interface (GUI) to control the system, allow manual operations, and to display events in real time. The PPS specific protocols are an enhanced version of those that were developed for the Tropical Rainfall Measuring Mission (TRMM). All file transfers between the MOC and the PPS use the SSH File Transfer Protocol (SFTP). For reports and data files generated within the MOC, no additional protocols are used when transferring files to the PPS. For observatory data files, an additional handshaking protocol of data notices and data receipts is used. MPISS generates and sends to the PPS data notices containing data start and stop times along with a checksum for the file for each observatory data file transmitted. MPISS retrieves the PPS generated data receipts that indicate the success or failure of the PPS to ingest the data file and/or notice. MPISS retransmits the appropriate files as indicated in the receipt when required. MPISS also automatically retrieves files from the PPS. The unique feature of this software is the use of both standard and PPS specific protocols in parallel. The advantage of this capability is that it supports users that require the PPS protocol as well as those that do not require it. The system is highly configurable to accommodate the needs of future users.

Ferrara, Jeffrey↗

Circuit counts pulses and indicates time of occurrence of slow pulses

Counter includes one section which counts the first several pulses, and a second section which counts pulses from a clock between the beginning of a sampling interval and the receipt of the first pulse by the circuit. The number of clock pulses indicates receipt time of the first pulse.

Baumer, W. E.↗

Experiment definition phase shuttle laboratory. LDRL-10.6 experiment

The work completed on the experiment definition phase of the shuttle laboratory LDRL 10.6 micrometers experiment from 27 September 1975 to 26 January 1976 was reported. This work included progress in the following areas: (1) optomechanical system: completion of detail drawings, completion of the beryllium subassembly, fabrication, checking, and weighing of approximately 95% of the detailed parts, dry film lubrication of the bearings and gears, and initiation of assembly of the gimbals; (2) optics: update of the detailed optical layout, receipt of nine mirrors and the pre-expander; (3) miscellaneous: delivery of draft material for the final report, completion of optical testing of the 10.6 micrometers receiver, and receipt, assembly, and checkout of NASA test console.

Source record↗

Remote water monitoring system

A remote water monitoring system is described that integrates the functions of sampling, sample preservation, sample analysis, data transmission and remote operation. The system employs a floating buoy carrying an antenna connected by lines to one or more sampling units containing several sample chambers. Receipt of a command signal actuates a solenoid to open an intake valve outward from the sampling unit and communicates the water sample to an identifiable sample chamber. Such response to each signal receipt is repeated until all sample chambers are filled in a sample unit. Each sample taken is analyzed by an electrochemical sensor for a specific property and the data obtained is transmitted to a remote sending and receiving station. Thereafter, the samples remain isolated in the sample chambers until the sampling unit is recovered and the samples removed for further laboratory analysis.

Grana, D. C.↗

Space Station Freedom NiH2 cell testing program

Testing for the Space Station Freedom Nickel Hydrogen Cell Test Program began in 1990 at Crave Division, Naval Surface Warfare Center. The program has included receipt inspection, random vibration, acceptance, characterization, and life cycle testing of Ni-H2 cells in accordance with the NASA LeRC Interagency Order C-31001-J. A total of 400 Ni-H2 cells have been received at NAVSURFWARCENDIV Crane from three separate manufacturers; Yardney Technical Products (Yardney), Eagle Picher Industries (Eagle Picher), and Gates Energy Products (Gates). Of those, 308 cells distributed among 39 packs have undergone life cycle testing under a test regime simulating low earth orbit conditions. As of 30 September 1993, there are 252 cells assembled into 32 packs still on life cycle test. Since the beginning of the program, failed cells have been detected in all phases of testing. The failures include the following; seven 65 AmpHr and 81 AmpHr Yardney cells were found to be leaking KOH on receipt, one 65 AmpHr Eagle Picher cell failed the acceptance test, one 65 AmpHr Gates cell failed during the characterization test, and six 65 AmpHr Gates cells failed the random vibration test. Of the 39 life cycle packs, testing on seven packs, 56 cells, has been suspended because of low end of discharge voltages. All of the failed life cycle packs were cycled at 60% depth of discharge.

Moore, Bruce↗

The development and operation of the international solar-terrestrial physics central data handling facility

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) International Solar-Terrestrial Physics (ISTP) Program is committed to the development of a comprehensive, multi-mission ground data system which will support a variety of national and international scientific missions in an effort to study the flow of energy from the sun through the Earth-space environment, known as the geospace. A major component of the ISTP ground data system is an ISTP-dedicated Central Data Handling Facility (CDHF). Acquisition, development, and operation of the ISTP CDHF were delegated by the ISTP Project Office within the Flight Projects Directorate to the Information Processing Division (IPD) within the Mission Operations and Data Systems Directorate (MO&DSD). The ISTP CDHF supports the receipt, storage, and electronic access of the full complement of ISTP Level-zero science data; serves as the linchpin for the centralized processing and long-term storage of all key parameters generated either by the ISTP CDHF itself or received from external, ISTP Program approved sources; and provides the required networking and 'science-friendly' interfaces for the ISTP investigators. Once connected to the ISTP CDHF, the online catalog of key parameters can be browsed from their remote processing facilities for the immediate electronic receipt of selected key parameters using the NASA Science Internet (NSI), managed by NASA's Ames Research Center. The purpose of this paper is twofold: (1) to describe how the ISTP CDHF was successfully implemented and operated to support initially the Japanese Geomagnetic Tail (GEOTAIL) mission and correlative science investigations, and (2) to describe how the ISTP CDHF has been enhanced to support ongoing as well as future ISTP missions. Emphasis will be placed on how various project management approaches were undertaken that proved to be highly effective in delivering an operational ISTP CDHF to the Project on schedule and within budget. Examples to be discussed include: the development of superior teams; the use of Defect Causal Analysis (DCA) concepts to improve the software development process in a pilot Total Quality Management (TQM) initiative; and the implementation of a robust architecture that will be able to support the anticipated growth in the ISTP Program science requirements with only incremental upgrades to the baseline system. Further examples include the use of automated data management software and the implementation of Government and/or industry standards, whenever possible, into the hardware and software development life-cycle. Finally, the paper will also report on several new technologies (for example, the installation of a Fiber Data Distribution Interface network) that were successfully employed.

Lehtonen, Kenneth↗

Modified Mean-Pyramid Coding Scheme

Modified mean-pyramid coding scheme requires transmission of slightly fewer data. Data-expansion factor reduced from 1/3 to 1/12. Schemes for progressive transmission of image data transmitted in sequence of frames in such way coarse version of image reconstructed after receipt of first frame and increasingly refined version of image reconstructed after receipt of each subsequent frame.

Cheung, Kar-Ming↗

Computerized tomography calibrator

A set of interchangeable pieces comprising a computerized tomography calibrator, and a method of use thereof, permits focusing of a computerized tomographic (CT) system. The interchangeable pieces include a plurality of nestable, generally planar mother rings, adapted for the receipt of planar inserts of predetermined sizes, and of predetermined material densities. The inserts further define openings therein for receipt of plural sub-inserts. All pieces are of known sizes and densities, permitting the assembling of different configurations of materials of known sizes and combinations of densities, for calibration (i.e., focusing) of a computerized tomographic system through variation of operating variables thereof. Rather than serving as a phanton, which is intended to be representative of a particular workpiece to be tested, the set of interchangeable pieces permits simple and easy standardized calibration of a CT system. The calibrator and its related method of use further includes use of air or of particular fluids for filling various openings, as part of a selected configuration of the set of pieces.

Engel, Herbert P.↗

Ball Screw Actuator Including a Stop with an Integral Guide

An actuator includes a housing assembly, a ball nut, a ball screw, and a ball screw stop. The ball nut is rotationally mounted in the housing assembly, is adapted to receive an input torque, and is configured, upon receipt thereof, to rotate and supply a drive force. The ball screw is mounted within the housing assembly and extends through the ball nut. The ball screw has a first end and a second end, and is coupled to receive the drive force from the ball nut. The ball screw is configured, upon receipt of the drive force, to selectively translate between a stow position and a deploy position. The ball screw stop is mounted on the ball screw to translate therewith and is configured to at selectively engage the housing assembly while the ball screw is translating, and engage the ball nut when the ball screw is in the deploy position.

Wingett, Paul T.↗

A PI’s Guide to Analog Research

Congratulation on being awarded a grant to conduct research in a spaceflight analog! NASA funded research in a Human Research Program (HRP) managed analog environment is very different from research in a traditional laboratory. This presentation will provide a guide to help investigators successfully plan studies for integration and implementation in an HRP analog platform. There are many things to consider when planning a study for implementation in an analog facility and campaign or mission. How do you get from grant approval to data analysis? This is where HRP’s Research Operations and Integration (ROI) team comes in. The ROI team works with sponsoring HRP elements and PI teams to capture requirements and help the PI teams through the phases of research complement development, integration and implementation. A complement is comprised of a group of studies requiring a common platform and/or scenario that are able to be integrated on a noninterference basis for implementation. Properly defining and documenting requirements and study needs is crucial in successful integration and implementation. This presentation will outline and provide the information needed for PI teams to understand the integration process and the role of the ROI team in the successful integration and implementation of their study. Topics to be discussed will include but not be limited to science requirement definition and documentation, NASA IRB submissions, subject recruitment, screening and selection, study integration process, efficiency in data collection and data sharing, daily crew schedules, hardware and software shipping, receipt and checkout, biological sample collection, mission support, data management and receipt of data.

B. Caldwell↗

Monte Carlo direct view factor and generalized radiative heat transfer programs

Computer programs find the direct view factor from one surface segment to another using the Monte carlo technique, and the radioactive-transfer coefficients between surface segments. An advantage of the programs is the great generality of problems treatable and rapidity of solution from problem conception to receipt of results.

Mc Williams, J. L.↗

Nimbus 4/IRLS Balloon Interrogation Package (BIP)

The balloon interrogation package (BIP), an integral part of the overall interrogation, recording, and location subsystems (IRLS) for the Nimbus 4 program, is described. The BIP is a self-contained, integrated transponder designed to be carried aloft by a constant altitude, superpressure balloon to an altitude of 67,000 or 78,000 feet. After launch the BIP senses high-altitude balloon overpressure and temperature, and upon receipt of an interrogated command from the IRLS aboard the Nimbus 4 satellite, the BIP enodes the data on a real-time basis into a pulse-code modulation (PCM) format and transmits this data to the satellite. A summary of the program activity to produce 30 BIP systems and to support balloon launches from Ascension Island is presented.

Source record↗

The practical application of mishap data in Army aircraft system safety programs

The means are discussed by which the the United States Army Board for Aviation Accident Research (USABAAR) now utilizes the vast store of historical accident data in the application of the system safety concept for developmental aircraft. USABAAR serves as the central agency for the Army Accident Prevention Program which includes the receipt, processing, and analysis of all data and information related to Army aircraft accident experience. It is pointed out that methods which served the cause of accident prevention so well in the past are no longer adequate and that traditional parameters used to measure mishap experience have become obsolete. USABAAR has developed, and recently put into use, completely revised accident reporting forms which greatly expand the scope and detail of information provided as a result of investigation. This and other factors which have resulted in an improved data system are discussed in detail.

James T. Darrah, Jr↗

Inventory of forest and rangeland and detection of forest stress

The author has identified the following significant results. Seventy-two ground sensors were interfaced with three DCP'S at the Black Hills test site. Unfortunately, the transmitters had to be returned for modification and forestry sensed data is not available. The DCP's did operate properly from the Berkeley laboratory and data were recovered from the Goldstone and Alaska stations via Goddard. Replicated training sets and test sets have been selected from all three test site areas in preparation for the receipt of ERTS imagery and digital tapes. From 600 and 800 points have been selected at each site location and UTM coordinates determined. Templates are being made of these sets. As of September 1, ERTS-generated data had not been received and no statements can be made regarding quality or suitability for forest and range experiments. Aerial photography (scale 1:32,000) of the Manitou (226 C) and Black Hills (226 A) sites was taken with CIR in June. Various scales (1:2,000; 1:10,000; 1:20,000; and 1:40,000) of 70 mm photographs were obtained at Manitou with normal color, CIR, and panchromatic in August.

Heller, R. C.↗

Logistics hardware and services control system

Software system permits onsite direct control of logistics operations, which include spare parts, initial installation, tool control, and repairable parts status and control, through all facets of operations. System integrates logistics actions and controls receipts, issues, loans, repairs, fabrications, and modifications and assets in predicting and allocating logistics parts and services effectively.

Koromilas, A.↗

Facilitating the exploitation of ERTS imagery using snow enhancement techniques

The author has identified the following significant results. Analysis of all available (Gemini, Apollo, Nimbus, NASA aircraft) small scale snow covered imagery has been conducted to develop and refine snow enhancement techniques. A detailed photographic interpretation of ERTS-simulation imagery covering the Feather River/Lake Tahoe area was completed and the 580-680nm. band was determined to be the optimum band for fracture detection. ERTS-1 MSS bands 5 and 7 are best suited for detailed fracture mapping. The two bands should provide more complete fracture detail when utilized in combination. Analysis of early ERTS-1 data along with U-2 ERTS simulation imagery indicates that snow enhancement is a viable technique for geological fracture mapping. A wealth of fracture detail on snow-free terrain was noted during preliminary analysis of ERTS-1 images 1077-15005-6 and 7, 1077-15011-5 and 7, and 1079-15124-5 and 7. A direct comparison of data yield on snow-free versus snow-covered terrain will be conducted within these areas following receipt of snow-covered ERTS-1 imagery.

Wobber, F. J.↗

Use of satellite imagery for wildland resource evaluation in the Great Basin

The author has identified the following significant results. Upon receipt of ERTS-1 imagery, scale and resolution determinations were made. It was found that the scale was quite close to the anticipated 1:1 million, and that each ERTS-1 frame had a coverage of approximately 12,500 square miles. A water body 275 feet across was identified on the MSS 7 band as a determination of maximum resolution. Large cities were easily distinguished on all bands. Paved highways and railroads were able to be identified when there was extreme contrast between these structures and surrounding areas. Landforms were identified on all bands, but band 5 proved superior. Vegetation of varying types was identified using band 7. Fields and agricultural areas were identified as was phreatophytic vegetation. Timber, pinyon-juniper, sagebrush, mountain brush, and annual grassland communities were identified on selected frames. Phenology comparisons of selected test sites were made using sequential U-2 imagery. It was found that gray scale and color IR changes relating to the phenology of certain annual grassland, mountain brush, and marsh communities could be identified. Water bodies were identified and delineated using band 7.

Tueller, P. T.↗

Investigation of the utility of ERTS-1 imagery for updating land use and resource data in Guatemala

The author has identified the following significant results. An intensive analysis of the imagery received has been completed and findings are reported. Conclusions are restricted by receipt of only limited amounts of cloud-free coverage of test areas. In most cases the interpretation findings were as anticipated from previous experience with multiband images. Band 7 provides promising indication of some economically important environmental communities. It also permits viewing through thin cirrus cloud layers for features of medium to high contrast. Band 4 provides information of submerged reefs and of movement of suspended sediment bodies in water areas. ERTS-1 bulk images have positional mapping accuracy adequate for representation at 1:1,000,000 scale maps. Cloud cover is a true constraint to useable satellite coverage.

Garcia, L. E.↗